ML20102A589
| ML20102A589 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 07/21/1992 |
| From: | Pelletier J VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20102A590 | List: |
| References | |
| BVY-92-91, NUDOCS 9207270133 | |
| Download: ML20102A589 (1) | |
Text
__
VERMONT YANKEE NUCLEAR POWER CORPORATION rerry naad, erattieboro, vT 05301-7002
,, 7 g,
, N}/ )
vice President, Engineering C
(802) 257-5271 July 21,1992 BVY 92-91 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
a)
License No. DPR 28 (Docket No. 50-271)
Subject:
1992 Vermont Yankee Reactor Containment Building Integrated Leaker,e C a Test Report
Dear Sir,
~
In accordance with the requirements of 10 CFR 50, Appendix J, Section V.B.3, we hereby submit a copy of the report entitled " Reactor Containment Building integrated Leakage Rate Test".
We trust that the enclosed information is satisf actory; however, should you have any questions or desire any additionalinformation on this issue, please do not hesitate to contact us, Very truly yours, Vermont Yankee Nuclear Power Corp.
PW-ames P. Felletier Vice President, Engineering JPP/gmf Enclosure cc:
USNRC Region i Administrator USNRC Resident inspector - VYNPS USNRC Project Manager - VYNPS A
{\\ > s lEl72;ggggoggggg,,
1 P