<1 Wayne H. Jens --
- .)'
Vice President' l_
. Nuclear Operations Fernwt 6400 Norttr Oxie Highway -
Newport, Mchigan 48166
- -(313) 5864150' January 25, 1985 EF2-70238
~
- Mr.. James.G. Keppler j
-n. ' Regional Administrator ~
Region ^III.
U. S. Nuclear Regulatory Commission 799 Roosevelt ~ Road
' Glen Ellyn, Illinois 60137
Dear Mr.LKeppler:
i
Reference:
(1)
Fermi 2
~
NRC Docket No. 50-341
-( 2 )
Letter, W. H. Jens to J. G. Keppler December 18, 1984, EF2-70221
Subject:
Detroit Edison Amended Response Inspection Report 50-341/84-37
' Reference 2 provided Detroit-Edison's -response to the items C -
-of noncompliance identifiedEin.your Inspection Report No.-
'50-341/84-37.. During :a subsequent telephone discussion.
between Messrs. S..DuPont,;D. Hills,and M. Ring of yourl office'and: Detroit ~ Edison's Messrs. F. Abramson and J.
Conen, Detroit-Edison agreed to take_ additional steps to address your inspectors' concerne : egarding Item 84-37-01..
The enclosed response describes additional corrective
- actions:to prevent recurrence and the'date when'these actions will'be' fully-implemented.
JC _
We trust;this letter satisfactorily responds,to the concerns-identified;by your. inspectors.
~
q
~
<IfTyou!have' questions regarding.this matter, please1 contact Mr.: Lewis:Bregni,-(313)L 586-5083..
Sincerel 50 m
!- ! cc:'
~P.- M.c Byron
~R.-C. Knop USNRC,iDocument Control Desk Washington,'D.C.;.20555 FEB 1 1985-
-=
c y
i 3f jg ' "
o -.r a'
S.
s t
t AMENDED RESPONSE TO NRC INSPECTION REPORT ITEM NO. 50-341/84-37-01 o
4 t
Corrective Action Taken to Avoid Further Noncompliance LDuring!the investigations related to this item of non-Lcompliance, Detroit Edison concluded that more explicit guidance 'on the use of the' Abnormal Lineup Sheet ( ALS) was
- appropriate.
A change has-been issued to POM 21.000.01,
~
[ ;B "Sh'ift Operations and Control Room" to clarify-when the use of,an:ALS.isLrequired.
This procedure is included in the 6
. operators'irequired reading.
- InLaddition, Plant Order EFP-1081, " Authorization for Equip-ment Operation,":has been issued.
This order specifies that allioperationiof-devices under the jurisdiction of th6 plant Operating Authority 1shall be performed by operating 1.srson-
- nel unless?specifically-authorized.by the shift supervisor or.his designee.
This order is included ~as required. reading 4
~
for. appropriate ' maintenance and. technical (IEC) personnel by_
revision -of ;the. Technical ~ Section Indoctrination Card :in POM Procedure-41.000.04 and by. addition to the required' reading aspecified by;the Maintenance Engineer, general. Foreman,.and
~
- group'. supervisors
- under POM~ Procedure 31.000.07.
a
~
Date'When Full' Compliance-Will Be-Achieved
_ p*
The-required = reading lists and Technical Sec' tion Indoctrina-tion Card:h_ ave been revised.
Training of;the affected
' maintenance and IEC. personnel will be completed-by January, x
--30,;1985.
4
(
zi W
p
'NJ
' % [,
?
p_
a
~k.
s i.
4 c
x.
n
,y.'(V'_..
b
- s; -
r
,e' W
h "i
~
g
~)
.- ~ '
3
~ 5 "f
s e
A
(
,[',
's 7
-c.
4 9,
+.
st F
.?;f?
'l.
d h
~
,.. z a,
.b.^
N y
+
)
m g.,
- e Q # '.
77
- ~
.