ML20101E984
| ML20101E984 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/12/1992 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20101E987 | List: |
| References | |
| ULNRC-2647, NUDOCS 9206240209 | |
| Download: ML20101E984 (4) | |
Text
{{#Wiki_filter:. 190:Chauwau Lev Post O'bct t% 14) ' Stlou.L!ksnur: S3:65 3I4bbd2650 Umox ?""'nlt'" Etscnuca June 12, 1992 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington,-DC 20555 ULNRC-2647 Gentlement CALLAWAY PLANT DOCKET NUMBER 50-483 REVISION TO TECHNICAL SPECIFICATION SECTION 3/4.9.12, " SPENT FUEL ASSEMBLY STORAGE" Union Electric Company herewith transmits an application for amendment to Facility Operating License Number NPF-30 for the Callaway Plant. This amendment application requests a revision to Figure 3.9-1 of Technical Specification Section 3/4.9.12 to reflect a maximum initial enrichment of 4.45 w/o U-235-for fuel storage in Region 2 of the Callaway spent fuel pool. The Callaway Plant On-Site Review Committee and the Nuclear Safety Review Board have reviewed and. approved this amendment application. Attachments 1 through 4 provide the Technical Specification changes, Safety Evaluation, Significant Hazards Evaluation, and Environmental Consideration, respectively. provides the Callaway Plant Region 2 Fuel Rack Criticality Analysis. It has been determined that this amendment application does not involve any unreviewed safety question as defined in 10CFR50.59 nor a significant hazard consideration as determined per 10CFR50.92. ) l l l ^d 3 p n A r:, w ib 3 --vvuu s [ 9206240209 920612 PDR ADOCK 05000483 p PDR
-{i ~' i 4-i U.S. Nuclear Regulatory Commission -Page 2 It is requested that this amendment be approved prior to callaway Plant Refuel 6 which is scheduled for Fall 1993. If you have any questions on this amendment application, please contact us.
- )._
Very truly yours, i l // l' 4 j Donald F. Schnell i GAC/dls Attachments: 1. Technical Specification Changes ,j. 2. Safety Evaluation 3. Significant Hazards Evaluation 4. Environmental Consideration j 5. LFNF-92-02, "Callaway Plant Region 2 Spent } Fuel Rack Criticality Analysis," May 1992 -( t t-i lo L L l: l < ~....,... s,_.
a P-P e> k -k-O -_5-ri b t..k-N A Ws,a e cc: T. A. Baxter, Esq. Shaw, Pittman, Potts & Trowbridge 2300-N. Street, N.W. Washington, D,C. 20037 Dr. J. Oe Cermak CFA. Inc. 182es-A Flower Hill Way Gaithersburg, MD 20879-5334 R. C. Knop. j Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission 1 Region III 799 Roosevelt Road l Glen Ellyn, Illinois 60137 Bruce Bartlett l Callaway Resident Office U.S.LNuclear. Regulatory Commissicn RR#1- - l Steedman, Missouri 65077 H L. R.. Wharton (2) Office of Nuclear Reactor Regulation U.S. N's~ lear Regulatory Commission 1 White Flint, North, Mail Stop-13E21 '.1555 Row;ville-Pike Rockville, MD 20852 Manager,. Electric Lepartment Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 Ron Kucera . Department of Natural Resources P.O. Box 176 Jef ferson City, lMO 65102 l ll L \\ l l l. i; i ... -.}}