|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20206R0531999-05-13013 May 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Plant Organization Structure Requirement ML20205S3291999-04-20020 April 1999 Application for Amends to Licenses DPR-42 & DPR-60,changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0261999-04-12012 April 1999 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR ML20204H3491999-03-19019 March 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection ML20207F2771999-03-0101 March 1999 Revised Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A1051999-02-0505 February 1999 Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Changes to ABB-CE Sleeve Design Assumptions & Installation Techniques ML20196B9571998-11-25025 November 1998 Application for Amends to Licenses DPR-42 & DPR-60,allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155D9581998-10-30030 October 1998 Application for Amends to Licenses DPR-42 & DPR-60,to Revise License Condition 7 to Include Extended Implementation Date of 990901 ML20154S2061998-10-23023 October 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20154F7731998-10-0101 October 1998 Suppl 16 to License Amend Request to Licenses DPR-42 & DPR-60,replacing Paragraph for USAR Page 10.4-7 & Page 10.4-7 Annotated Showing Which Paragraph Replaced ML20151Z8891998-09-15015 September 1998 Suppl 15 to 970129 Application for Amend to Licenses DPR-42 & DPR-60,revising Cooling Water Sys Emergency Intake Design Bases ML20151U3471998-09-0404 September 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5001998-08-12012 August 1998 Suppl 8 to 951214 LAR for Licenses DPR-42 & DPR-60,providing Addl Info to Support Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T9801998-07-24024 July 1998 Supplemental Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info in Support of 980129 Amend Request Re Cooling Water Sys Emergency Intake Design Bases ML20249A7601998-06-11011 June 1998 Suppl 7 to 951214 LAR for Amends to Licenses DPR-42 & DPR-60,showing Tech Specs Pages Annotated to Incorporate Changes Proposed in Suppl ML20248M1911998-05-29029 May 1998 Supplemental Application for Amend to License DPR-42, Providing Updated Flux Mapping Results for Cycle 19 ML20216G0331998-04-13013 April 1998 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing LAR ML20216D0221998-03-0606 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,updating Heatup & Cooldown Rate Curves,Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217N9941998-03-0404 March 1998 Supplemental LAR to Licenses DPR-42 & DPR-60,providing Status of Relocated Tech Specs Requirements ML20217N9671998-03-0202 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P9811998-03-0202 March 1998 Suppl to LAR to Licenses DPR-42 & DPR-60,supporting License Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20203J9531998-02-27027 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,modifying AMSAC W/Addition of Diverse Scram Feature as Described in Exhibit A.Nrc Approval Is Requested by 980907 ML20202E5571998-02-10010 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8241998-01-15015 January 1998 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Proposes one-time Only Changes Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1 Cycle 19 ML20198P0741998-01-0808 January 1998 Suppl 5 to 951214 LAR to Licenses DPR-42 & DPR-60 Re Proposed Changes to TS Section 6 ML20198B1401997-12-29029 December 1997 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Provide Changes to TS Pages Associated w/951214 LAR ML20212F9711997-10-28028 October 1997 Supplemental Application for Amend to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20217F4711997-10-0303 October 1997 Suppl Application for Amend to Licenses DPR-42 & DPR-60, Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7431997-10-0101 October 1997 Suppl Application for Amends to Licenses DPR-42 & DPR-60, Allowing Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5801997-09-26026 September 1997 Application for Amends to Licenses DPR-42 & DPR-60.Amend Proposes Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves ML20216E4461997-09-0404 September 1997 Application for Amends to Licenses DPR-42 & DPR-90,providing Supplemental Info Which Supports Conformance of TS Overtime to NRC Guidance Issued 950409 ML20217M5961997-08-15015 August 1997 Suppl to LAR Dtd 961127,incorporating C-E SG Welded Tube Sleeve Topical Rept CEN-629-P,Rev 1.Proprietary & non-proprietary TRs CEN-629-P,encl.Proprietary Rept Withheld Per 10CFR2.790.Affidavit,encl ML20148Q9491997-06-30030 June 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases ML20141F4851997-05-15015 May 1997 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Proposes Changes to Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0751997-05-0707 May 1997 Application for Amends to Licenses DPR-42 & DPR-60,amending Spent Fuel Pool Special Ventilation Sys ML20138G4161997-04-29029 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing 970129 Application Re Rev to Cooling Water Sys Emergency Intake Design Bases ML20137T2031997-04-10010 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137D9041997-03-20020 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases ML20136H0041997-03-11011 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases ML20136F5131997-03-10010 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising CWS Emergency Intake Design Bases ML20135F7441997-03-0707 March 1997 Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20135A9371997-02-21021 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134J6211997-02-0606 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising Restrictions on Safety Injection Sys Operations When Reactor Coolant Sys Is at Low Temperatures ML20134E9341997-01-29029 January 1997 Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 ML20135A8191996-11-27027 November 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 4.12, SG Tube Surveillance & TS Section B-4-12 ML20134H3641996-11-0606 November 1996 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Rev to Appendix a Re Cooling Water Sys ML20134E4451996-10-25025 October 1996 Application for Amends to Licenses DPR-42 & DPR-60,changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2451996-09-24024 September 1996 Application for Amends to Licenses DPR-42 & DPR-60, Respectively,Changing TS 4.12, SG Tube Surveillance, to Incorporate Revised Acceptance Criteria for SG Tubes W/ Degradation in Tubesheet Region ML20117P4291996-09-11011 September 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising Plant TS Governing Cw Sys ML20117B2341996-08-15015 August 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses 1999-05-13
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211K6101999-08-31031 August 1999 Application for Amend to License SNM-2506,proposing Change to License Conditions 6,7 & 8 & TSs to App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0531999-05-13013 May 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Plant Organization Structure Requirement ML20205S3291999-04-20020 April 1999 Application for Amends to Licenses DPR-42 & DPR-60,changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0261999-04-12012 April 1999 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR ML20204H3491999-03-19019 March 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection ML20207F2771999-03-0101 March 1999 Revised Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A1051999-02-0505 February 1999 Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Changes to ABB-CE Sleeve Design Assumptions & Installation Techniques ML20196B9571998-11-25025 November 1998 Application for Amends to Licenses DPR-42 & DPR-60,allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155D9581998-10-30030 October 1998 Application for Amends to Licenses DPR-42 & DPR-60,to Revise License Condition 7 to Include Extended Implementation Date of 990901 ML20154S2061998-10-23023 October 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20154F7731998-10-0101 October 1998 Suppl 16 to License Amend Request to Licenses DPR-42 & DPR-60,replacing Paragraph for USAR Page 10.4-7 & Page 10.4-7 Annotated Showing Which Paragraph Replaced ML20151Z8891998-09-15015 September 1998 Suppl 15 to 970129 Application for Amend to Licenses DPR-42 & DPR-60,revising Cooling Water Sys Emergency Intake Design Bases ML20151U3471998-09-0404 September 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5001998-08-12012 August 1998 Suppl 8 to 951214 LAR for Licenses DPR-42 & DPR-60,providing Addl Info to Support Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T9801998-07-24024 July 1998 Supplemental Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info in Support of 980129 Amend Request Re Cooling Water Sys Emergency Intake Design Bases ML20249A7601998-06-11011 June 1998 Suppl 7 to 951214 LAR for Amends to Licenses DPR-42 & DPR-60,showing Tech Specs Pages Annotated to Incorporate Changes Proposed in Suppl ML20248M1911998-05-29029 May 1998 Supplemental Application for Amend to License DPR-42, Providing Updated Flux Mapping Results for Cycle 19 ML20216G0331998-04-13013 April 1998 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing LAR ML20216D0221998-03-0606 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,updating Heatup & Cooldown Rate Curves,Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217N9941998-03-0404 March 1998 Supplemental LAR to Licenses DPR-42 & DPR-60,providing Status of Relocated Tech Specs Requirements ML20217P9811998-03-0202 March 1998 Suppl to LAR to Licenses DPR-42 & DPR-60,supporting License Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20217N9671998-03-0202 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20203J9531998-02-27027 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,modifying AMSAC W/Addition of Diverse Scram Feature as Described in Exhibit A.Nrc Approval Is Requested by 980907 ML20202E5571998-02-10010 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8241998-01-15015 January 1998 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Proposes one-time Only Changes Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1 Cycle 19 ML20198P0741998-01-0808 January 1998 Suppl 5 to 951214 LAR to Licenses DPR-42 & DPR-60 Re Proposed Changes to TS Section 6 ML20198B1401997-12-29029 December 1997 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Provide Changes to TS Pages Associated w/951214 LAR ML20212F9711997-10-28028 October 1997 Supplemental Application for Amend to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20217F4711997-10-0303 October 1997 Suppl Application for Amend to Licenses DPR-42 & DPR-60, Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7431997-10-0101 October 1997 Suppl Application for Amends to Licenses DPR-42 & DPR-60, Allowing Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5801997-09-26026 September 1997 Application for Amends to Licenses DPR-42 & DPR-60.Amend Proposes Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves ML20216E4461997-09-0404 September 1997 Application for Amends to Licenses DPR-42 & DPR-90,providing Supplemental Info Which Supports Conformance of TS Overtime to NRC Guidance Issued 950409 ML20217M5961997-08-15015 August 1997 Suppl to LAR Dtd 961127,incorporating C-E SG Welded Tube Sleeve Topical Rept CEN-629-P,Rev 1.Proprietary & non-proprietary TRs CEN-629-P,encl.Proprietary Rept Withheld Per 10CFR2.790.Affidavit,encl ML20148Q9491997-06-30030 June 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases ML20141F4851997-05-15015 May 1997 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Proposes Changes to Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0751997-05-0707 May 1997 Application for Amends to Licenses DPR-42 & DPR-60,amending Spent Fuel Pool Special Ventilation Sys ML20138G4161997-04-29029 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing 970129 Application Re Rev to Cooling Water Sys Emergency Intake Design Bases ML20137T2031997-04-10010 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137D9041997-03-20020 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases ML20136H0041997-03-11011 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases ML20136F5131997-03-10010 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising CWS Emergency Intake Design Bases ML20135F7441997-03-0707 March 1997 Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20135A9371997-02-21021 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134J6211997-02-0606 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising Restrictions on Safety Injection Sys Operations When Reactor Coolant Sys Is at Low Temperatures ML20134E9341997-01-29029 January 1997 Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 ML20135A8191996-11-27027 November 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 4.12, SG Tube Surveillance & TS Section B-4-12 ML20134H3641996-11-0606 November 1996 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Rev to Appendix a Re Cooling Water Sys ML20134E4451996-10-25025 October 1996 Application for Amends to Licenses DPR-42 & DPR-60,changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2451996-09-24024 September 1996 Application for Amends to Licenses DPR-42 & DPR-60, Respectively,Changing TS 4.12, SG Tube Surveillance, to Incorporate Revised Acceptance Criteria for SG Tubes W/ Degradation in Tubesheet Region ML20117P4291996-09-11011 September 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising Plant TS Governing Cw Sys 1999-08-31
[Table view] |
Text
- _ _ _ _ _ _ _ _ _ - _ _.
~
UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY FRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NO. 50 282 50-306 i
REQUEST FOR AMENDMENT TO OPERATING LICENSES DPR-42 6 DPR 60 LICENSE AMENDMENT REQUEST DATED June 15, 1992 Northern States Power Company, a Minnesota corporation, requests authorization for changes to Appendix A of the Prairie Island Operating License as shown on the attachments labeled Exhibits A, B, and C. Exhibit A describes the proposed changes, reasons for the changes, and a significant hazards eval-untion. Exh! bits B and C are copies of the Prairie Island Technical Specifications incorporating the proposed chr.nges.
This letter contains no restricted or other defense information.
NORTHERN ST. S WE COMPANY By /Ao-
/fh'omas'M Parker Manager Nuclear Support Services ,
on this /$Nday o e /G@lbeferameanotarypublicinandfor said County, person %y appeared Thomas M Parker, Manager Nuclear Support Services, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belief tt.; statements made in it are true and that it is not interposed for dalay.
AMvW y p- ,a -
9207100293 920615 PDR ADOCK 05000282 p PDR
9 .
Exhibit A Prairie Island Nuclear Generating Plant License Amendment Request Dated June 15, 1992 Evaluation of Proposed Changes to the Technical Specifications Appendix A of Operating License DPR 42 and DPR 60 Pursuant to 10 CFR Part 50, Sections 50.59 and 50.90, the holders of Operating Licenses DPR-42 and DPR 60 hereby propose the following changes to Appendix A, Technical Specifications:
Backreound Generic Letter 87 09, " Sections 3.0 and 4.0 of the Standard Technical Specifications (STS) on the Applicability of Limiting Conditions for Operation and Surveillance Requirements", provided guidance on improvements to Section 4.0 of the Standard Technical Specifications which could be voluntarily adopted by licensees. -One of the improvements described in Generic Letter 87-09 revised Standard Technical Specification 4.0.3 to clarify when a missed surveillance constitutes a violation of the operability requirements of a Limiting Condition for Operation and to clarify the applicability of the action requirements and the time during-which the limits apply.
This license amendment request proposes the incorporation of Standard Technical Specification Section 4.0.3, as modified by Generic Letter 87 09, into the Prairie Island Technical Specifications.
Prorosed Chanres and Reasons for Chance The proposed changes to the-Prairie Island Technical Specifications being implemented in response to Generic Letter 87-09 are described below, and the specific wording changes to Technical Specifications are shown in Exhibits B and C.
A. Proposed chances to Technical Specification Table of Contents The page number for "4.0 SURVEILLANCE REQUIREMENTS" is being changed from "4.1-1" to "4.0-1" to reflect the new Section 4.0 described below.
B. Proposed chances to Technical Specification Section 4.0 Section 4.0 has been relocated and reformatted to be consistent with Section 3.0, which was incorporated into the Prairie Island Technical Specifications by License Amendment Nos. 91 and 84 The requirements of the current Section 4.0 have been relocated to Specification 4.0.A and have been expanded to include a statement similar to Standard Technical Specification 4.0.2 which states that surveillance requirements shall be performed within the specified time intervals. The current Section 4.0 requirements have been incorporated, with only editorial changes, into the new Specification 4.0.A as exceptions to the requirement that ,
surveillances shall be performed within the specified time interval. The L proposed Specification 4.0.A will more clearly state the requirements for l completion of surveillance requirements and the allowed exceptions to l those requirements.
A
. . l
. \
Exhibit A Page 2 of 4 C. Prooosed New Technical Soecification Section 4.0 B A new Specification 4.0.B is being incorporated into Section 4.0 to add Standard Technical Specification Section 4.0.3, as modified by Generic Letter 87 09, to the Prairie Island Technical Specifications. The incorporation of the proposed Specification 4.0.B will clarify when a missed surveillance constitutes a violation of the operability requirements of a limiting condition for operation and will clarify the applicability of action requirements and the time during which the limits apply.
Safety Evaluation '
It is overly conservative to assume that systems or components are inoperable when a surveillance requirement has not been performed. The opposite is in fact the case; the vast majority of surveillances demonstrate that systems or components in fact are operable. When a surveillance has been missed, it is primarily a question of operability that has not been verified by the performance of the required surveillance.
l The NRC Staff concluded in Oeneric Letter 87-09, after taking several factors into account, that 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> would be an acceptable time limit for completing a missed surveillance when the allowed out of service times of the action requirements are less than this time limit or when shutdown action requirements apply. The NRC Staff concluded that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time limit would balance the risks associated with an allowance for completing the surveillance within this period against the risks associated with the potential for a plant upset and challenge to safety systems when the alternative is a shutdown to comply with action requirements before the surveillance can be completed.
In agreement with the conclusions of the NRC Staff evaluation of the modified Standard Technical Specification 4.0.3, described in Generic Letter 87-09, Northern States Power believes there is reasonable assurance that the health and safety of the public will not be adversely affected by the proposed Technical Specification changes.
Determination of Sirnificant Hazards Considerations The proposed changes to the Operating License have been evaluated to determine whether they constitute a significant hazards consideration as required by 10
-CFR Part 50 Section 50.91 using the standards provided in Section 50.92.
This analysis is provided below:
- 1. The proposed amendment will not involve a significant increase in the erobability or consecuences of an accident oreviousiv evaluated.
The proposed changes to the current contents of Specification 4.0 are administrative in nature and therefore have no affect on accidents previously evaluated.
The proposed Specification 4.0 B conforms with the guidance provided in Generic Letter 87 09. It proposes a delay of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in the application of action requirements to permit the completion of a missed surveillance. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time limit in the application of the action
l .
i ,
ExhibiQ A Page 3 of 4 statements, following the identification of a missed surveillance, balances the risks associated with an allowance for completing the surveillance within this period against the risks associated with the potential for a plant upset and challenge to safety systems when the alternative is a shutdown to comply with action requirements before the surveillance can be completed. Therefore, the proposed Specification 4.0,B vill not significantly affect the probability or consequences of an accident previously evaluated.
- 2. The proposed amendment will not create the possibility of a new or different kind of accident from any accident oreviousiv analyzed.
The proposed changes to the current contents of Specification 4.0 are administrative in nature and therefore will not create the possibility of a new or different kind of accident from any previously evaluated.
The proposed Specification 4.0.B only affects the performance of surveillance requirements. While it may result in the delay of operability verification following discovery of a missed surveillance, it does not involve any modification in operational limits. There are no new failure modes or mechanisms associated with the proposed Specification 4.0.B because the proposed changes will not affect what plant equipment is required to be operable or how that equipment is operated. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any previously evaluated, and the accident analyses presented in the Updated Safety Analysis Report will remain bounding.
- 3. The proposed amendment vill not involve a significant reduction in the marcin of safety.
The proposed changes to the current contents of Specification 4.0 are administrative in nature and therefore will have no affect on the plant's margin of safety.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> delay for completion of a missed surveillance test included in the proposed Specification 4.0.B conforms with the NRC Staff guidance provided by Generic Letter 87 09. The NRC Staff concluded in Generic Letter 87 09, after taking several factors into account, that 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> would be an acceptable time limit for completing a missed surveillance when the allowed out of service times of the action requirements are less than this time limit or when shutdown action requirements apply. The NRC Staff concluded that the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time limit would balance the risks
, associated with an allowance for completing the surveillance within this period against the risks associated with the potential for a plant upset and challenge to safety systems when the alternative is a shutdown to comply with action requirements before the surveillance can be completed.
Therefore, the proposed Specification 4.0.B will not result in any reduction in the plant's margia of safety.
Based on the evaluation described above, and pursuant to 10 CFR Part 50, Section 50.91, Northern States Power Company has determined that operation of the Prairie Island Nuclear Generating Plant in accordance with the proposed license emendment request does not involve any significant hazards considerations as defined by NRC regulations in 10 CFR Part 50, Section 50.92.
1
Ekhlbit A Page 4 of 4 Environmental Assessment Northern States Power has evaluated the proposed changes and determined that:
- 1. The changes do not involve a significant hazards consideration,
- 2. The changes do not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or
- 3. The changes do not involve a significant increase in indivi. dual or cumulative occupational radiation exposure.
Accordingly, the proposed changes meet theS eli ibility criterion for -
categorical exclusion set forth in 10 CFR Part 51 Section 51.22(c)(9).
Therefore, pursuant to 10 CFR Part 51 Section 51.22(b), an environmental assessment of the proposed changes is not required.
9
- - - _ _ _ . _ _ _ _ . _ _ _ _ _ _