.3.7[(cont'd) 4.7 '(cont'd) 6 9.
Primary Containment Atmo:phara-Primary containment atmosphere shall be
- 9.. continuously monitored for hydrogen and
. Monitoring Instruments oxygen when containment integrity is Instrumentation shall be functionally required. The exception to this11s when a.
the Post-Accident Sampling System is to' tested and calibrated as specified in be operated.
In this instance, the Table 4.7-1.
containment atmosphere monitoring systems may be isolated for a period not to exceed 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> in a 24-hour period..The monitoring system shall be considered operable if at least one monitor is operable.
a) From and af ter the time the primary containment atmosphere monitoring e
instruments are found or made to be inoperable for.any reason, continued reactor operation is permissible'for the succeeding thirty (30) days unless one instrument monitoring each_ parameter is sooner made operable, provided an appropriate grab sample is obtained and analyzed at least 4
once each twenty-four (24) hour period.
B.
Standby Gas Treatment System 6:
'J? specification 3. 7. A.9.a cannot be met, 1.
Standby Gas Treatment System thi.' reactor shall be placed in the cold surveillance shall be performed as ut4Ltion within twenty-four (24) hours.
indicated below:
At least once per operating cycle, it B.
Standby Gas Treatment System a.
shall be demonstrated that:
1.
Except as specified in 3.7.B.2 below (1) Pressure drop across the combined both circuits of the Standby Gas Treatment high-efficiency and charcoal filters
~
I System shall be operable at all times when is less than 5.7 in. of water at secondary containment integrity is required.
6,000 scfm and (2) Each 39kW heater shall dissipate greater than 29kW of electric power as calculated by the following.
expression:
P=1[3' EI where 2
2 P= Dissipated Electrical Power; 0
333 E= Measured line-to-line voltage p
Pts in volts (RMS); I= Average measured phase current in amperes (RMS).
Amendment No. M )(, M f [, p9,