b' 8 .

E t

UNITED STATES OF AMERICA

- NUCLEAR REGULATORY COMMISSION E BEFORE THE ATOMIC SAFETY AND LICENSING BOARD i

E Yr r ' -f RO :15 Y In the Matter of )

)

~

E -

THE CLEVELAND ELECTRIC ) Docket Nos. 50-440 __ ,

ILLUMINATING COMPANY ) 50-441 -

)

t (Perry Nuclear Power Plant, )

E Units 1 and 2) )

E

_ , AFFIDAVIT OF

= DANIEL D. HULBERT ON CONTENTION B County cf Lake )

E ) ss g State of Ohio )

~

Daniel D. Hulbert, being duly sworn, deposes and says
1. I am presently Emergency Planning Coordinator, Perry Plant Technical Department, The Cleveland Electric Illuminating h Company. My business address is 10 Center Road, Perry Ohio

=

Fj 44081. In my position, I am responsible fibr developing,

- t

[ maintaining, and evaluating the Perry Nuclear Power Plant M

k (PNPP) Emergency Plan, including coordinating emergency 5

1 preparedness among various PNPP departments and developing emergency planning documents and specifications of response L

requirements.- These responsibilities incivde the plans and instructions governing evacuation of e -Ilte' personnel. A i current statement of my professional and technical qualifications is attached hereto. I have personal knowledge E

f of the matters stated herein and believe them to be true and a

r

? I k

8502080576 850205 PDR ADOCK 05000440 G PM

4 correct. I make this affidavit in support of Applicants' Motion for Summary Disposition of Contention B.

2. Contention B states in part that the evacuation of construction workers on-site has not been included in emergency plans. This part of Contention B is incorrect. The Perry Nuclear Power Plant Emergency Plan specifically provides that 4 all personnel without emergency response functions will be evacuated at a Site Area or a General Emergency level event.

PNPP Emergency Plan, S 6.4.1. Procedures implementing the PNPP Emergency Plan provide for evacuation of such personnel on a Site Area Emergency. Construction workers on-site do not.have i

emergency response functions, and would therefore be evacuated in the event of such an emergency. The plan also describes the routes to be used by non-essential personnel to evacuate the site. PNPP Emergency Plan, Fig. 6-7, sheets A-C.

3. In summary, the Parry bacrgency Flan specifically includes the evacuation of non-essential personnel, including conutrusil6n eforAsis.

u,. A ,

Y / 5-r a, A -

DANIEL D. HULBERT

. Subscribed and sworn to before me this d day i

of 7AAJt)ARY , 1985.

[yota'Ify Public ph JOSEPH C. SZWEJK0WSKI Notary Public, State of Ohio Ceyt C'v My Commission Expires: uf coc.rr..ssion Dpires July 14, 1986 n

t i

I l

l' Name: Daniel D. Hulbert, Emergency Planning Coordinator, Perry Plant Technical Department 4

Formal Education and Training:

Electrician's Mate School, U. S. Navy, l'973-1974 Nuclear Power Training, U. S. Navy, 1974-1975 Engineering Laborato ry Techcician School, U. S. Navy ,1975 One-Week Basic BWR Systems (PDF), 1980 Fif teen-Week Davis-Besse Nuclear Power Station (Emergency Planning), 1980 Eigne-Waek Davis-Besse Nuclear Power Station (Evacuation Time Estimates),

1981 One-Week Electrical Fundamentals II, 1981 One-Week Planning for Nuclear Emergencies Course, 3arvard School of Public Health, 1982 Experience:

1979 - Present: The Cleveland Electric Illuminating Company Joined CEI as an Engineering Technician and assigned to development of ths PNPP Emergency Plan. Assisted in the preparation of the Davis-Besse Nuclear Power Station Emergency Plan, implementacts.g procedures, and the Davis-Besse education time estimates. Partici-pated in several Emergency Plan exercises at other Nuclear Power  !

Plants as an of ficial Exercise Observer. In 1982 promoted to present position of Emergency Planning Coordinator. Reports directly to the Technical Superintendent, Perry Plsnt Iechnical Department.

1973 - 1979: U. S. Navy Electrician's Mate - Qualified as Engineering Laboratory Technician, Electrical Operator and Shutdown Reactor Operator on a S5W Class Submarine. -Duties included operation and maintenance of electrical systems, chemistry controls for both primary and secondary plant, ape routine and emergency health physi'es coverage. As signments included one tour on an S5W' Submarine and one tour assigned to the

~

Radiological Controls Division of a Submarine Tender. ,

m_