ML20101R866
| ML20101R866 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 07/02/1992 |
| From: | Kofron K COMMONWEALTH EDISON CO. |
| To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20101R867 | List: |
| References | |
| BW-92-0358, BW-92-358, NUDOCS 9207160249 | |
| Download: ML20101R866 (1) | |
Text
._
g-
/
\\ Commonw;cith Edison
) Drcidwood Nuclear Power Station njchtit senI68
[
-- Route 01. Box 64
[rlWr
- dl r
+
\\
c-~
Braceville. Illinols 84 807 fi r
(
Telephone 815/458 5B01 p
,7 l
Nfl u f;gd, Wi-i
$1 Q July /92-0358 2,1992 UW i
Mr. A.13ert Davis Administrator Nuclear Regulatory Commission Region III 799 Foosevelt Road Glen Ellyn,IL 60137
Dear Mr. Davis:
The 1990 and 1991 Annual Environmental Operating Reports for Braidwood Station were submitted in A>ril of 1991 and 1992, respectively, in accordance with our technical specificat) ons. Since the submittal, some clarifications and corrections have been identified. The attached errata sheet identifies the clarifications and corrections to update the reports information previottsly provided.
Two copies of the attached errata are provided for your use. All previously distributed annual report recipients will also receive the errata update.
w/
'j/ A /
- c..
K. L. Kofron N Station Manager liraidwood Nuclear Station KLK/KA/dla 532CGEN Enclosure JUL 10 812 9207160249'920702 PDR ADOCK 05000456 I
R pop l
- -.