Wayne H. Jens Assistant Vice President Engineering and Construction (313) 237,3860 2000 Second Avenue 3I 31 February 27, 1979 Mr. Harold Denton Director Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Com-ission Washington, DC 20555 Re:
The Detroit Edison Company Greenwood Energy Center Units 2 and 3 Docket Nos. 50-452 and 50-453 Tear Mr. Denton:
The Detroit Edison Company, Applicant in the above captioned proceeding. hereby submits Supplement 5 to the Environmental Report-Construction Permit Stage (ER) which accompanies the Application for Licenses.
[
Supplement 5 consists of updated information to reflect changes in the design of the Greenwood Units 2 and 3 and revised regulatory requirements since 1975.
The major changes in plant design include:
(1) two single, unitized plants instead of two plants sharing major facilities such as the control building and radwaste building; and (2) use of natural draft cooling towers instead of spray canals.
In order to expedite review of the Environmental Report by the Commission Staff, Supplement 5 contains both the revised ER sections and those sections that remain unchanged.
Therefore, Applicant is submitting a complete ER, and reference to previous ER material is not required.
Very truly youts, Dh$D b
/
Al WHJ/BRM/sva Encls.