ML20102C190
| ML20102C190 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/02/1985 |
| From: | Lodge T LODGE, T.J., SUNFLOWER ALLIANCE |
| To: | Atomic Safety and Licensing Board Panel |
| Shared Package | |
| ML20102C140 | List: |
| References | |
| OL, NUDOCS 8503050354 | |
| Download: ML20102C190 (1) | |
Text
l I
- a l
. UNITED STATES OF AMERICA
-. ??
NUCLEAR REGULATORY COMMISSION O'E Before the Atomic Safety and Licensing Board:
In the Matter of
)
{"f _, [ 5 E v. q,
)
-y p p,St u ce THE CLEVELAND ELECTRIC
)
Docket Nos. 50-440"aGd"50-441 ILLUMINATING COMPANY
)
)
(Perry Nuclear Power Plant,
)
Units 1 and 2)
)
)
i SUNFLOWER'S STATEMENT OF MATERIAL FACTS (CONTENTION 0)
Now comes Sunflower Alliance and avers the following facts in opposition to summary disposition of Contention 0:
1.
Ashtabula County's Radiological Emergency Response Plan does not address means by which protective measures within the EPZ would be relaxed.
It states in Section M.3:
If contaminated areas are identified, the Ashtabula County EOC Direction and Control Group will coordi-nate with the ODSA and the ODil to develop methods and procedures for decontamination.
Depending on radiation levels, residents may be permitted limited access to any such areas.
The EOC Direction and Control Group will coordinate with the ODSA and the ODH on all decisions to permit reentry to residents of evacuated areas.
Respectfully submitted.
By
[1,tX '
J l
[6 orry..
Lodge
.8 N.
lichigan Street j
site 105 ledo, Ohio 43624 Phone: (419) 255-7552 i
8503050 g g od l
Counsel for Sunflower PDR A
l PDR Alliance G
l
-