ML20105B943

From kanterella
Jump to navigation Jump to search
Forwards Rev 8 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20105B943
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/16/1983
From: Sinclair J
VERMONT YANKEE NUCLEAR POWER CORP.
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
FVY-83-64, VYV-83-112, NUDOCS 8307070058
Download: ML20105B943 (2)


Text

A

,.o VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD 2.C.2.1 FVY 83-64 VEltNON, VEI1MONT 05354 VYV 83-112 June 16, 1983 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA Attention:

James M. Allan Acting Regional Administrator

References:

(a) License No. DPR-28 (Docket No. 5. 271)

Subject:

Revision 3 to the Vermont Yankee Physical Security Plan

Dear Sir:

(j This letter provides Revision 8 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.

We have determined that this change does not result in a decrease of the offectiveness of the Plan, and therefore it is forwarded for your information and use.

Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10 CFR 73.21.

Included with each copy of the change is a Change Transmittal Form.

Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan.

Document Transmitted When Separated from Herewith Contains Enclosures, Handle This SAFEGUARDS INFORMATION Document as Decontrolled

g.. d, cRI0INAIl dGine ry~g "x.g X

u-

[

I[

I 8307070058 830616 05000271 hDRADOCK i

PDR 1

~...

e..,.

W-p We trust this information is adequate; however, should you have any questions, please contact Mr. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION O

17 % O Hi Y

James B. Sinclair Licensing Engineer WTP/caf 4

)

cc: USNRC, I&E Washington, DC (5 copies)

Enclosures:

1.

Attachment A 2.

Revision 8 to Vermont Yankee Physical Security Plan O

d j.

i i

i L

o; 6

b5 9

9

...ms ei es>- f i _ r msum m N+ Nt h '

  • e h

. -