Submits Addl Info Re TS Change Request NPF-38-122,per Generic Ltr 91-08 Re Removal of Component Lists from Ts,In Response to NRC Request.Lower Voltage Circuit Breakers Subj to Functional Test Per GE Recommendations
ML20102B343
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/23/1992
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-91-08, GL-91-8, W3F192-0303, W3F192-303, NUDOCS 9207280333
Download: ML20102B343 (2)


Text

)

~~d!!!!

~

== ENTERGY 5 '""?"*"*" '"* '

m. m -

4 IO $04 73)67/4 R. F. Durski rw 4<

u.c u,

G n +. sq s W3F192-0303 A4.05 QA July 23, 1992 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 dubject:

Waterford 3 SBS Docket No. 50-382 License No. NPF-38 Technicar Specification Change Rcquvat NPF-38-122 Additional Information Gentlemen:

Per your request the following additional information is being provided concerning the subject Technical Specification Change Request.

In accordance with Generic Letter 91-08 " Removal'of Component Lists from Technical Specifications" TS 4.8.4.1.a.2 was-revised to include a note from table 3.8.1 (note II.6'page 3/4 8-51b) which constitutes an exception to the TS requirement.

TS 4.8.4.1.a.2 concerns the functional testing of lower, voltage circuit breakers and states that the test "shall-consist of injecting a current in excess of the breaker's nominal setpoint and measuring tne response-time."' This test method is not applicable for the General Electric low voltage (480-volt) power circuit breakers as these breakers are equipped with external solid-state overcurrent trip devices.

The staff questioned if

" Channel Calibration" could be used to describe the~ test performed on: these breakers.

The answer is n).

These breakers are' subjected to a functional test in accordance with General Electric's recommendations rather than a channel calibration.

In responding to your question it was observed where the existing TS note 11s misicading in'that it refers-to testing'in accordance with the " vendor's calibration procedures".

Testing'of these specific breakers per TS-4.8.4.1.a.2 is actually performed in 4

accordance with Waterford 3 Maintenance Electrical Procedure ME-003-314, " General-Electric ECS and SST Programmers" which is t

based on'the manufacturers' recommendations.

Therefore, the asterisk note on our proposed TS change (page 3/4:8-17)_should be clearified by removing the reference to " vendor's calibration procedures" and inserting " manufacturer's recommendations".

In DD$koh00h$gy PDR I O v

.j 1

...e

<U.S.

Nuclear Regulatory Commission Technical Specification Change Request NPF-38-122 Additional Information W3F192-0303 Page 2 July 23, 1992 uddition, the exception which states "... external protective relays," should be clearifiod by stating "... external trip devices," which is consistent with the description usod by the manufacturer.

Should you have any additional concerns regarding this issue, please contact Paul Caropino at (504) 739-6692.

Very truly yours,

'b' Nuc ar Safety s-RFD/PLC/dc cc:

J.L. Milhoan, NRC Rogion IV D.L. Wigginton, NRC-NRR R.B. McGeheu N.S. Reynolds NRC Resident Inspectors Office Administrator Radiation Protection Division (State of Louisiana)

American Nuclear In=urers

./