ML20101R720
| ML20101R720 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/30/1992 |
| From: | Hill R, Woodard J SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9207160161 | |
| Download: ML20101R720 (5) | |
Text
..
ht M R
9Y-...
..L>
e
. W ' ' l*j l
Q g
t Tb
- Post Offes Box 1295 _..
+
~
- G.. Bemirgham, Alabama 3S201
"~ f Telephone 20$ 668-5086 l
'1.
+*
~
Southem Nudear Operating Company a
,,, o, woa,e M['p'ly7
.J61y 13,'1992 tN wmem eMrc pem -
'p.
w i
-. i Docket No, 50-348 U - Si-Nuclea'r Regulatory ' Commission co LATTN:4 ; Document-Control-Desk
~
-Washington, D.-C.
20555 7
Joseph-M; Farley Nuclear P1 ant -
Unit-1 Monthly Operatina Data' Report
+
=: Gentlemen: -
Attached < is = theJJune 1992'Honthly Operating Report-for Joseph M. Farley -
4
' Nuclear.. Plant Unit -1,.Las required by Section 6.9.1.10 of the Technical Specjfications.
4
.If-youhaveanyquestions,pleaseadvise.-
ij Respectfully submitted, c
Q.hh JJ DT Woodard
/
fAEJ:edb3014
+
~.
? Attachments!
- .cc: 'Mr. S.'D.~ Ebnete'rJ
~
.Mr. S.-T. Hoffman
.Mr.;G. F. Maxwell-(
6R A
l
)
8 a
L JOSEP11 M. PARLEY NUCl. EAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS June 1992 There vere no unit shutdowns or major power reductions during the month of June.
The following major safety-related maintenance was perforced during the month:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
f
OPERATING DATA REPORT
=.
DOCKET No. 50-348 DATE July 6, 1992 COMPLETED BY R. D. Hill TELEPHONE (205)899-5156 iPERATING STATUS Notes
~
- 1. Unit Name Joseph M. Farley - Unit 1
- 1) Cumulative data since
- 2. Reporting Period:
June 1992 12-1-77, date of
- 3. Licensed Wermal Power (Mit):
2,652 commercial operation.
- 4. Nameplate Rating (Gross PMe):
860
- 5. Design Electrical Rating (Net PMe): 829-
- 6. Maximum Dependable Capacity (Gross Fe):
855.7
- 7. Maximum Dependable Capacity (Net Mie):
812.0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net ?Me):
N/A
- 10. Reasons For Restrictions, If Any:
N/A s
his Month Yr-to-Date Cunnlative
- 11. Hours In Reporting Period 720.0 4,367.0 127,823.0
- 12. Number Of Hours Reactor Was Critical 720. F 4,367.0 100,277.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-Line 720.0 4,157T 98,631.3
- 15. Unit Reserve Shutdown Hours 0.C 0.0 0.0
~
- 16. Gross hermal Energy Generated (MWH)
T/9U7,928.4 11,527,961.4 252,932,585.5
- 17. Gross Electrical Energy Generated (t%H) 608,956.0 3,729,536.0 81,514,298.0
- 18. Net Electrical Energy Generated (!%H) 578,042.0 3,540,906.0 76,955,704.0
- 19. Unit Service Factor 100.0 100.0 77.2
- 20. Unit Avsilability Factor 100.0 100.0 77.2 ~
- 21. Unit Capacity Factor (Using MDC Net) 98.9 9W 74.4
~
- 22. Unit Capacity Factor (Using DER Net) 96.8 97.8 72.6
- 23. Unit Forced Outage Rate 0.0 0.0 6.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, September 25, 1992, approximately 60 days.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 CCP1MERCIAL OPERAI'ICN 12/01/77 12/01/77 Form 2/34
_w
L e.
' DOCKET NO.
50-348 UNIT 1
DATE July 6, 1992 3 --
COMPLETED BY R D. Hill TELEPHONE (205)899-5156 MONTH June DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net)
(MVe-Net) 1 811 17 800 2
8
18 803 3
808 19 798 4
805 20 801 5
804
-21 799
'6-804' 22 808-7 781 23 806 8 --
802-24 802 9
804 25 800 10 -
800 26 802
.(;
11 803 27 803-12 805 28 804 13 805 29 802
.14 -
805 30 804
'15 805 31 16
-802
- INSTRUCTIONS On this format, list the average. daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole llegawatt, i-l
(..
Form 13/21-9
~ UNIT SHUTDOWNS AND POWER REDUCTIONE DOCKET No.
50-348
^
UNIT NAPTE J. M. FARLEY - UNIT 1 DATE July 6. 1992 i
COMPLETED Bf R. D. RILL REPORT MONTH JUNE TELEPHONE (205)S99-5156 j
l l
l l
lMETHODOF l LICENSEE l l
l CAUSE & CORRECTIVE l
l l
l l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l
- TION TO l
lNo.
lDATE l TYPE l(HOURS) l REASON 2lDOWNREACTOR l REPORT # l CODE l CODE l
PREVENT RECURRENCE'-
l I
3 4
S lThere were no unit shutdowns or major power reductions during the fronth of June.
l l
l l
l l
l l
1 l
l 1
l i
I I
I I
i 1
1 I
I I
I I
I i
i i
I I
I I
I I
i i
I I
I I
I I
I I
I I
I I
i l
i I
I I
I I
I I
I I
I i
l I
I i
l i
l I
I i
i i
i i
i l
i I
i l
I l
I I
l I
I I
I I
i i
I I
I I
I i
l i
i i
i i
l i
l i
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
I i
i i
i I
I I
i i
i I
i l
1 i
l I
i i
l I
i i
l l
I I
I I
I I
i i
i i
l i
I I
I I
I I
I I
i i
i I
i 1
1 I
I I
I I
I I
I I
I i
i l
I I
I I
i l
i i
I I
I i
i i
l i
l I
i l
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I l
I I
I I
I I
I I
I I
3 Method:
' Exhibit G-Instructions I: Forceri 22eason:
F S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination 5 Exhibit I -Same Source F-Acininist rat ive G-Operational Error (Explain)
(9/77)
H-Other (Explain)
_