ML20101A809

From kanterella
Jump to navigation Jump to search
Forwards Nonproprietary & Proprietary Version of Rev 1 to EPIP-OSC-21, Activation of Osc. Proprietary Version Withheld
ML20101A809
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/29/1992
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19354F313 List:
References
LIC-92-166R, NUDOCS 9204300360
Download: ML20101A809 (2)


Text

_

Omaha Public Power District 444 South 16th Street Mall Omaha Nebraska 68102-2?.47 402/636-2000 April 29, 1992 LIC-92-166R U. S. Nuclear Regulatory Commi:sion ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555

References:

1.

Docket No. 50-235 Desk) tiated April (W. G. Gates) to NRC (Document Control Letter from OPPD 2.

8, 1992 (LIC-92-152R)

Genticmen:

SUBJECT:

Re-submittal of Fort Calhoun Station Emergency Plan Implementing Procedure (EPIP)-0SC-21 R1 to Document Control Desk (DCO)

Omaha Public Power District is submitting rep?acement versions of procedure EPIP-0SC-21 R1 and EPIP Index, page 1 of 3 issued 4/2/92 to the DCD - holder of EPIP copy number 165.

The version of EPIP-0SC-21 R1 subnitted by Reference 2 that was intended for the Public Document Room was incorrectly stamped "Contains Privacy And/0r Proprietary Information." This error did not affect the copies of EPIP-0SC-21 R1 sent to NRC Region IV headquarters.

If you should have any questions, please contact me, Sincerely,

/& b h W. G. Gates Div Lion Manager Nuclear Operations WGG/sel Enclosures c:

LeBoeuf, Lamb, Leiby & MacRae (w/o Enclosures)

R. D. Martin, NRC Regional Administrator, Region IV, (w/o Enclosures)

D. L. Wigginton, NRC Senior Project Manager, (w/o Enclosures)

S. D. Bloom, NRC Project Enkesident Inspector, (w/)o Enclosures) f,k ineer (w/o Enclosures R. P. Mullikin, NRC Senior

,'p},h 50060 bu. h/

  • **"la n % f *
  • b

,h ggg432888RP388hs

"' 2' j

FORM EP-2 OMAHA PUBLIC POWER DISTRICT Nuclear Services Division.

Emergency Planning Department CONFIRMATION OF TRANSMITTAL 1

Imeroency Plan Implementina Procedures (EPIPl Transmitted to:

Name:

hocun1en U Gnbal OC S k Date:

4"BAL ilolds and maintains EPIP Copy No.:

/65 The_ following_ changes are provided for your manual (s):

1

-REMOVE SECTION INSERT SECTION EFIP Index,'page 1 of 3, EPIP Index, page 1 of 3, issued--12/30/91 issued 4/2/92 EPIP-0SC-21, R0, issued 11/1/90 EPIP-OSC-21, R1, issued 4/2/92 Suninary of changes:

l

\\

3 All.f.4d-0{ /t7b' Superv

-EmerggyPlanning I hereby acknowledge receipt of the above changes and have included them in my assigned copy of the For+. Calhoun EPIPs.

-Signature Date

-Please sian-above and return within 10 workino days to:

Lenora Hearst Fort'Calhoun Station. FC2-4 L

Omaha Public Power District L

444 South 16th Street Ma11~

Omaha, NE:

68102-2247:

l NOTE: If your copy of the EPIPs has been transferred to another individual, please fill out the.information below, and return to-the address above.

i Name of New Holder Mailing Address

~

Title / Department.

Date Transferred

..