1 a -
KANSAS GAS AND ELECTRIC COMPANY TMt! ELECTAC COMPANY SLENN L KOESTER i
vect enassoam?.nucogan December 12, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 KMLNRC 84-214 Re:
Docket No. SIN 50-482 Subj: Testing of Radiation Monitors
Dear Mr. Denton:
The purpose of this letter is to request NRC approval of Kansas Gas and Diectric Company's (KG&E) plan for testing the Wolf Creek process radiation monitoring system.
Preoperational test SU3-SP01, " Process Radiation Monitoring System Pre-operational Test", demonstrates the operation of the Wolf Creek process radiation monitors. The abstract for this test is in the SNUPPS FSAR Section 14.2.12.1.86.
KG&E has determined that all of the process radiati.on monitors need not be tested prior to fuel load. By performing some of the testing during initial core load and the period of time prior to initial criticality, a significant schedule advantage can be attained without jeopardizing the safe operaticn of the plant or the health and safety of the public.
Test SU3-SP01 includes 39 monitors which are listed on the attached Tables 1 and 2.
Table 1 lists those monitors for which the preoperational test will be performed prior to fuel load. Surveillance tests will be completed as required by Technical Specifications. After the monitors listed on Table 1 have been tested, test results will be reviewed. Testing the monitors listed on Table 2 will continue and will be completed prior to initial criticality. Since all the monitors listed on the attached tables are supplied by the same vendor, any generic problems will likely be discovered during the pre-fuel load testing. In addition, prior to initial criticality, the monitors listed on Table 2 will not be serving any meaningful purpose.
It is requested that the NRC provide approval of KG&E's plan for testing the process radiation monitoring system.
Yours very truly,
[
O
@ Glenn L. Koester I I GLK:bb, w/a Vice President - Nuclear xc:PO'Connor (2), w/a RPDenise, w/a HBundy, w/a 201 N. Market -WicNte, Kansas - Mall Address: RO. Box 208 i Wichit.1, Kansas 67201 - Telephone: Area Code (316) 261-6451 L_...
Attachmentrto-
~"
KMLNRC'84-214-Tible 1
's.
Monitors to Be Tested Prior. to Fue1 LLoad TECHNICAL MONITOR FSAR REFERENCE
' POWER SPECIFICATION i
GT-RE-31 Containment Atmosphere Mon
- tor' Table 11.5-3 IE-3 3.3 1 GT-RE-32 Containment Atmosphere Mohitor Table 11.5-3 IE 3.3.3.1 GT-RE-22 Contaiment Purge System Monitor Table 11.5-3 IE 3 3.3.11 I
GT-RE-33 Contaiment Purge System Monitor Table 11.5-3 IE 3.3 3 11 GT-RE-59 Containment High Activity Monitor Table 11.5-3 IE 3336 GT-RE-60 Containment High Activity Monitor Table 11.5-3 IE 3336 GG-RE-27 Fuel Building Exhaust Monitor Table 11.5-3 IE 3 3 3.1 4
GG-RE-28 Fuel Building Exhaust Monitor Table 11.5-3 IE 3 3 3.1' GK-RE-04 Control Room Air Supply Monitor Table 11.5-3 IE 3 3 3.1 QC-RE-05 Control Room Air Supply Monitor Table 11.5-3 IE 3.3.3.1 j
GT-RE-21A Plant Unit Vent Monitor Table 11.5-4 non-IE 3 3 3 11 GT-RE-21B Plant Unit. Vent Monitor Table 11.5-4 non-IE 3 3 3 11 i
GH-RE-10A Radwaste Building Exhaust Monitor Table 11.5-4 non-IE
'3 3 3 11 1
3 GH-RE-10B Radwaste Building Exhaust Monitor Table 11.5-4 non-IE 3 3.3.11 HF-RE-45 secondary. Liquid Waste System Monitor Table 11.5-2 non-IE 3 3 3 10 ifB-RE-18 Liquid Radwaste Discharge Monitor Table 11.5-2 non-IE 3 3 3.10 LE-RE-59 Turbine Building Drain Monitor Table 11.5-2 non-IE.
.3.3.3 10-BM-RE-52 Steam Generator Blowdown Discharge Monitor Table 11.5-2' non-IE 3 3 3.10 4
Tablo 2 Attrchment to KMLNRC 84-214 4
Monitcrs.Which May Not Be Tscted Prict to Fuel Load
~$
MONITOR FSAR' REFERENCE POWER t
EG-RE-09 Component Cooling Water Monitor Table 11.5-1
'non-IE EG-RE-10 Component Cooling Water Monitor Table 11.5-1 non-IE SJ-RE-01 CVCS Letdown Monitor Table 11.5-1 non-IE-l SJ-RE-02 Steam Generator Liquid Radioactivity Monitor Table 11.5-1 non-IE BM-RE-25 Steam Generator Blowdown Processing Monitor Table 11.5-1 non-I?
EA-RE-4A Service Water Monitor Table 11.5-1 non-IE EA-RE-4B Service Water Monitor Table 11.5-1 non-IE i
HE-R E-16 Boron Recycle Distillate Ibnitor Table 11.5-1 non-IE EF-RE-35 Essential Service Water Monitor Table 11.5-1 non-IE EF-R E-36 Essential Service Water Monitor Table 11.5-1 non-IE FB-RE-50 Auxiliary Steam Condensate. Recovery Monitor Table 11.5-1 non-IE GE-RE-92 Condense-Air Discharge Monitor Table 11.5-3 non-IE i
GL-RE-60 Auxiliary Ventilation Exhau:sc Monitor Table 11.5-4 non-IE j
GK-RE-41 Access Control Area Vent. Exhaust 2nitor_
Table 11.5-4 non-IE GH-RE-22 Radwaste Building Exhaust Monitor Table 12.3-3 non-IE d
4 GH-R E-23 Waste Gas Decay Tank Vent mnitor Table-12 3-3 non-IE 4
FC-RE-385 Auxiliary Feedwater Turbine Exhaust Monitor Table 7A-4 (Sh. 12.4) non-IE l
AB-RE-111 Main Steam Relief Valve mnitor Table 7A-3 (Sh. 12 3) non-IE AB-RE-112 Main Steam Relier Valve Monitor Table 7A-3 (Sh. 12 3) non-IE
^
AB-R E-113 Main Steam Relief Valve mnitor Table 7A-3 (Sh.12. 3) non-IE AB-RE-114 Main Steam Relier Valve Monitor Table 7A-3 (Sh. 12.3) non-IE