Provides Interim Deficiency Rept Re Reactor Bldg Spray Piping Supports Meeting ASME Allowable Stress Specs. Notification That Either Interim or Final Rept Will Be Sent by 790501
ML20104A492
Person / Time
Site: Midland
Issue date: 03/16/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
HOWE-93-79, NUDOCS 7903210133
Download: ML20104A492 (1)


Text

(( DM CCDSumETS POWar vg; Company s* n,.

,)

e.-wom : is s w.= w n. u

. mi.

. i. <sm res4.

v March 16, 1979 Howe-93-79 Mr J G Keppler, Regional Director Office of Inspection and Enforcement IEi Nuclear Regulatory Comunission Region III i {a u"L %,,f.p,g;u.--;.,,7,.,.

799 Roosevelt Road t

p

v.,

Gien murn, II, 60137 t.

.s MIDLAE NUCLEAR PLANT k

l 12:r 501, DOCKET NC 50-329 U52T 30 2, DOCKET 30 50-330 l

REACTOR RJIIDIlO SPRAY PIPID SUPPORTS Be:*erence: S I Howell letters to J G Keppler; Midland Nuclear Plant; I

Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Riector Building Spray Piplag Supports -

Serial Howe-60-78 Serial Rove-92-78, dated April 19, 1978 1

dated June 13, 17T8 2

3 Serial Rov 1-bk-

, dated August 30, 1978 4

Serial Rowe-186-78, dated October 13, 17T8 5

Serial Rowe-231-78, dated November 10, 1978 6

Serial Rowe-265-78, dated necember 15, 1778 7

Serial Eowe-36-79, dated February 1,17T9 The referenced letters and this latter are interia 50.'55(e) reports.

Reference 7 stated that the required analysis, to confirm that the i

l reactor building sprey piping supports (anchors) are within the ASIE Section III Code alloweble stresses, was completed except for six anchors la each talt. Per these anchors, the octani tias history water hammer loedlag curves have been applied to more closely provide the actum1 Icedings that would be experienced by the anchers. IIT Grianell ladicated that the results of this effort have shown these anchors to be withia Code requirenests. sowever, the fissi ITT Grinnell reports have yet to be processed throush the mechtel Engineering review cycla.

Another report, either interia or final, will be seat on or befbre may 1 908210133 b~