Text
__
.~
cgr Entergy Operations,Inc.
ENTERGY
% 6? 107 MR W. T. Cottia
^
July 2, 1992 U.S. Nuclear Regulatory Commission Mall Station P1-137 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Final Response to Generic Letter 89-13; Service Water System Problems Affecting Safety-Related Equipment GNRO-92/00078 Gentlemen:
On August 1, 1989, Entergy Operaticns, Inc. received Generic Letter (GL) 89-13, Service Water System Problems Affecting Safety-Related Equipment.
GL 89-13 required licensees to submit information regarding their service water systems to assure compliance to regulatory requirements and to confirm that the safety functions of their service water systems are being met.
On January 29, 1990, Entergy submitted an initial response to Generic Letter 89-13.
In this response Entergy described the programs and actions, both in place and planned, that would adequately satisfy the recommendations of GL 89-13.
The Staff, by way of letter dated December 13, 1990, accepted our response on the basis that it fulfilled the requirement of GL 89-13.
The attached is the final response to GL 89-13 which is required to be submitted within 30 days of completion of all initial tests or program activities.
This letter confirms that all initial tests and activities have been completed and that continuing programs have been established as required by the generic letter. This information is being provided under affirmation pursuant to 10CFR50.54(f).
n.,
I! L/ U U t) w
/
G9206301./SNLICFLR - 1
\\
9207080271 920702 PDR ADOCK 05000416 P
ppg
4 July 2,1992 GNRO-92/00078 Page-2 of 3 Please advise if you require any additional information on this. natter.
Yours truly, w r & ~~
WTC/JS/ams attachments: 1) Affirmation per 10CFR50.30
- 2) Final Response to Gnneric Letter 89-13
- cc:
Mr. D. C. Ilintz (w/a)
Mr. J. L. Mathis (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. 5.'Reynolds (w/a)
Mr.11. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/2)
Of fice of Nuclea-z Reactor Regulation U.S.. Nuclear Regulatory Commission Mail Stop 13113 Washington, D.C.
20555 Dr. Alton B'. Cobb (w/a)
Stato IInalth Officer
-State Board of Health P. O. Box 1700 Jackson, tiississippi 39.05 G9206301/SNLICFLR - 2
. to.GNRO-92/00078-BEFORE Tile UNITED STATES NUCI. EAR REGUI.ATORY COMMISSION 1,ICENSE NO. NPF-29 DOCKET NO 50-416 IN TIIE MATTER OF HISSISSIPPI POWER & I,IGilT COMPANY and SYSTEM ENERGY RESOURCES, INC.
and SOUTil MISSISSIPPI Ei.ECTRIC POWER ASSOCI ATION and ENTERGY OPERATIONS, INC.
AEEIRttATION I, W. T. Cottic, being duly sworn, state that I am Vice President, Operations GGNS,of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources, Inc., and South Mississippi Electric _ Power Association I am authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this application for amendment of the Operating i.icense of the Grand Gulf Nuclear Station; that I signed this application as V. ice President, Operations GGNS of Entergy Operations. Inc. ; and that the statements made and the matters set forth therein are true and correct to the best of my knowledge, information and belief.
MVW W. T. Cottle
. STATE OF MISSISSIPPI COUNTY OF CLAIR 0RNE SUBSCRIBED AND SWORN To before me, a Notary Public, in and for the County and State above named, this Q
day of n ph, 1992.
..( SEAL) d 4C Notary Pulili My commission expires:
l
) W :n b;hes July I,IE 4
. G9206301/SNI,1CFLR - 4
At,tachment 2 to GNRO-92/00078 4
FINAL RESPONSE TO GENERIC LETTER 89-13 A.
NRC Generic _ Letter _89_-13,_ Action I For open-cycle service water systems, implement and maintain an ongoing program of survel1 lance and cont.rol t echniques to significantly reduce the incidence of flow blockage problems as n result. of binrouting.
GGNS Response The initial submittal described treat ment, practices, and monitoring programs already in place that adequately addressed this action item.
No subsequent actions were necessnry.
B.
NRC Generic Lett er 89-13,_.Act_fon 11 e
Conduct n test program to verify the heat t rnus fer capability of nll safety-related heat exchangers cooled by service water.
GGNS Response GGNS has developed a heat removal performance and testing program for safety-related hent exch9ngers supplied by the Standby Service Water (SSW) System.
Baseline data for these heat exchangers have been established for implementation of t he program as required by GL 89-13.
1.
Thermal performance testing of SSW Loops A and C heat exchangers was performed during Refueling Outage Number 4 with the exception of RilR A pump room and RilR A. pump sent coolers which were tested during Refueling Outage Number 5.
2.
Thermal performance testing cf SSW Loop B hent exchangers, RilR A pump room cooler, and RilR A pump sent cooler was pnrformed during Refuniing Out.nge Number 5.
C.
NRC Generi_c_ Letter _.89-13, Action II.I Ensure by establishing a routine inspection and maintenance progtem for open-cycle servico water system piping and components that corrosion, croslon, protective contIng fniiure, siIting, and biofouling cannot degrnde thn performance of the sa fety-reinted systems supplied by service water.
GGNS Response The initial submittal described routine inspection meintenance activities already being performed by adequat ely addressn1 this a-tion it em.
No subsequent nctions were necessary.
G9206301/SNhlCFLR - 5
.~..
Att achment-2 to GNR0e92/00078 l
Page 2 i
l D..
NRC Generic Letter 89-13, Action IV Confirm -that the service water system will perform its-intended function in accordance with the licensing basis for thn plant.
GGNS Pasponse The initial submittal provided confirmation that the SSW system will perform its intended function in accordance with the licensing basis for GGNS. No subsequent actions were necessary.
E.
-NRC Generic Letter _89-13,_ Action V Confirm that maintenancs practices, operating and emergency procedures, and training that involve the service water system are adequate to ensure that safety-related equipment cooled by the service water system will function as 1ntended and that operators of this equipment will perform effectively.
GGNS Response The initial submittal described practices, procedures and training i
already in place that adequately addressed this action item.
No subsequent actions were necessary.
i I
I n
l l
G9206301/SNhICFhR - 6 l
.. ~ _