Revised Monthly Operating Rept for Jan 1996 for Wolf Creek Generating Station
ML20101C990
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/31/1996
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20101C967 List:
References
NUDOCS 9603190317
Download: ML20101C990 (1)


Text

.!

' ' ' Attachment 2 to 96-0044 Page 2 of 2 OPERATING DATA REPORT a .

DOCKET NO. 50-482 WOLF CREEK GENERATING STATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 2-5-96 TELEPHONE 316-364-8831 OPERATING STATUS

1. Reporting Period: January, 1996 Gross Hours in Reporting Period: 744
2. Currently Authorized Power Level (MWt) : 3565 Max. Depend. Capacity (MWe-Net). 1167 Design Electrical Rating (MWe-Net): 1170
3. Power Level to Which Restricted (If Any) (MWe-Net) : N/A
4. Reasons for Restriction (If Any): N/A This Month Yr. to Date Cumulative
5. Number of Hours Reactor was Critical 699.6 699.6 75,316.4
6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8
7. Hours Generator on Line 699.6 699.6 74,479.3
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWh) 2,481,700 2,481,700 247,823,370
10. Gross Electrical Energy Generated (MWh) 863,196 863,196 86,122,116
11. Net Electrical Energy Generated (MWh) 828,168 828,168 82,265,019
12. Reactor Service Factor 94.0% 94.0% 82.5%
13. Reactor Availability Factor 94.0% 94.0% 82.9%
14. Unit Service Factor 94.0% 94.0% 81.6%
15. Unit Availability Factor 94.0% 94.0% 81.6%
16. Unit Capacity Factor (Using MDC) 95.4% 95.4% 79.3%
17. Unit Capacity Factor (Using Design MWe) 95.1% 95.1% 77.0%
18. Unit Forced Outage Rate 6.0% 6.0% 4.8%
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each).

Refuel VIII outage began February 3, 1996.

20. If Shut Down at End of Report Period, Estimate Date of Startup: March 31, 1996 Wolf Creek Generating Station Monthly Operating Report January, 1996 Page 3 of 6 9603190317 960314 PDR ADOCK 05000482 R PDR