ML20101H167
| ML20101H167 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/29/1996 |
| From: | C-E OPERATING PLANTS OWNERS GROUP |
| To: | |
| Shared Package | |
| ML20101H154 | List: |
| References | |
| CENPD-279, CENPD-279-S07, CENPD-279-S7, NUDOCS 9603290121 | |
| Download: ML20101H167 (10) | |
Text
<-
b EM COMBUSTION ENGINEERING OWNERS GROUP CENPD-279 SUPPLEMENT 7 ANNUAL REPORT ON ABB CE ECCS PERFORMANCE EVALUATION MODELS FINAL REPORT j
CEOG TASK 923 prepared for the C-E OWNERS GROUP February 1996 i
i I
- Copyright 1996 Combustion Engineering, Inc. All rights reserved h
I ABB Combustion Engineering Nuclear Operations F
3_y 78R*8a!A38888s17 P
PDH
ABSTRACT This report describes changes and errors in the ABB Combustion Engineering evaluation models for ECCS analysis in 1995 per the requirements of 10CFR50.46. For this reporting period, one error in the input processing for the COMPERC-H refill /reflood code for large break LOCA analysis was found and corrected. No other changes were made to the ABB CE evaluation models for the large break, small break or post-LOCA long term cooling calculations.
Correction of the error in COMPERC-II had no effect on the cladding temperature (PCT) for large break LOCA. The sum of the absolute magnitudes of the PCT changes for large break LOCA from all reports to date continues to be less than 1 *F. No change occured in the PCT for small break LOCA or post-LOCA long term cooling. Per the criteria of 10CFR50.46, no action beyond this annual report is required.
e i
TABLE OF CONTENTS Section Title East
1.0 INTRODUCTION
1 2.0 ABB CE CODES USED FOR ECCS EVALU~ATION 3
3.0 EVALUATION MODEL CHANGES AND ERROR CORRECTIONS 4
3.1 COMPERC-II for Large Break LOCA 4
3.1.1 Code Description 3.1.2 Error in COMPERC-II 3.1.3 Correction of COMPERC-II Code Error 3.1.4 Impact of COMPERC-II Error on PCT
4.0 CONCLUSION
S 6
5.0 REFERENCES
7 ii
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _