123 Man Stwt White Plains. Psaw York 10601 914 681.6200
- > NewWrkPbwer l;r = n,
& Authority October 22, 1984 JPN-84-69 Mr. Thomas E. Murley Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Quality Assurance (QA) Program Update (10 CFR 50.54a)
References:
1.
NYPA letter, J.
P.
Bayne to H. R.
Denton (NRC),
dated July 20, 1984 (JPN-84-48).
2.
NYPA letter, J.
P.
Bayne to H. R. Denton (NRC) dated July 20, 1984 (IPN-84-25).
3.
NRC letter, T.
T.
Martin to J. C.
Brons, dated September 20, 1984.
Dear Sir:
Enclosed are three (3 ) copies of the Authority's revised Quality Assurance (QA) Program description for the James A. FitzPatrick Nuclear Power Plant.
This submittal is pursuant to the requirements of 10 CFR 50.54(a).
The incorporation of the revised changes do not reduce the commitments in the program description previously transmitted via the Authority's letter dated June 10, 1983 (IPN-83-57).
~
The updated QA Program description was previously submitted to the NRC in Chapter 17 of the 1984 Updated Final Safety Analysis Report (Reference 1).
The revised sections are identified by a revision bar drawn'in the seargin adjacent to the portion of text actually changed and is marked with a revision number and date.
-The Authority's QA Program for Indian Point Unit 3 Nuclear Power
- Plant, which is identitical to the FitzPatrick plant, was transmitted via Reference 2.
Your staff has informed us, via Reference 3, that the proposed changes to the Indian Point 3 QA program are acceptable since they do not degrade the previously accepted program.
Sec le-23 %
C3(0 l 0
8410250044 841022 lj g@b 6 $g,0b hh i PDR ADOCK 05000333 p f \\ P PDR Wal gG e i Gl
pp i o i c .s Should'you orLyour staff have any questions regarding this matter, please contact Mr. J. A. Gray, Jr. of my staff. .Very truly yours, J' yne 6 rat Executive Vice President = Chief Operations officer cc:.-Mr.-J. Linville ' Resident Inspector-U.' S. Nuclear Regulatory Commission .P.O. Box 136 Lycoming, New York 13093 .e F m}}