ML20101E582
| ML20101E582 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 03/15/1996 |
| From: | Eric Simpson Public Service Enterprise Group |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20101E585 | List: |
| References | |
| LR-N96075, NUDOCS 9603250122 | |
| Download: ML20101E582 (3) | |
Text
__
Public & Nice Electric a d Gas C a pany E. C. Simpson Public Service Electric and Gas Company P.O. Box 236,' Hancocks Bridge, NJ 08038 603-339-1700 Senics Vce President Nuclear Engineering NAR 151996 LR-N96075 Document Control Desk U.
S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
CORE OPERATING LIMITS REPORT, NFS-0145, REV. O HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 Public Service Electric and Gas Company hereby transmits the Hope Creek Generating Station (HCGS) Cycle 7/ Reload 6 Core Operating Limits Report, NFS-0145, Revision O.
This report is submitted in accordance with HCGS Technical Specification 6.9.1.9.
The specific core operating limits contained in NFS-0145, Revision 0, have been determined using NRC-approved methodology and were established such that all applicable limits of the plant safety analysis continue to be met.
Appendices A and B of NFS-0090, Revision 0, submitted on April 26, 1994, consisted of reprinted proprietary information from the following two General Electric (GE) reports:
General Electric Report 23A6526AA, Revision 0,
" Supplemental Reload Licensing Submittal for HCGS Reload 3, Cycle 4,"
dated January 1991.
General Electric Report 23A76251296AA, Revision 0,
" Lattice-Dependent MAPLHGR Report for HCGS Reload 5, Cycle 6," dated October 1993.
The proprietary information in the above GE reports previously provided is contained in Appendices A, B,
and C of this report.
Therefore, based upon verbal requests Ly NRC to not submit duplicative proprietary material that requires treatment under 10CFR2.790, we tre not submitting the last 9 pages of NFS-0145 l
which consist of the Appendices.
9603250122 960315 i
DR ADOCK 05000 4
couvw-Pnnled on SpTot 9
MAR 151566 Document Control Desk LR-N96075 l
Should you have any questions regarding this submittal, we will be pleased to discuss them with you.
Sincerely, i
i Attachment (1)
Mr. T. T.
Martin, Administrator l
USNRC Region I Mr.
D. H. Jaffe USNRC Licensing Project Manager - Hope Creek Mr.
R. J.
Summers USNRC Senior Resident Inspector (X24) l Mr.
K. Tosch, Manager IV New Jersey Department of Environmental Protection Bureau of Nuclear Engineering l
I i
I a
i i
i I
I
--.e--.
n.
-r.---.
REF: LR-N96075 l
l STATE OF NEW JERSEY
)
)
SS.
l COUNTY OF SALEM
)
E. C. Simpson, being duly sworn according to law, deposes and says:
I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters l
set forth in the above referenced letter concerning the Hope l
Creek Generating Station, are true to the best of my knowledge, information and belief.
l Subscribed and Sworn to before me this /T day of M 1996 Lusto.kuL Notary hublic h Neh Jersey ELIZABETH J. KIDD NOTARY PUBUC OF NEW JERSEY uv Commission Expires Apr8 25,2000 i
My Commission expires on i
1 I
i