Forwards Final Design Review & Quality Evaluation Rept for Tdi Diesel Generators Installed at Facility.Recommendations Re Component Maint & Surveillance Outlined in App II of Rept.W/O Encl
ML20101L752
Person / Time
Site: River Bend 
Issue date: 12/24/1984
From: Deddens J
GULF STATES UTILITIES CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RBG-19766, NUDOCS 8501020360
Download: ML20101L752 (1)


Text

r i

Gl!LF STATES UTELETIES COMPANY RIVER BENO STATION POSTOfaCfPOX220 50 FRAhcisvlLLE. LOUIS 4ANA 70775 AREA CODE 504 635 3237 387-4257 December 24, 1984 RBG 19766 File No. G9.5 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Denton:

River Bend Station - Unit 1 Docket No. 50-458 Enclosed for your review are twelve (12) copies of the final Design Review and Quality Revalidation (DR/QR)

Report for the Transamerica

Delaval, Inc. (TDI) diesel generators installed at River Bend Station.

This four volume report was

prepared, approved and submitted to Gulf States Utilities (GSU) by the TDI Diesel Generator Owners' Group Technical Staff.

Additionally, the TDI Diesel Generator Owners' Group Program has made recommendations concerning component maintenance and surveillance.

These recormendations have been assembled from i

manufacturers manuals and the component DR/QR surrmary reports.

l These maintenance and surveillance recommendations are outlined in Appendix II of this DR/QR report.

GSU recognizes that although the recommendations of this report are not requiremente, their adoption will give added that the TDI diesel generators installed at River Bend assurance Station will perform their intended function for the life of the plant.

These recommendations represent a conservative approach to insuring diesel genera +or reliability.

In some specific

cases, however, GSU may propose alternate means and justifications of insuring the reliability of the diesel engines l

which deviate from the recommendations of the TDI Diesel l

Generator Owners Group.

These specific cases are currently under revieu and will be identified to the Staff by January 31, 1985.

i Sincerel r

OkO g

PDR

.C.

Deddens Vice President River Bend Nuclear Group JEB/WJR/JEP/je g