-u BALTIMORE GAS AND ELECTRIC CHARLES CENTER e P.O. BOX 1475-
- BALTIMORE, MARYLAND 21203 1475 R E.DENTON GENERAL MANAGER CALVERT CLIFFS July 14,1992 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk SUBJECI':
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 June 1992 Oncratine Data Reports
- Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
+
Should you hr.ve any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.
Very truly yours, I
RED /LBS/bjd Attachments D. A. Brune, Esquire cc:
J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McLean, DNR J. II. Walter, PSC R. A.Hartfield,NRC P. Lewis,1NPO K. Larson, ANI
$3
/k 9207200137 920630 ADOCK0500g7 DR
~
-Aco*************************************************************************=
UNITf1-OPERATING' DATA REPORT c60*************************************************************************
Docket No.-50-317 July 14, 1992 Prepared by Leo Shanley Telephone:(410)260-6744 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1 12.-REPORTING PERIOD JUNE 1992 3.-1 LICENSED THERMAL POWER (MWT)-
2700 4.-NAMEPLATE RATING (GROSS-MWe) 918 5.
DESIGN ELECTRICAL RATING: (NET-MWe) 845 16.cMAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y_(NET MWe) 825
- 8. CHANGE'IN' CAPACITY RATINGS NONE
-9.
POWER LEVEL ~TO>WHICH RESTRICTED N/A 10.: REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date-L11.iHOURS IN REPORTING PERIOD _
720 4,367 150,324 12.-HUMBER OF-HOURS REACTOR'WAS CRITICAL 0.0 1,882.0' 105,181.8 13.-REACTOR' RESERVE SHUTDOWN HOURS 0.0
-0.0 3,019.4-14.JHOURSLGENERATOR'ON'LINE
- 0. 0_
1,881.1 102,931.6 115; UNIT RESERVE SHUTDOWN' HOURS.
0.0 0.0 0.0 16.< GROSS THERMAL ENERGY-. GENERATED (MWH) 0 5,052,583 259,389,090
- 17. GROSS! ELECTRICAL ENERGY.' GEN'TED(MWH) 0 1,676,717 86,212,405-
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
_0 1,609,202-81,964,707 19.; UNIT SERVICE: FACTOR-0.0 43.1.
68.5 20.cUNIT AVAILABILITY FACTOR-0.0-43.1 68.5
'21. UNIT' CAPACITY FACTOR (USING MDC NET) 0.0
'44.7 66.1
- 22. UNIT-CAPACITY FACTOR (USING DER NET)-
0.0 43.6 64.5
- 23. UNIT FORCED OUTAGE RATE--
0.0 1.3 9.3
- 24. SHUTDGWNS SCHEDULED OVER THE NEXT SIX MONTHSi(TYPE, DATE_AND DURATION):
- 4 N/A
- 25.sIF SHUTDOWN AT END-OF REPORT-PERIOD, ESTIMATED DATE OF START-UP:.
July 28, 1992
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKETNO-50-317 UNrrNAME Cshrrt Clif75-U1
)
DATE Juiv 14.1WZ COMPLETED BY Leo Shaniev
'IFT FPHONE f41012 6 44 REPORTMONTII June f 992 I
METl!OD OF SHUT 11NG UCENSEE CAUSE A CORRECINE I'tJRNDON DOWN EVENT SYS'EM COMPONENT ACTION TO d
S PREVENT RECURRENCE 2
REACTOP.3 REPORT #
CODE CODE NO.
DATE TYPEI (IIOURS)
REASON 92-02 ' 920320 S
720.0 C
4 Centinued refueling outage from previous mentfL I
i l
.I t
4 l
l L
4 IEEE Standard 805-1984 3 Method-2 Reascn:
I p-Forced S:
Scheduled A-Equipreent Failure 1-Manual B-Maintenance or Test 2-Manual Scram-C-Refueling 3-Automatic Scram-D-Regulate. Restriction 4-Continued E-Operator Training & License Examination 5-Reduced Load S IEEE Standard 803A-1983 F-Administrative 9-Other G-Operational Error H-Other e
.w, i
... -. _ _ - _ _.. - - ~
A I
i AVERAGE DAILY UNIT POWER LEVEL coo *4********namese*****************************************=***********
Docl.bc No. 50-317 Calvert Cliffs Unit llo. 1 July 14, 1992 Prepared by Leo Shanley Telephonet (410) 260-6744 JUNE 1992
- ce***
Acorage Daily Power Level Avorage Daily Power Level Day
' (MWe-!!at)
Day (liWo-Not) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5-0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
t i
4 DOCKL7T #50-317 CALVERT CLIFIL UNIT 1 July 14,1W2
SUMMARY
OF OPERATING !?XPERIENCE June 1992 The unit began the month defueled in a scheduled refueling outage.
De following items were completed this month:
- SO secondary side modincations Saltwater header work 11 EDO overhaul The reactor was refueled from June 14 to June 18. The reactor vessel head was tension:ed and the unit entered Mode 5 on June 24.
The unit ended the month in Mode 5 with preparations being made for an Integrated leak Rate Test and a mid tolate Julystartup.
}
[
4
- - - -- A
Jul'y 6,1992 Ef M BO_INFORMATIDN RE0 VEST 1.
Name of faciltty-Calm *, Cliffs Nuclear Powt. Plant, Unit No. 1.
2.
Scheduled date for next refueling shutdown: Narch 20, 1992**.
3.
Scheduled date for restart following refueling:
4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
None*.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
None.
6.
Important licensing considerations associated wtth the refueling.
None.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storaga pool.
(a) 217*.
(b) 1370*.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in nuinber of fuel assemblies.
(a) 18 3.
(b) 2880.
9.
The projected date of the last refueling that can be discharged to the Spent fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
~
March 1993
- Entry has changed since last reported.
1
- OUTAGE START DATE. Unit currently in a refueling outage.
- Unit curtently in a refueling outage.
See the Operating Report for Restart Date.
l
~.
t covke**************e.*,**********************************ke******************
UNIT'2 i
OPERA 11NG DATA REPORT coce************************************************************************
Docket No. 50-318 July 14, 1992 Prepared by Leo Shanley Telephones (410)260-6744 OPERATING STA.TUS
- 1. UNIT NAME Calvert Cliffs Unit 2 JUNE 1992 1
- 2. REPORTING PERIOD 3.
LICENSED THERMAL. POWER (MWT) 2700 4, NAMEPLATE RATING (GROSS MWe) 918 S.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 l
- 7. MAXIMUM DEPENDABLE-CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date 11.. HOURS IN REPORTING PERIOD 720 4,367 133,679
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL-555.4 3,819.2 95,859.5
'13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR'ON LINE-555.4 3,783.2 94,505.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS. THERMAL ENERGY GENERATED (MWH) 1,496,935 10,113,665 240,252,971
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 488,643 3,345,327 79,429,708
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 468,620 3,210,394 75,888,542
-19. UNIT SERVICE FACTOR 77.1 86.6 70.7-
- 20. UNIT AVAILABILITY FACTOR 77.1 86.6 70.7
'21. UNIT CAPACITY FACTOR (USING MDC NET) 78.9 89.1 68.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 77.0 87.0 67.2
- 23. UNIT FORCED OUTAGE RATE.
22.9 13,4 5.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATICt');
N/A
-25.--IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, i
ESTIMATED DATE OF START-UP:
July 7, 1992
1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-318 UNITNAME Calvert Cliffs-U2 DATE July 14.1992 COMPLETED BY Leo Shantev TELEPHONE (4101260-6744 REPORTMONTII.Inne1992 MEDIOD OF SIIUTHNG LICENSEE CAUSE A CORRECHVE DURATION DOWN EVENT SYSTEM COM?ONENT ACHONTO NO.
'DATE TYPE 1 (HOURS)
REASON 2 REACIUR3 REPORT #
CODE 4 CODES PREVEST RECURRENCE 92-05 920624 F
164.6 A
2 92-003 SG EXJ
- 1) Unit was manuatly tripped due to loss of vacuum in the Main Condenser. Cause sus t!x:
fzilure of 21 condenser expansion joint.
- 2) Expansion joint was replaced.
- 3) Root cause analysis and further corrective actions are being investigated.
4 t
9 1 F:
Forced 2 Reason:
3 Method:
4 IEEE Standard 805-1%4 S:
Scheduled A-Equipment Failure 1-Manual B-Maintenance or Test 2-Manual Scram-C-Refueling 3-Automatic Scram _
i D-Regulatory Restriction 5-Reduced Load 4-Continued E-Operator Training & License Examination F-Administrative 9-Other 5 IEEE Standard 803A-1983 G-Operational Error H-Other
?n
- 24 :.
l AVERAGE DAILY UNIT POWER LEVEL oco**(******************************************************************
Docket-No. 50-318 Calvert Clifis Unit No. 2 July 14, 1992 Prepared by Leo Shanley Telephone: (410) 260-6744 JUNE 1992 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 855 17 842 2
851 18 844 3
854 19 844 4
855 20 840 5
_850 21 838 I
6-849 22 840 7
848 23 841 8
847 24 86 9
845 25 0
L 10 842 26 0
l l
11 841 27 0
12 842 28 0
1 1c 13 843 29 0
14 845 30 0
15 843
'16 841 c.
% s.
DOCKET #50 318 CALVERT CLIFFS. UNIT 2 July 14,1992
SUMMARY
OF CPERATING EXPERIENCE June 1992
'Ihe unit began the month at 100% pow (RSS MWe).
Power was reduced to 98% at 0435 on June 5 due to !mlications hat condenscr cooling v>ater differential temperature was greater than 120F. The unit was returned to 100% power at 0510 after operators determhed that the actual differential temperature war les than 120F.
The unit was manually tripped at 0309 on June 24 due to decreasing vacuum in the Main Condenser.
The cause was a ruptured expansion joint between the turhine and 21 Condenser. The unit was
= cooled down to Mode 5 on June 25 tor repairs.
The expansion joint was replaced but the unit remained in Mode 5 to replace 22 Containment Air Cooler's Imwer cables.
L'
~,
i f.
July 6,1992 REFUELING INFORMATION RE0 VEST 1.
Name of facility:
Calvert Cliffs Nuclear Power Plant Unit No. 2 2.
Scheduled date for next refueling shutdown:
March 5, 1993.
3.
Scheduled date for restart following refueling:
May 27, 1993.
4.
Will refueling or resumption of operation thereafter require a Technical Specifia.ation change or other license amendment 7 Not identified at this time.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
December 4, 1992.
6.
Important licensing considerations associated with the refueling.
The target length for this cycle will be 570 effective full power days.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel torage pool.
(a) 217.
(b) 1370*.
Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage ca)acity, ano (b) the size of any increase in licensed storage capacity t1at has been requested or is planned, in number of fuel assemblies.
(a) 1830.
(b) 2380.
9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 1993
- Entry has changed since last reported.
1 i
' _