.g..
Southem Nxleat Operatrg Company
- Post O*fce Bo< IP95
,Samngham, Atabama 35201 Telephone 205 BGS 5086 b
Southern Nudear Operating Company
- a. o. v ooo,,,
v,ev President try, tournem ew!nc system raty Protect July 13, 1992 Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTH: Doct: ment Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operatina Data Report Gentlemen:
Attached is the June 1992 Manthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted.
J. D.;Woodards &'
9
/M7 - [,'
7" AEJ:edb3014 Attachments I
cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell i
't 9207160149 920630 eg{
j PDR ADOCK 0500 4
i R
v
i bc: Mr. J. M. Farley Mr. R. P. Mcdonald Mr. W. G. Hairston, III Mr. R. D. Mill (G9.03 & A4.05)
Mr. D. L. Whitson Mr. A. E. Jones Mr. J. M. Elliott
-Mr. D. J. Shelton Mr. R. G. Cocieerell Mr. O. Batum Mr. C. L. Whatley Mr. D. W. Glass Mr. R. E. Huffman Mr. D. L. Fuller Ms. C. D. Collins Mr. John Hoffman Mr. Russ Dedrickson Mr. Fred Yost l
Mr. F. M. Jessup, III l
INP0 Records Center ANI library Commitment Tracking System (2 copies)
File'A2.1 l
I l
l l
s JOSEPH N. FARLEY NUCLP.AR PLANT UNIT 2 NARRATIVE
SUMMARY
OP OPERATIONS June 1992 Power re'uctioti continued into the month of June from 5-28-92 to repair and monitor 2A steam generator feedvater pump. The-unit returned to 100 percent power at 1745 on 6-6-92.
i At approximately 2025 oa 6-6-92, reactor power was reduced to 70 percent because the deviation among the over-temperature-delta-temperature setpoint channels was in excess of channel check criteria.
Deviation was elevated as a result of hot leg streaming following RTD bypass removal. Vestinghouse revised the criteria for expected channel variation on 6-8-92.
Existing deviation was detennined to be acceptable. The unit returned to 100 percent power at 0312 on 6-9-92.
The following major safety related maintenance was performed during the month:
1.-
Miscellaneous corrective and preventive maintenance was performed
+
on the diesel generators.
2.
Implemented a design change to install Unit 2 service water to control room HVAC.
t i
+
i
/
s-
OPERAT]NG DATA REPORT DOCKET No. 50-364 DATE July 6, 1992 COMPLETED BY R. D, Hill TELEPHONE Cf53T699-5156
~
. OPERATING STATUS I
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 1) Cumulative data since
- 2. Reporting Foriod:
June 1992 7-30-81, date of
- 3. Licensed hermal her (tMt):
2,652 comm relal operration,
- 4. Nameplate Rating (Gross Me):
860~
- 5. Design Electrical Rating (Net IEe): 829
- 6. Maximum Dependable capacity (Gross Nie):
854.3_
- 7. Maximum Dependable Capacity (Net lHe):
82~4.0
- 8. If Changes Occur in Capacity Batings (Items Number 3 Through 7) ~$10ce Last Report, Give Rensons:_N/A
- 9. Power Level To Which Restricted, If Any (Net iMe):
N/A
- 10. Reasons Foi Restrictions, If Any:
N/A Wis Month Yr-to-Date Cumulative 1
367.0 95 ?36.0 4,76I~2 8f,625 5
- 11. Hour 3 In Reporting PeriNI.
720.0 u
- 12. Number of Hours Reactor Was Critical 720.0 2,
~
13.'.Rea:to-Pesetve 3hutdown Hours 0.0 0.0 138.0
- 14. Hcurs Ger4eratot-On-Line 720.0 2,613.0 --~ ~fRfl53T' 5
~
- 15. Unit Reserve Shutdown Hcurs 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (!EH) 1,783,980.8 6,363,51f0 205 322,834.6 a
i l
17 Gross Electrical Energy Generated (MWH) 578,607.0 2,071,829.0 6/,167,913.0
- 18. Net Electrical Energy Generated (fEH)
~~5TU,7I W 1,942,161.0 63,876,223.0 19, Unit Service Factor 100.0 59.8 84.1
- 20. Unit Availability Factor-100.0 WB FCI
~
- 21. Unit Capacity Factor (Using MDC Net) 92.5 54.0 81.4
- 22. Unit Capacity Factor (Using DER Net) 91.9 53.6 80.5
- 23. Unit Forced Outage Rate 0.0 5.7 4.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: S/A
- 26. Units In Test Status (Prior to Commercial Ooeration):
Forecast Achieved i
05/06/81 05/08/81 INITIAL CRITICALITY INITIA*, ELECIRICITY 05/24/81
'05/25/81 COW.ERCIAL OPERATION 08/01/81 07/30/81 l
Form 2/30 l-l l
. ~. -
a.
DOCKET No. _ 50-364
~
UNIT 2
DaTE July 6,_1992 COMPLETED BY R. D. Hill TELEP110NE (205)899-5156 N0tml _. June D'AT AVERAGE DAILY POVER LEVEL DAY AVERAGE Us!LY POVER LEVEL
.c' (INe-Net)
(MWe-Net) 1
-438 -
17 815
- 2
_ 54S 18 819 3
554 19 815 4
579 20 817 5
576 21 819 22 830 3
771 7
723 23 827 8
681 24 823 9-808 25 821 l
10 817.
26 822 27 820 11 81,6 28 822 12 820 13 815 29 822 14 790 30 824 l
P 15~
817 31 l
16 818 l
INSTRUCTIONS-On this format, list the average daily unit power level in MVe-Net for each day in
[-
the reporting month.
Compute to the r.earest whole megavatt, g
l l
Form 13/21 l-
O p-'
b e,
f-
~
z.
12rIT SHUT!X:ErEt AND NCDL BEEGtTIass IOCEET CD.
'50-364 tPIT Kus J. Q. pnRIIT - tNIT 2 :
tate
. haly 6,1992 CDMFIETED BY R. D. NII?L TE:ZPHoNE (205)899-5156 REPORT PErfrB JtztE
[
l l
l
}
l rrmoo or i ucEssEE I I
I cmsE 6 coRREum l
l l
l 1 ounTr= l 2lsnurrrm iEvEnr i sisTEn 1 - 5 l
Acrrm m i
l y,,,,,,3 IREmRTe I mot
- icout i
rREverr REcunEncE I
2 l
luo.
irate lTrrE I (amns) l REAsm l009 l920601 l
P l 137.8 l
5 l
N/A l
N/A l SL l
N/A l Power reduction continued into the scnth of June l
l l
l l
l l
l l
j j fr:up 05-28-92 to repair ased monitor 2A steam l
l l
l l
l l
l l
l l9eneratorfeedwsterpump. The unit returned to l
l l
l l
l l
l l
l l10 3 power at 1745 on 6-4-92.
l I
l I
I I
i 1
i i
i i
jAt approximately 2025 on 6-6-92, powr me redmeed j l010 l920606 l
s l
54.8 l
B l
N/A l
N/A l SL l
N/A l
l l
l l
l j
l l
jfs 70 perevnt because the deviation among the j
l
(
l l
l l
l l
l l
l jov+r-tsaperature-delta-tegazaturesetpoint l
l l
l l
l l
l l
l l
lchamels was in exces of cb:2nel check criteria. l l
l l
l l
l l
l l
lDevietionwaselevatedasaresultofhotleg l
l l
l l
l l
l l
l streaming following RTD bypass removal.
l l
l l
l l
l l
l l
l Wstinghouse revised the criteria for expected
}
l l
t l
l l
l l
l l channel variation e-a e-4-92.
E isting deviation
?
l l
l l
l l
l l
l lwasccterminedtobeacceptable. The unit returne q l
l l
l j
l l
l l
lto 100 p rcent power at 0112 on 6-9-92.
l i
1 1
1 1
I I
I i
l i
I i
l i
I i
l i
i i
i I
I I
i I
I I
I i
i I
I l
1 i
i i
l i
I I
I I
I I
I I
I I
I I
i I
l I
i i
l I
I I
I I
i l
I I
i i
i i
i i
i i
l I
I I
i I
I I
I i
i 1
1 1
1 I
I I
i l
l i
I l
1 1
I i
i 1
1 I
i l
l l
1 1
I I
I i
i l
i Exhibit G-Instructions I
Method:
F: (orced Reason:
s: scheduled A-Equipment Failure (Explain) 1~ Manual for Prepstation of Data 2-+tanumi scram.
Entry sh-ets for Licensee B-Maintenance or Test 3-Automatic scram.
Event Report (IZaj Tile (5UREG-C-Refueling 4-Other (Explain) 0161)
D-Regulatory Restriction E Q rator Training & License Examination Exhibit 2 -Same Source F-ktninistrative G-operational Error (Explaini
.(9/77) 8 4 her (Explain)
E
_