MONTHYEARML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML21119A3402021-04-29029 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML20105A4732020-04-14014 April 2020 Revision to Regulatory Issue Summary, RIS 2019-02 Response Preparation and Scheduling of Operator Licensing Examinations ML14063A5612014-03-0404 March 2014 Public Meeting/Open House Regarding Summer Annual Assessment - Meeting Feedback, Form 659 2023-07-26
[Table view] Category:NRC
MONTHYEARML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML21119A3402021-04-29029 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML20105A4732020-04-14014 April 2020 Revision to Regulatory Issue Summary, RIS 2019-02 Response Preparation and Scheduling of Operator Licensing Examinations ML14063A5612014-03-0404 March 2014 Public Meeting/Open House Regarding Summer Annual Assessment - Meeting Feedback, Form 659 2023-07-26
[Table view] Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] |
Text
Dominion Energy Services, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com April 14, 2020 Attn: Document Control Desk Serial No.: 19-201A U.S. Nuclear Regulatory Commission VCS-LIC/TS: RO One White Flint North Docket No. : 50-395 11555 Rockville Pike License No.: NPF-12 Rockville, MD 20852-2738 DOMINION ENERGY SOUTH CAROLINA, INC (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 REVISION TO REGULATORY ISSUE
SUMMARY
, RIS 2019-02 RESPONSE PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS DESC is submitting a revised NRC Form 536, "Operating Licensing Examination Data,"
for VCSNS Unit 1 that replaces the Form 536 previously submitted on May 16, 2019. The NRC Form 536 previously provided by VCSNS Unit 1 is being corrected to account for an operator licensing examination for calendar year 2021 . There will not be an operator licensing examination for calendar year 2022.
Also note that there will be six reactor operators and six senior reactor operator upgrades for 2021 . This is a change from the numbers provided in the May 16, 2019 submittal, which were six reactor operators, four instant senior reactor operators, and two senior operator upgrades for 2022.
The proposed primary date for the operator licensing examination for calendar year 2021 is August 30, 2021, with an alternate date of September 6, 2021 .
Should you have any questions regarding this matter, please contact Tracey Stewart at (803) 931-5663.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Dominion Energy Services, Inc. for Dominion Energy South Carolina, Inc.
Commitments contained in this letter: None
Enclosure:
Revision to NRC Form 536
Serial No. 19-201A Docket No. 50-395 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission, Region II A TIN: Operations Branch Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Shawn A. Williams U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 81-A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector V. C. Summer Nuclear Station G. J. Lindamood - Santee Cooper
Serial No. 19-201A Enclosure Revision to NRC Form 536 Virgil C. Summer Nuclear Station Unit 1 Dominion Energy South Carolina, Inc.
NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
~RREov,c:
.:,V '1,>. Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
- g
'4~' 0~
"0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear
~
i;; EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,
~.s, ., . ~o..e, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office
- "" of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 Ill I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS CY2021 CY2022 CY2023 CY2024 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6 6 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 6 6 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 08/30/2021 08/07/2023 ALTERNATE DATE 09/06/2021 09/04/2023 NRG FORM 536 (11-2017)