UNIVERSITY OF VIRGINIA Ir
.A, 1
DEPARTMENT OF NUCLEAR ENGINEERING AND ENGINEERING PilYSICS NUCLEAR REACTOR FACILITY II J
SCIIOOL OF ENGINEERING AND APPLIED SCIENCE L
1 P
CHARLO'ITESVILLE, VA 22901 2
February 20, 1985 Telephone: 801 924 7136 Directr r Office of Inspection and Enforcement USNRC Wast.ington, D.C.
20555
Subject:
Response to NOTICE OF DEVIATION of January 25, 1985 addressed to the University of Virginia Reactor Facility, Docket No. 50-62, License No. R-66, EA 84-111 Gentlemen:
A.
Admission or Denial of Alleged Deviation It is true that, in a letter dated Dec. 14, 1978 and addressed to the NRC, the Reactor Facility committed itself to measuring the flow rates in its laboratory fume hoods on a quarterly basis and to maintain records of the measurements.
It is also true that the NRC inspector could not be shown records of these measurements during an inspection on Oct. 1-3, 1984, although the flow rates were being measured on a quarterly basis with inspection stickers to that effect placed in the fume hoods.
B.
Reason for the Deviation It is probable that flow rate inspection records were maintained after 1978, at least for a while.
However, the Health Physics staff at the Facility has had a high turn-over rate and so it is very likely that during a change in personnel these records were disposed of or transferred from the Facility. At some point in time a new HP technician must have failed to continue keeping official records.
However, the actual measurements, which are of greater importance than the records themselves, were not discontinued.
C.
Corrective Steps The new HP staff (effective May 1984) has begun to keep the required flow measurement check records. Additionally, the Director of the Reactor Facility has asked the Reactor Health Physicist to prepare, keep and regularly update a master list of HP duties at the Facility.
This request was made notwithstanding the fact that the Director has no authority over the HP staff, because they do not belong to the Facility staff.
8 Yo 8503050470 850220
/
DR ADOCK 0500 2
()
a Director, Office of Inspection and Enforcement Page 2 l
February 20,1985 D.
Date of Full Compliance Full compliance in this matter was achieved by the time the NRC inspector left the Facility on Oct. 3, 1984.
E.
Oath I affirm under oath that the statements made above are true and correct, to the best of my knowledge. OO Date:
10,l9W Robert IJ.
Mulder, Director U.Va. Nuclear Reactor Facility cc: Mr. James P. O'Reilly, USNRC Regional Adm., Region II b
. Sworn to and su scribed tafere me th!s
-f day of tM 19 Witnebss awe: Elfbee.
L
~'-
1.,1..-
.