ML20101Q575
| ML20101Q575 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/30/1992 |
| From: | Burski R, Centolanzi P ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-92-0181, W3F1-92-181, NUDOCS 9207150014 | |
| Download: ML20101Q575 (7) | |
Text
_ _ _ _ _ _ ___
9,. g ENTERGY ETs'""" "' '"*'
~"
na nu Te-504 732 67 /4 R. F. Durski ne s <
..xx s ~ +
5,1 Vl f W3F1-92-0181 A4.05 QA July.10, 1992 U.S. Nucleas Regtnatory Commission AT'l N : Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38
- Montbly Operating Report
- Gentlemen:
Attached is the subject monthly report which covers the operati ; statistics for the month of June,1992. This report is submitted per Sectior. 3.1.6 of the o
? Waterford 3 Technical Specifications for Facility Operating Licanse No. NPF-38.
Very truly yours, G
a4 RFB /CJT/asr
? Attachment
- cc:
-R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds.
F. Yost (Utility Data-lustitute, Inc.)
J.
'J.T. Wheelock (INPO Records Center)
' NRC Resident inspectors Office If 9207150024-92cfso' L
_hDR ADOCK105000382-PDR-1
= - - - ___
335 1
- .,=
e-1
u NRC MCNTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS s-
'4ATERFORD 3 JUNL' 1992 7
The unit operated ~ at an average power of 99.8% and experienced no forced outages
.orfs gnitleant power reductions.during the period.
i
\\
+
e
+
L
_l e
'$( + 1 a
H a
r'f__,
a 4 t i
4 l-. '!h f'
iif)f't i
as.
v IA f ', g i;.
i V
( E,7"9 -; l y-3 1
3 l
J I
Y i
4 PRESSURIZER SAFETY VALVE e
s 4
FAILURES AND CHALLENGES l3.,.
WATERFORD 3
- e-fDuring the mont*: of June 1992,-there were no pressurizer safety valve failures-
-or;cha11engen.
- s..
,\\ :'
1 1y M '
s
,.}.'_
4 4
.g:
c s
V I
k T
I
'\\
I
%i-.
[ ';;y- * {' t ?.i rP' b
t.
L
'h;_
% :t -
i s 0
ha4i
).h 1
4 s
u
'",['Q'y i' 4 3
.h.*
'..gt
^ U
.. l.
$2Tn m
{~
OPERATING DATA REPORT DOCKET NAME: 50-382 UhIT NAME: WATERFORD 3 DATE OF REPORT: JULY, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING STATUS Reporting Period: June, 1992 1..
Gross Hours in Reporting Period: 720 2.-
Currently Authorized Power Level (MWt): 3390
. Maximum Dependable capacity (Net MWe): 1075 Design Electrical Rating (Not MWe): 1104 3.: -Power Level to which Restricted (if any) (Net MWe): N/A
_4.
-_Reasuns for Restriction (if any):
N/A THIS MONTH YR TO DATE CUMULATIVE
- 5.
ENumber-of Hours Reactor.
was Critical-720.0 4,108.5 49,194.9 6.
. Reactor Reserve Shutdown Houre- - 7.
' Hours Generator was
.On-line-720.0 4,068.2 48,449.0 8.
Unit Reserve
. Shutdown Hours
- -'9.
Gross: Thermal Energy
.2,436,179
- 13,735,521_
159,284,996 Generated (MWH) 110.
Gross Electrical-Energy Generated'.(MWH) 797,020 4,571,540 53,442,960 11;- Net Electrical Energy-Generated,(hMH)-
7G0,591 4,369,063 50,918,523
- 12. ; Reactor Service, Factor 100.0 94.1
,82'9
- 13.
Reactor Availability Factor 100.0 94.1
_82.9
?
14;. Unit-Service Factor.
100.0 93.2 81.7
- (
15.-
Unit Availability. Factor 100.0' 93.2 81.7
^16.
-Unit Capacity Factor.
(using MDC)L 98.3 93.1 79.8 i~
117.--. Unit l Capacity. Factor L(Using DER)-
95.7 90.6 77.7 18.2 -Unit. Forced Outage Rate 0.0 2.3 4.1 h!
s,;
.w
y-L'
% ;. m 4
f k
OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME. WATERFORD 3 4
DATE OF REPORT: JULY, 1992 COMPLETED BY P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't) 19.
Shutdow.is Scheduled over next 6 Months (type,.date and duration ouf each):
Refueling, 9/19/92, 56 days
' 20. 'If Shutdown at'end of report period, estimated date of startup: N/A 21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. ' Hours in Reporting. Period 720.0 4,367.0 59,328.0
- 2 3.. Unit Forced Outage s.Jurs 0.0 95.6 2,000.4 24
' Nameplate' Rating:(Gross hWo): 1200 25.
If Changes. Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give. Reasons
_N/A.
5 1
.a t
s 3
3
^
at-_
I c.
.,3i
-(.+g:
g'*
s AVERAGE DAILY Ut:IT POWER LEVEL M-DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JULY, 1992 COMPa2TED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 MONTH
-JUNE-
' DAY AVERAGE DAILY' POWER LEVEL DAY AVERAGE DAILY PohR LEVEL (MWe-Net)
(MWe-Net)
-1 1055 17 1046
-2 1051 18 1052 3-1052 19 1050
-41 1053 20 1041 5
1050 21 1058 6
'1051 22 1073 7;
1052 23 1073
'8 10 5.R 24 1073 9,
1043 25 10/1
-vi i10-
'1048 26 1069 111 1050 27 1070 L121 10451 28-1070 J13' 1046-l29 1069
-14
-1049 30 1071
- 15
- 1053-31-N/A'
- 16'
-1052 cINSTRUCTIONS
. On' this t format,111st the average daily unit power -level-in: MWe-Nat-for each -day
~
in tha reporting month.. Compute to the nearest Chole ~ megawatt.
n r
a::
wn s.) ; 3
4-
.g.
w-c-
.s----,-
m
=
~-
~
~
y_
+3 g
.,; 1
...?:
-~ UNIT..' SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:-'50-382'-
UNIT NUMBER: WATERFORD 3 DATE OF REPORT: JULY,-1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6083 REPORT FOR ' JUNE e
Type Method of Shutting F = Forced Duration Down the Reactor or cause, Comments and Number Date
-S = Scheduled (Hours)
Reason (1)
Reducing Power (2)
Corrective Actions N/A (1) REASON (2) METHOD A = Equipnent Failure (explain) 1 = Manual i
B = Mainternance. or Test 2 = Manual Scram C =-Refueling.:
3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E'= Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)
F = Administrative-G = Operational Errar (explain)
H.=-Other (explain].'
_ - - __ _. _ _ _. _, _