ML20104A233

From kanterella
Jump to navigation Jump to search
Forwards Annual Rept 1978
ML20104A233
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 02/27/1979
From: Wuller G
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20104A236 List:
References
L20-79(02-27)-0, L20-79(2-27), NUDOCS 7903050357
Download: ML20104A233 (1)


Text

.0 '

U-0088 LINDIS POWER COMPANY , <-.

L20-79(02-27)-0 f'i-i

  • 500 SOUTH 27TH STREET, DECATUR, ILLINolS 62525 FebruEry 27, 1979' Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

s Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 <

Construction Permits Nos. CPPR-137 and CPPR-138 i

Pursuant to Title 10, Code of Federal Regulations , .Part 50.71(b),

(10CFR50. 71b) and in accordance with the guidelines of Regulatory Guide 10.1, transmitted herewith are eight (8) copies of the Illinois l

Power Company Annual Report 1978..

Sincerely,

,M Georg'6 E. Wuller Licensing Administrator Generation Engineering Department GEW/jh Enclosures l cc: I. A. Peltier, NRC Clinton Project ^

l .

st 7903050357 '

9 f _ _ _ _ . _ . -