Monthly Operating Rept for June 1992 for Joseph M Farley Nuclear Plant
ML20101R720
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/30/1992
From: Hill R, Woodard J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9207160161
Download: ML20101R720 (5)


Text

_

ht M ,

R 9Y- .. .

e

..L>

. W ' ' l*j ,

l Q g , t

+

Tb ~

- Post Offes Box 1295 _ .. ,

G . . Bemirgham, Alabama 3S201

"~ f Telephone 20$ 668-5086 l

'1 .

+* *

~

,,, o, woa ,e Southem Nudear Operating Company a M['p'ly7 .J61y 13,'1992 tN wmem eMrc pem -  ;

'p.

w _ .;

i

-. i Docket No, 50-348 U - Si- Nuclea'r Regulatory ' Commission co ~

LATTN:4 ; Document- Control- Desk

-Washington, D.-C. 20555 -

7 Joseph-M; Farley Nuclear P1 ant -

Unit-1 Monthly Operatina Data' Report

+

=: Gentlemen: -

Attached < is = theJJune 1992'Honthly Operating Report- for Joseph M. Farley -

4 ' Nuclear.. Plant Unit -1,.Las required by Section 6.9.1.10 of the Technical Specjfications. - 4 ij

.If-youhaveanyquestions,pleaseadvise.-

Respectfully submitted, c Q.hh JJ DT Woodard

/

fAEJ:edb3014 +

~.

? Attachments!

~

.cc: 'Mr. S.'D.~ Ebnete'rJ

.Mr. S.-T. Hoffman

.Mr.;G. F. Maxwell- .

(

)

6R A l

,, 8 a

L JOSEP11 M. PARLEY NUCl. EAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS June 1992 There vere no unit shutdowns or major power reductions during the month of June.

The following major safety-related maintenance was perforced during the month:

1. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

f

OPERATING DATA REPORT

=.

DOCKET No. 50-348 DATE July 6, 1992 -

COMPLETED BY R. D. Hill TELEPHONE (205)899-5156 iPERATING STATUS

~

Notes

1. Unit Name Joseph M. Farley - Unit 1 1) Cumulative data since
2. Reporting Period: June 1992 12-1-77, date of
3. Licensed Wermal Power (Mit): 2,652 commercial operation.
4. Nameplate Rating (Gross PMe): 860
5. Design Electrical Rating (Net PMe): 829-
6. Maximum Dependable Capacity (Gross Fe): 855.7
7. Maximum Dependable Capacity (Net Mie): 812.0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net ?Me): N/A
10. Reasons For Restrictions, If Any: N/A s his Month Yr-to-Date Cunnlative >
11. Hours In Reporting Period 720.0 4,367.0 127,823.0
12. Number Of Hours Reactor Was Critical 720. F 4,367.0 100,277.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 720.0 4,157T 98,631.3

~

0.C 0.0 0.0

15. Unit Reserve Shutdown Hours
16. Gross hermal Energy Generated (MWH) T/9U7,928.4 11,527,961.4 252,932,585.5
17. Gross Electrical Energy Generated (t%H) 608,956.0 3,729,536.0 81,514,298.0
18. Net Electrical Energy Generated (!%H) 578,042.0 3,540,906.0 76,955,704.0
19. Unit Service Factor 100.0 100.0 77.2
20. Unit Avsilability Factor 100.0 100.0 77.2 ~

9W

~

21. Unit Capacity Factor (Using MDC Net) 98.9 74.4
22. Unit Capacity Factor (Using DER Net) 96.8 97.8 72.6
23. Unit Forced Outage Rate 0.0 0.0 6.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, September 25, 1992, approximately 60 days.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 CCP1MERCIAL OPERAI'ICN 12/01/77 12/01/77 Form 2/34

_w _ _ _ _ - - _ _ _ _ _ _ _ _ _

L e.

- ' DOCKET NO. 50-348 UNIT 1 DATE July 6, 1992 3 --

COMPLETED BY R D. Hill TELEPHONE (205)899-5156 MONTH June DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net) (MVe-Net) 1 811 17 800 2 8 18 803 3 808 19 798 4 805 20 801 5 804 -21 799

'6- 804' 22 808-7 781 23 806 8 -- 802- 24 802 9 804 25 800 10 - 800 26 802

.(;

11 803 27 803-12 805 28 804 13 805 29 802

.14 - 805 30 804

'15 805 31 16 -802

INSTRUCTIONS On this format, list the average. daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole llegawatt, i-l

( .. Form 13/21-9

~ UNIT SHUTDOWNS AND POWER REDUCTIONE DOCKET No. 50-348 ', ^

UNIT NAPTE J. M. FARLEY - UNIT 1 .

DATE July 6. 1992 i COMPLETED Bf R. D. RILL REPORT MONTH JUNE _

TELEPHONE (205)S99-5156 ,

l CAUSE & CORRECTIVE l j l l l l lMETHODOF l LICENSEE l l l EVENT l SYSTEM l COMPONENT l ** TION TO l l l l l DURATION l l SHUTTING I 3 4 S PREVENT RECURRENCE'- l l(HOURS) l REASON 2lDOWNREACTOR l REPORT # l CODE l CODE l lNo. lDATE l TYPE lThere were no unit shutdowns or major power reductions during the fronth of June. l l l 1 l l 1 l l l l l l I I I i I I I I i 1 1 I I I I I I I i i i I I I I I I i i I I I I i I I I I I I I I i l I i l I I i I I I I I i i i i i l i l I I i '

l  ! I I l l i I i l I I I I I I I I i i I I l i l I i l i i i i i I I I I I i I I I I I I I I I i I I I I I I i i i I I I i i  ! I i i l I i i i i I i l 1 I I I I l I i i l l I I

I i i  ! i i l i I I i i 1 I I I I I i i I I I I 1 I I I I I I I I i l i i i i l I I I l i l I i I I I i i i I I I I I I I I I I l

I I I I I I I I I I I I I I I l I I I I I I I I I  !

I I I I I I I I:F Forceri 22eason: 3 Method: ' Exhibit G-Instructions A-Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F- Acininist rat ive 5 Exhibit I -Same Source G-Operational Error (Explain)

(9/77) H-Other (Explain)