O Comm:nwedthEdbin LaSalle County Nuclear Statior.
2601 N. 21st. Rd.
Marseilles, Illinois 61341 Telephone 815/357-6761 July 2, 1992 l
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Atta Document Control Desk
(
SUBJECT:
Reactor Containment Building Integrated Leak Rate Test LaSalle County Nuclear Power Station Docket No.
50-374, NPF-18, Unit 2 Enclosed please find the report " Reactor Containment Bui!.'ing Integrated Leak Rate Test, LaSalle County Nuclear Power Station, Unit 2, March 27, 1992 and p
related appendices describing the Type A test.
I-('
This report is submitted to you in accordance with the requirements of 10CFR50, Appendix J, Section V.B.1.
The information contained in Appendix A l
of this report is intended to comply with requirements of 10CFR50, Appendix J, Section V.B.3.
According to 10CFR50, Appendix J, Section III.D., the next Type A test is presently scheduled to be performed at the next refueling outage (Fall 1993).
Additional Correspondence with regards to the schedule of Type A testing will be provided under separate cover.
Very truly yours,
/
G. J. DiedeYich Station Manager LaSalle County Station GJD/JPP/DML/cas
- Attach, cc w/ attachment:
A. B. Davis (U.S. NRC Region III)
F. Maura (U.S. NRC Region III)
D. Hills (LaSalle Senior NRC Inspector)
J. M. Shields J. Glover Central File / Integrated Leak Test w/o attachment:
B. Siegel (NRC NRR Project Manager)
D. Galle T. Hammerich 9207150198 920702 PDR ADOCK 05000374 P
PDR i
\\
l ZCAPTS/388 I