_ _ _ _ _ _ ___

9,. g ENTERGY ETs'""" "' '"*'

~"

na nu Te-504 732 67 /4 R. F. Durski ne s <

..xx s ~ +

5,1 Vl f W3F1-92-0181 A4.05 QA July.10, 1992 U.S. Nucleas Regtnatory Commission AT'l N : Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38

- Montbly Operating Report

- Gentlemen:

Attached is the subject monthly report which covers the operati ; statistics for the month of June,1992. This report is submitted per Sectior. 3.1.6 of the o

? Waterford 3 Technical Specifications for Facility Operating Licanse No. NPF-38.

Very truly yours, G

a4 RFB /CJT/asr

? Attachment

cc:

-R.D. Martin, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds.

F. Yost (Utility Data-lustitute, Inc.)

J.

'J.T. Wheelock (INPO Records Center)

' NRC Resident inspectors Office If 9207150024-92cfso' L

_hDR ADOCK105000382-PDR-1

= - - - ___

335 1

.,=

e-1

u NRC MCNTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS s-

'4ATERFORD 3 JUNL' 1992 7

The unit operated ~ at an average power of 99.8% and experienced no forced outages

.orfs gnitleant power reductions.during the period.

i

\\

+

e

+

L

_l e

'$( + 1 a

H a

r'f__,

a 4 t i

4 l-. '!h f'

iif)f't i

as.

v IA f ', g i;.

i V

( E,7"9 -; l y-3 1

3 l

J I

Y i

4 PRESSURIZER SAFETY VALVE e

s 4

FAILURES AND CHALLENGES l3.,.

WATERFORD 3

- e-fDuring the mont*: of June 1992,-there were no pressurizer safety valve failures-

-or;cha11engen.

s..

,\\ :'

1 1y M '

s

,.}.'_

4 4

.g:

c s

V I

k T

I

'\\

I

%i-.

[ ';;y- * {' t ?.i rP' b

t.

L

'h;_

% :t -

i s 0

ha4i

).h 1

4 s

u

'",['Q'y i' 4 3

.h.*

'..gt

^ U

.. l.

$2Tn m

{~

OPERATING DATA REPORT DOCKET NAME: 50-382 UhIT NAME: WATERFORD 3 DATE OF REPORT: JULY, 1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING STATUS Reporting Period: June, 1992 1..

Gross Hours in Reporting Period: 720 2.-

Currently Authorized Power Level (MWt): 3390

. Maximum Dependable capacity (Net MWe): 1075 Design Electrical Rating (Not MWe): 1104 3.: -Power Level to which Restricted (if any) (Net MWe): N/A

_4.

-_Reasuns for Restriction (if any):

N/A THIS MONTH YR TO DATE CUMULATIVE

- 5.

ENumber-of Hours Reactor.

was Critical-720.0 4,108.5 49,194.9 6.

. Reactor Reserve Shutdown Houre- - 7.

' Hours Generator was

.On-line-720.0 4,068.2 48,449.0 8.

Unit Reserve

. Shutdown Hours

- -'9.

Gross: Thermal Energy

.2,436,179

- 13,735,521_

159,284,996 Generated (MWH) 110.

Gross Electrical-Energy Generated'.(MWH) 797,020 4,571,540 53,442,960 11;- Net Electrical Energy-Generated,(hMH)-

7G0,591 4,369,063 50,918,523

12. ; Reactor Service, Factor 100.0 94.1

,82'9

13.

Reactor Availability Factor 100.0 94.1

_82.9

?

14;. Unit-Service Factor.

100.0 93.2 81.7

(

15.-

Unit Availability. Factor 100.0' 93.2 81.7

^16.

-Unit Capacity Factor.

(using MDC)L 98.3 93.1 79.8 i~

117.--. Unit l Capacity. Factor L(Using DER)-

95.7 90.6 77.7 18.2 -Unit. Forced Outage Rate 0.0 2.3 4.1 h!

s,;

.w

y-L'

% ;. m 4

f k

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME. WATERFORD 3 4

DATE OF REPORT: JULY, 1992 COMPLETED BY P. M. CENTOLANZI TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't) 19.

Shutdow.is Scheduled over next 6 Months (type,.date and duration ouf each):

Refueling, 9/19/92, 56 days

' 20. 'If Shutdown at'end of report period, estimated date of startup: N/A 21.

Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE

22. ' Hours in Reporting. Period 720.0 4,367.0 59,328.0

- 2 3.. Unit Forced Outage s.Jurs 0.0 95.6 2,000.4 24

' Nameplate' Rating:(Gross hWo): 1200 25.

If Changes. Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give. Reasons

_N/A.

5 1

.a t

s 3

3

^

at-_

I c.

.,3i

-(.+g:

g'*

s AVERAGE DAILY Ut:IT POWER LEVEL M-DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JULY, 1992 COMPa2TED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6683 MONTH

-JUNE-

' DAY AVERAGE DAILY' POWER LEVEL DAY AVERAGE DAILY PohR LEVEL (MWe-Net)

(MWe-Net)

-1 1055 17 1046

-2 1051 18 1052 3-1052 19 1050

-41 1053 20 1041 5

1050 21 1058 6

'1051 22 1073 7;

1052 23 1073

'8 10 5.R 24 1073 9,

1043 25 10/1

-vi i10-

'1048 26 1069 111 1050 27 1070 L121 10451 28-1070 J13' 1046-l29 1069

-14

-1049 30 1071

15
1053-31-N/A'
16'

-1052 cINSTRUCTIONS

. On' this t format,111st the average daily unit power -level-in: MWe-Nat-for each -day

~

in tha reporting month.. Compute to the nearest Chole ~ megawatt.

n r

a::

wn s.) ; 3

4-

.g.

w-c-

.s----,-

m

=

~-

~

~

y_

+3 g

.,; 1

...?:

-~ UNIT..' SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER:-'50-382'-

UNIT NUMBER: WATERFORD 3 DATE OF REPORT: JULY,-1992 COMPLETED BY: P. M. CENTOLANZI TELEPHONE: 504-739-6083 REPORT FOR ' JUNE e

Type Method of Shutting F = Forced Duration Down the Reactor or cause, Comments and Number Date

-S = Scheduled (Hours)

Reason (1)

Reducing Power (2)

Corrective Actions N/A (1) REASON (2) METHOD A = Equipnent Failure (explain) 1 = Manual i

B = Mainternance. or Test 2 = Manual Scram C =-Refueling.:

3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E'= Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)

F = Administrative-G = Operational Errar (explain)

H.=-Other (explain].'

_ - - __ _. _ _ _. _, _