ML20101R428

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips. Central Files Version of Revised EPIPs Withheld
ML20101R428
Person / Time
Site: Point Beach  
Issue date: 03/28/1996
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20013A430 List:
References
PBL-96-0081, PBL-96-81, NUDOCS 9604160275
Download: ML20101R428 (1)


Text

y q

Wisconsin 1 Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd., Two Rivers. WI 54241 (414) 755-2321 PBL 96-0081 March 28, 1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please riote that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.

Sincerely, G. J.

t xfield Manager clb Enclosure cc:

NRC Resident Inspector (w/o/e)

Incident Response Center, Region III (Ch

\\

150!!3 LW. bd 9604160275 960328

,/p hDR ADOCK0500g6 g/' ; j%

/

/Ft g

/

Ik?

l ff Abd l

.4 subsMity ofliluvaar Enew GupcvMkvi

_ _ _ _ _ _ _ _ _ _.