ML20101A870
| ML20101A870 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/07/1996 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20101A873 | List: |
| References | |
| LCV-0768, LCV-768, NUDOCS 9603130321 | |
| Download: ML20101A870 (2) | |
Text
W
~
Georgta Power Company 40 inverress Center Parkway.
Post Office Box 1295 -
Barrningham, Alabama 35201 Telephone 205 877 7122 Georgia Power C. K. McCoy Vice Presdent, Nuclear Vogtle Project March 7,1996 ine soo,nern ewrc sys,ern LCV-0768 Docket Nos. 50-425 1
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gen'lemen:
VOGT.
.ECTRIC GENERATING PLANT - UNIT 2 SUBMITTAt oF SURVEILLANCE CAPSULE TEST RESULTS In accordance with 10 CFR 50 Appendix H and 10 CFR 50.4, Georgia Power Company is cubmitting within one year of capsule withdrawal from Vogtle Electric Generating Plant-Unit 2, WCAP-14532, which is a srmmary test report for Surveillance Capsule Y.
This report includes the data required by ASTM E 185-82, and the results of all fracture
)
toughness tests conducted on the beltline materials. The existing pressure temperature limits for the heat-up and cooldown curves in the Technical Specifications are more conservative than the limits obtained from analyzing Capsule Y; therefore, no changes to the heatup and cooldown curves in the Technical Specifications are required. Since the methodology med to calculate cold overpressure protection setpoints has recently changed, we expect to submit a revision to the Pressure Temperature Limits Report
( PTLR ) by October 30,1996.
Additionally, we are also submitting a copy of WCAP-14534, which is the most recent evaluation of pressurized thermal shock for the Vogtle Electric Generating Plant-Unit 2 vessel.
Please contact my office if there are any questions.
Sincerely C. K. McCoy
Enclosures:
- 1. WCAP-14532, Analysis of Capsule Y
- 2. WC.AP-14534, Evaluation of PTS
~
9603130321 960307 l
PDR ADOCK 05000425
\\\\
P PDR c.,
a'
)
GeorgiaPower b J
cc: Georgia Power Comnany Mr. J. B. Beasley Mr. M. Sheibani
-NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle i
l i
700775 1