Advises That Results of Facility Specific Local to Bulk Temp Study Will Be Submitted 90 Days After LaSalle Submittal of Generic Test Program
ML20105B924
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/01/1983
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SNRC-931, NUDOCS 8307070015
Download: ML20105B924 (2)


Text

f LONG ISLAND LIGHTING COM PANY SHOREHAM NUCLEAR POWER STATION r awa_- -

P.O. BOX 610, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 Direct Dial Number July 1, 1983 SNRC-931 Mr. Ilarold R.

Denton, Director Office of Nuclear Reactor Regulation W.S. Nuclear Regulatory Commission Washington, D.C.

20555 Submittal of the Results of the Shoreham Specific Study on the Suppression Pool Local to Bulk Temperature Dif ference Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Reference:

1.

LILCO letter, SNRC-645 (J. L. Smith) to the NRC (II.

R. Denton) dated December 16, 1981, submitting Revision 5 of the Shoreham Assessment Report.

Dear Mr. Denton:

As requested by the NRC, LILCO is presently quantifying the Shoreham specific local to bulk temperature difference to provide confirmation of the 10 F value specified in Appendix I of reference 1.

The Shoreham specific local to bulk temperature difference is being derived from the LaSalle in-plant SRV generic test program.

The LaSalle results, including the test parameters have not been sent to the NRC, although a submittal is expected in the near future.

Any Shoreham specific information that could be provided prior to the generic test program submittal could only be reviewed subject to the staff's review of the generic program.

LILCO will therefore provide via letter submittal, the results of the Shoreham specific local to s

sy 8307070015 830701 FC 8935.2 PDR ADOCK 05000322 A

PDR

f-1 SNRC-931 July 1, 1983 Page 2 bulk temperature study 90 days af ter the LaSalle submittal of the generic test program.

Very truly yours, J.

L. Smith Manager, Special Project Shoreham Nuclear Power Station RT:em cc:

J. Higgins All Parties Listed in Attachment 1 p--