Forwards Reactor Containment Bldg Integrated Leak Rate Test,Lasalle County Nuclear Power Station,Unit 2
ML20101R018
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/02/1992
From: Diederich G
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101R020 List:
References
NUDOCS 9207150198
Download: ML20101R018 (1)


Text

.

O Comm:nwedthEdbin LaSalle County Nuclear Statior.

2601 N. 21st. Rd.

Marseilles, Illinois 61341 Telephone 815/357-6761 July 2, 1992 l

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Atta Document Control Desk

(

SUBJECT:

Reactor Containment Building Integrated Leak Rate Test LaSalle County Nuclear Power Station Docket No.

50-374, NPF-18, Unit 2 Enclosed please find the report " Reactor Containment Bui!.'ing Integrated Leak Rate Test, LaSalle County Nuclear Power Station, Unit 2, March 27, 1992 and p

related appendices describing the Type A test.

I-('

This report is submitted to you in accordance with the requirements of 10CFR50, Appendix J, Section V.B.1.

The information contained in Appendix A l

of this report is intended to comply with requirements of 10CFR50, Appendix J, Section V.B.3.

According to 10CFR50, Appendix J, Section III.D., the next Type A test is presently scheduled to be performed at the next refueling outage (Fall 1993).

Additional Correspondence with regards to the schedule of Type A testing will be provided under separate cover.

Very truly yours,

/

G. J. DiedeYich Station Manager LaSalle County Station GJD/JPP/DML/cas

Attach, cc w/ attachment:

A. B. Davis (U.S. NRC Region III)

F. Maura (U.S. NRC Region III)

D. Hills (LaSalle Senior NRC Inspector)

J. M. Shields J. Glover Central File / Integrated Leak Test w/o attachment:

B. Siegel (NRC NRR Project Manager)

D. Galle T. Hammerich 9207150198 920702 PDR ADOCK 05000374 P

PDR i

\\

l ZCAPTS/388 I

__