ML20102B278

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 85 to EPIP FNP-0-EIP-8, On-Call Schedule
ML20102B278
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/08/1992
From: Hudspeth J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20102B280 List:
References
NUDOCS 9207280299
Download: ML20102B278 (1)


Text

4 Southern Nuclear Operatog Company J M Farley Nuclear Plant P. O Drawer 470 Ashford, Alabama 36312

. Telephone 205 899 5156 o

Southern Nudear Operating Company the southern electnc system i

7-8-92 US Nuclear Regulatory Commission ATTN Document Control Desk Washington, DC 20555

Dear Sir:

In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to Emergency Plan Implementing Procedure FNP-0-EIP-8, attachment.

Please incorporate this new revision into your files and discard the old revision.

If duplications are made of this procedure pleaso ensure that the stamp with your controlled copy number is covered before copying.

Enclosed is a self-addressed-stamped envelope and a copy of our transmittal form.

Please sign and return this form to the following address:

Southern Nuclear Operating Company Parley Nuclear Plant P.O.

Box 470 Ashford, Al 36312 If you should have any questions, please call me at extension 2422, 205-899-5156.

Sincerely, a

M '1[. Hudspeth FNP Document Contr. Supervisor JBH:rab cc: Larry Enfinger Committment Tracking (2)

File f: 1) t l ti v I

\\l

,n I

.s u m s-pr 9207280299 92070s

/

hDR ADOCK 05000348 i

-PDR I..