Forwards Supplemental ISI Rept Cycle 5 Refueling Outage for Feb-Mar 1995 for Unit 2
ML20101F702
Person / Time
Site: Byron Constellation icon.png
Issue date: 03/20/1996
From: Wozniak D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101F704 List:
References
BYRON-96-5031, NUDOCS 9603260125
Download: ML20101F702 (1)


Text

i i

Commonw calth I dNin Compan) t l

11) run Generating Station j

4 iso North German Chun h Road

)

fly,ron. IL 610109~9 6

'ic! H I 5-2,4 6 5 i i 1 March 20,1996 1

LTR:

BYRON-96-5031 FILE:

3.11.0321 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Comed Byron Station Unit 2 Supplemental Inservice Inspection Report for interval 1, Period 3, Outage 1 (B2R05) l Attached is a supplemental report of the inservice inspections performed at Comed, Byron i

Unit 2 from October 26,1993 to March 25,1995. This supplement details volumetric examinations of nozzle inner radii that were intentionally omitted from the B2R05 Summary Report. This report is submitted to you in compliance with the requirements of Article IWA-G000 of the Section XI of the ASME Boiler and Pressure Vessel Code,1983 Edition through the Summer 1983 Addenda. This report covers Byron Unit 2, interval 1, Period 3, Outage 1 inspections.

If there are any additional questions, please contact Mr. G. L. Hagemann at Byron Station (815) 234-5441, extension 2880.

l Sincerely, C

I D. B. Wozniak Q Site Engineering Manager Byron Nuclear Power Station l

l DBW/GH/cb 9603260125 960320 PDR ADOCK 05000455 G

PDR Attachment t

cc:

H. J. Miller, NRC Regional Administrator, Rlli G. F. Dick, Jr., Byron Project Manager - NRR H. Peterson, Senior Resident inspector, Byron Office of Nuclear Safety -IDNS 9600m3 Site Engineering File o

p;\\sec\\byrltr\\96-5031. doc V

i I

me-C_na,