MONTHYEARML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20100J6831996-02-22022 February 1996 Application for Amend to License DPR-50,consisting of Change Request 254,revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Station Battery Cell Parameters Not Met ML20095J2261995-12-21021 December 1995 Revised TS Change Request 254,raising Low Voltage Action Level to 105 Volts DC ML20091L2831995-08-23023 August 1995 Rev to TS Change Request 223 to License DPR-50,incorporating Ref to 10CFR20.1302 ML20087F4881995-08-11011 August 1995 Rev to TS Change Request 252 to License DPR-50,removing TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements.Certificate of Svc Encl ML20086R3001995-07-24024 July 1995 Rev to LAR 250 to License DPR-50,clarifying Section III, SE Justifying Change for source-range Nuclear Instrumentation SRs ML20085N1551995-06-22022 June 1995 TS Change Request 227 to License DPR-50,replacing Pages for App A.Certificate of Svc Encl ML20084N3461995-06-0101 June 1995 TS Change Request 223 to License DPR-50,deleting Remaining Portions of RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084L4201995-06-0101 June 1995 TS Change Request 251 to DPR-50,revising TS 5.3.1.1 to Describe Use of Advanced Clad Assemblies ML20084B3261995-05-24024 May 1995 Application for Amend to License DPR-50.Amend Would Change Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7771995-05-17017 May 1995 Application for Amend to License DPR-50,consisting of Change Request 252,removing Chemical Addition Sys Requirements from TS to COLR ML20079A7771994-12-23023 December 1994 Rev to TS Change Request 221 to License DPR-50,revising TS Page 3-32a ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20069A6731994-05-20020 May 1994 TS Change Request 244 to License DPR-50,requesting Revised CR Trip Insertion Time Testing Acceptance Criterion for Remainder of Cycle 10 for 12 Specific CRs Which Initially Experienced Slow Rod Drop Times During Testing on 940317 ML20065M6681994-04-19019 April 1994 TS Change Request 237 to License DPR-50,deleting Audit Program Frequency Requirements from TS & Relocating Subj Requirements to Operational QA Plan ML20065K0381994-04-11011 April 1994 TS Change Request 238 to License DPR-50,relocating Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR ML20073C7701994-03-22022 March 1994 Application for Amend to License DPR-50 Re TS Change Request 242 Concerning Control Rod Trip Insertion Time Testing ML20064J3771994-03-11011 March 1994 Application for Amend to License DPR-50,revising TS Re Allowable Outage Time for Emergency Feedwater Pumps During Surveillance Activities 1999-08-20
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20209D6651999-07-0808 July 1999 Corrected TS Pages 3-21,4-5a,4-9,4-38 & 6-3 to Amends 211 & 212 to License DPR-50.Pages Failed to Reflect Previously Approved Changes Granted in Amends 203 & 204 in Case of Amend 211 & 207 in Case of Amend 212 ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20195C6811998-11-12012 November 1998 Amend 52 to License DPR-73,relocating Audit Frequency Requirements from TMI-2 to TMI-2 Post Defueling Monitored Storage QA Plan & Extends Max Allowed Interval Between Certain Audits from 12 Months to 24 Months ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20134D7761996-10-24024 October 1996 Amend 51 to License DPR-73,revising TS to Extend Surveillance Interval for Demonstrating Operability of Containment Airlock ML20128K1831996-10-0808 October 1996 Amend 50 to License DPR-73,revising TS to Incorporate Improvement from Administrative Controls Section of Revised STS for B&W Plants ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20100J6831996-02-22022 February 1996 Application for Amend to License DPR-50,consisting of Change Request 254,revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Station Battery Cell Parameters Not Met ML20095J2261995-12-21021 December 1995 Revised TS Change Request 254,raising Low Voltage Action Level to 105 Volts DC ML20091L2831995-08-23023 August 1995 Rev to TS Change Request 223 to License DPR-50,incorporating Ref to 10CFR20.1302 ML20087F4881995-08-11011 August 1995 Rev to TS Change Request 252 to License DPR-50,removing TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements.Certificate of Svc Encl ML20086R3001995-07-24024 July 1995 Rev to LAR 250 to License DPR-50,clarifying Section III, SE Justifying Change for source-range Nuclear Instrumentation SRs ML20085N1551995-06-22022 June 1995 TS Change Request 227 to License DPR-50,replacing Pages for App A.Certificate of Svc Encl ML20084N3461995-06-0101 June 1995 TS Change Request 223 to License DPR-50,deleting Remaining Portions of RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084L4201995-06-0101 June 1995 TS Change Request 251 to DPR-50,revising TS 5.3.1.1 to Describe Use of Advanced Clad Assemblies ML20084B3261995-05-24024 May 1995 Application for Amend to License DPR-50.Amend Would Change Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7771995-05-17017 May 1995 Application for Amend to License DPR-50,consisting of Change Request 252,removing Chemical Addition Sys Requirements from TS to COLR ML20079A7771994-12-23023 December 1994 Rev to TS Change Request 221 to License DPR-50,revising TS Page 3-32a ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20069A6731994-05-20020 May 1994 TS Change Request 244 to License DPR-50,requesting Revised CR Trip Insertion Time Testing Acceptance Criterion for Remainder of Cycle 10 for 12 Specific CRs Which Initially Experienced Slow Rod Drop Times During Testing on 940317 1999-08-20
[Table view] |
Text
. ,. . _ _ _. . _ . _ ..
METROPOLITAN EDIS0N COMPANY JERSEY CENTRAL POWER AND LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION, UNIT 1 Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 217 >
This Technical Specification Change Request is submitted in support of i Licensee's request to change Appendix A to Operating License No. DPR-50 G;r l Three Mile Island Nuclear Station, Unit 1. As part of this request, proposed replacement pages for Appendix A are also includsd.
GPU NUCLEAR CORPORATION BY: NYrb Vice Presiden(And Director, THI-l-Sworn and subscribed befort me this l e day of Cnwt. , 1992.
O hN stmq.,
Notary Public N:erW&d my C% Cart /
_:sc~emwm t m mwome ram j.
9206240169 920619 PDR ADOCK C5000289 P PDR mp sm - -.me g-_ - - - - - . - n ~- --
C311-92-2072
- 1. TECHNICAL SPECIFICATION CHANGE RE0 VEST (TSCR) NO. 217 GPUN requests that the following changed replacement page be inserted
-into the existing Technical Specification:
Revised page: 3-63 This page is attached to this change request.
II. REASON FOR CHANGE This TSCR requests a temporary change to Technical Specification 3.16 to exclude Reactor Coolant Pump (RCP) Snubber RC-U-003 from the operability requirements applicable to safety related snabbers. This change is to be .in effect during the current operating cycle until inspection and repair of Snubber RC-U-003 and/or its hydraulic fluid supply tubing can be completed during the earliest outage of opportunity or refueling outage 10R, whichever occurs first.
III. SAFETY EVALUATION JUSTIFYING CHANGE The safety function af the RCP snubbers is to effectively restrain design basis seismic forces to ensure that seismic loads and stresses on the RCP and RCS piping do not rupture the reactor coolant pressure boundary (RCPB). Operability of the RCP is not required during or after a seismic event. Therefore, RCP operability need not be considered.
Primary coolant pump support systems have been analyzed for guillotine breaks or longitudinal splits of pump suction or discharge piping at any location between the steam generator and reactor vessel.
An engineering analysis has been performed to evaluate the effect of RCP Snubber RC-U-003 inoperability on the RCP and RCS piping for the remainder of Cycle 9 operation. This analysis was performed for the affected RCS loop and assumed Snubber RC-U-003 is ineffective in restraining seismic forces. The analysis shows that without this ,
snubber, the maximum pipe primary stress is approximately 4% over the design basis allowable stress of 1.8 Sm for operating pressure plus the maximum hypothetical earthquake (MHE) load (Zero Period Acceleration (ZPA) - 0.12 g) using USAS 831.7 Piping Code, February, 1968 through June, 1968 errata. The analysis also shows that the maximum pipe primary stress is within the design basis allowable stress of 1.5 Sm for design pressure plus the design earthquake load (ZPA = 0.06g).
An evaluation using the 1986 ASME Code shows stress levels well below the Code allowable of 3.0 Sm. Although the 1986 ASME Code criteria is not the current design basis for the TMI-l RCS, this assessment provides a more realistic evaluation of the actual seismic load bearing capacity of the RCPs and the RCS for TMI-1.
~
C311-92-2072 Reconciling the RCS to the 1986 ASME Code Section III is a longer term
~
- option and is not being pursued here. Relief is only needed on a temporary basis because the Snubber's fluid leakage will be rectified by or during the 10R refueling outage. Reconciliation to the 1986 Code in the short term would not be required.
The rigid restraint system of the affected RCP is capable of ,
withstanding LOCA loads introduced into the pump. With the snubber inoperable, the snubber would simply pass through, and likely mildly ,
dampen, the seismic loads experienced by the RCS Cold Leg Piping.
Should a seismic event occur, the possibility for damage to the ,
potentially fluidless snubber will be negligible because the motion would also be partially restrained by the rigid LOCA restraints; the snubber would not become a missile or debris.
There will be no effect on the thermal . response of the RCS piping because the inoperable snubber will not impose additional thermal loads on the RCS piping or restrain the piping during thermal expansion or contraction. In addition, potential inoperability of this snubber is based upon a theoretical loss of fluid whose absence would not allow -
lock-up of the snubber to occur. Therefore, the only change in snubber function during a thermal expansion or contraction will be a slight increase in drag forces which would be negligible considering the
. thermal expansion forces resulting from piping the size of the RCS cold leg pipe.
As documented in the TMI-l FSAR, Section 2.8.1, the current seismicity analysis indicates that Penraylvania is relatively inactive seismically.
This is based upon 200 years of historical data and 40 years of instrumented data. The conservative estimate of the maximum earthquake intensity to be expected at the site is a low inteasity VI on the Modified Mercali scale. This corresponds to a ground acceleration of 0.04g. The plant design earthquake (DE) is conservatively based on a basic ground motion of 0.06g. The MHE is 2 x design earthquake (0.129 ).
Accordingly, the probability of a DE event is low and the probability of an MHE event .is even more remote, based on seismic history of the area.
In summary, structural analysis in accordance with the USAS B31.7
- demonstrates that, with RC-U-003 inoperable,1) during the maximum hypothetical earthquake, the functional integrity of RCS components and the reactor coolant pressure boundary is malatained and 2) during a design basis LOCA, a secondary break of the RCPB would not occur. In
. practical terms this means that under conditions of the maximum loads for which the plant must be analyzed, the only potential damage predicted would be that possibly some local deformation could occur. '
Therefore, even when analyzed to a very conservative code, the analysis
- shows that the maximum stresses would not cause a break in the reactor L coolant pressure boundary.
l i
l
_ ~ - - , o , -%. . , _ . . . . , - - _ _ _._
~
- C311-92-2072 .
Under the current conditions, GPU Nuclear intends to maintain snubber RC-U-003 operable throughout Cycle 9 operation. If operability of this snubber cannot be maintained until the next outage of opportunity, an amendment authorizing this' change request would be needed to avoid shutting down the plant after the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowable outage time provided by TS 3.16.1. In accordance with our existing evaluation, a shutdown and inspection would only be required in the event of a confirmed
~
earthquake affecting the TMI-1 site. To avoid the need for an unnecessary shutdown and inspection of the RCS, additional calculations by B&W will be needed to define the ground motion that can be tolerated ,
without a subsequent inspection, assuming that snubber RC-U-003 is inoperable. GPU Nuclear does not intend to proceed with the additional calculations at this time. If snubber RC-U-003 remains operable throughout the cycle, the additional calculations will not needed. If operation in accordance with this TSCR is necessary with RC-U-003 inoperable, GPU Nuclear will determine whether to complete the '
additional calculations described above or continue to operate with a requirement to shut down and inspect the RCS following an earthquake.
IV. NO SIGNIFICANT HAZARDS CONSIDERATIONS GPUN has determined that this Technical Specification Change Request ,
involves no significant hazards consideration as defined by the NRC in 10 CFR 50.92.
- 1. The inoperability of Snubber RC-U-003 does not involve a significant increase in the probability of occurrence or the consequences of an accident or malfunction of equipment irportant to safety previously evaluated in the SAR. The accident or malfunction related to this change is the occurrence of the maximum hypothetical earthquake or the design basis LOCA. Inoperability of these snubbers is unrelated to.the possibility of. occurrence of these postulated design basis
, events. Seismic design and mounting of these snubbers ensures that other safety related equipment will not be adversely effected. The ,
structural analysis referenced above, which considers original design basis criteria as well as ASME 1986 Code criteria, demonstrates that the consequences of the postulated maximum hypothetical earthquake or design basis LOCA, and applicable loading combinations are not increased.
4
- 2. The inoperability of Snubber RC-U-003 does not create a possibility for an accident or malfunction of a different type than any previously identified in the SAR. Under normal operating conditions including heatup and cooldown thermal transients, these snubbers do not perform a safety-related function. The structural analysis referenced above, which considers original design basis criteria as well as ASME 1986 Code criteria, demonstrates that the RCS components and RCPB functional integrity is maintained during a maximum hypothetical earthquake and that the integrity of the l
remainder of the RCPB-is maintained during design basis LOCA loads such that_a secondary break of the RCPB would not occur. The snubbers are seismically designed and mounted which precludes '
interaction with other safety related equipment.
l'
,C311-92-2072
- 3. The inoperability of Snubber RC-U-003 does not involve a significant reduction in the margin of_safoty. Technical Specification Section 3.16 and 4.17 apply to all sa. sty-related snubbers and requires-each snubber to be operable whenever the system protected by the snubber is required to be operable. The intent of this Technical Specification, as defined in Technical Specification 3.16 Bases, is to ensure that the probability of structural damage to piping as a result of dynamic loads occurring from an earthquake or severe transient, or thermal motion, is not increased. The structural analysis referenced above demonstrates that the reactor coolant pumps and piping in this particular portion of TMI-l's system are '
capable of withstanding maximum hypothetical earthquake loads, ,
design basis LOCA loads, and applicable loading combinations, >
without Snubber RC-U-003 operability.
V. IMPLEMENTATION This TSCR is being submitted for NRC review and approval without
,. priority at this time based on our intent to maintain RCP Snubber t RC-U-003 operable until the next outage. However, GPU Nuclear will notify the NRC immediately if it becomes necessary to expedite issuance of the amendment approving this change.
This is a temporary change request covering the period of Cycle 9 ,
operation until Snubber RC-U-003 can be inspected and repaired during-
. the earliest outage of opportunity or refueling outage 10R, whichever occurs first.
It is requested that the amendment authorizing this TSCR be effective upon issuance.