an at:

[

o UNITED STATES 8

~,,

NUCLEAR REGULATORY COMMISSION n

5 E

WASHINGTON, D. C. 20555 4,

ALABAMA POWER COMPANY DOCKET N0. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 56 License No. NPF-2 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated Novmeber 2,1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

$$0 0

P

2-(2) Technical Specifications The. Technical Specifications contained in Appendices A and B, as revised through Amendment No. 56, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amend.nent is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION i

eve a fga, C Operating Reactors ch #1 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

December 26, 1984

/

4 4

ATTACHMENT TO LICENSE AMENDMENT NO. 56 AMENDMENT NO. 56 FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50-348 Revised Appendix A as follows:

Remove Page Insert Page 6-la 6-la i

i

ADMINISTRATIVE CONTROLS f.

Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perfom safety-related functions; e.g., senior reactor operators, reactor operators, health physics technicians, auxiliary operators, and key maintenance personnel.

Adequate shif t coverage shall be maintained without routine heavy use of overtime. The objective shall be to have operating personnel work a nominal 40-hour week while the plant is operating.

l In the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed:

1.

An individual will not be permitted to work more than 16 hcurs straight (not including shift turnover time).

2.

There will be a break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (which can include shift turnover time) between work periods.

3.

An individual will not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period (all excluding shift turnover time).

4.

Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

5.

Any deviation from the above guidelines for the minimum shift complement defined in Technical Specification Table 6.2-1 and health physics technicians shall be reviewed and approved by the Plant Manager,'his designee (Emergency Director) or higher authority. Any deviation from the above guidelines for key maintenance personnel shall be reviewed and approved by the maintenance superintendent or his designee (group supervisor).

l i

l FARLEY-UNIT 1 6-la AMENDMENT NO. 56 I

l I

!(

o,%

UNITED STATES NUCLEAR REGULATORY COMMISSION r,

WASHINGTON, D. C. 20555

)

%...+ /

ALABAMA POWER COMPANY 00CKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 47 License No. NPF-8 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated November 2, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission; C.

There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety.of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this license amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-8 is hereby amended to read as follows:

2-

.(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 4/, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION even A. Varga, Chief Operating Reactors Brapch #1 Division of Licensing"

Attachment:

Changes to the Technical Specifications Date of Issuance: December 26, 1984

,/

O 4

ATTACHMENT TO LICENSE AMENDMENT NO. 47 AMENDMENT NO. 47 FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 Revised Appendix A as follows:

Remove Page Insert Page 6-la 6-la Y

e

ADMINISTRATIVE CONTROLS f.

Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions; e.g., senior reactor operators, reactor operators, health physics technicians, auxiliary operators, and key maintenance personnel.

Adequate shift coverage shall be maintained without routine heavy use of overtime. The objective shall be to have operating personnel work a nominal 40-hour week while the plant is operating.

l l

In the event that unforeseen problems require substantial amounts of i

overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed:

t 1.

An individual will not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (not including shift turnover time).

2.

There will be a break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (which can include shift turnover time) between work periods.

3.

An individual will not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period (all excluding shift turnover time).

4.

Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

5.

Any deviation from the above guMelines for the minimum shift complement defined in Technict.1 Specification Table 6.2-1 and health physics technicians shall be reviewed and approved by the Plant Manager, his designee (Emeigency Director) or higher authority. Any deviation from the above guidelines for key maintenance personnel shall be reviewed and approved by the maintenance superintendent or his designee (group supervisor).

FARLEY-UNIT 2 6-la AMEN 0 MENT NO. 47

_