O c~ # E N T E R G Y
- n. r, oura s W31'l 014 2 A1.05 QA April 15, 1992 U.S. Nuclear llegulatory Com:nission ATTN: Document Control Desh Washington, D.C. 20555 Subject :
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating fleport r
Gentlemen:
Attached is the subject monthly report which covers the operating statistles for the month of Macch,1992. This report is submitted per Section G.9.1.0 of the Waterford 3 Technical Specifications for Fuellity Operating I.leense No. NPF-36.
Very truly yours, r
f e)..;2, yw ~
Q.
)?
v ItFit /TJG/ ssf Attachment ec:
It.D. Martin, NitC llegion IV t
D.L. Wigginton, NitC-Nillt 11.11. McGehee N.3. Iteynolds F. Yost (IJtility Data Institute, ine. )
J.T. Whtelock (INPO llecords Center)
NRC Itesident inspectors Office I
L l
4 9204170196 920331 DR ADOCK 05000392
/
1 PDR L
I '
NRC MONTilLY Ol'LRATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 MARCll 1992 The unit operated at an average reactor power of 90.5% and experienced one forced maintenance outage during the period.
4 W310204B
__.m-_____.__._..
4 P
a e
L i
PRESSURIZER SAFETY VALVE P
FAILURES AND CllA1.LENGES KATERFORD 3 i
During the rnonth of March 1992, there were no pressurizer saiety valve failures or challenges.
l 2
+
f' 5
1 t
I t
h-4 p
4 W310204B
.J.-.
,,_,.-,..-...__,,,.-,...~....,.~,c....
OPERATING DATA REPORT i
UNIT NAME: WATERI'ORD 3 CITY / STATE. KILLONA/LA DATE: APRll, 1992_
t OPERATING STAT.U.S i
t
- 1. Docket: 50-382 Not_es
- 2. Reporting Period: [iAh;Cll, 1992
[
t
- 3. Utility
Contact:
PATRICK CENT 01ANZ1 t
Phone Number:
(504) 739-6683
- 4. Licensed Thermal Power (MWt): 3390
- 5. Nameplate Rating (Gross tlwe): 1200 t
- 6. Design Electrical Rating (Net MWe): J_104
{
- 7. Maximum Dependable Capacity (Gross !!We): _
{
1120 S. Maximum Dependable Capacity (Net MW): 107)
- 9. If Changes occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, i
Give Reasons:
10.
Power Level To Which Restricted, if Any (Net MWe):
NONE 11.
Reasons for Restrictions, If Any: N/A i
l This Month Yr.-to-Date Cumulative 12, llours In Reporting Period 744.0 2d84.0 57,145.0 13.
Number Of Hours Reactor Was Critical
. _ 682.7 IJ25.5 47,011.9 14.
Reactor Rene.rve Shutdown llours _ __
15 llours Generator on-Line 677.4
_., 1,_914.2 46d95.0 16.
Unit Reserve Shutdown Hours
_ _ i 4
- W3102048
-=---..m w.---
%_.-,,wvm...
,wr-
,m,,--w m.,.-w.%,.ve..-.=w,
,4#4,w.~---.w.-,
ewe,.,-w,--m.,,--..%m,v.w,,.*,,,,
--rw<-ww-'---
vv-m'-
,- ~-
_. _ _ ~
I OPERATING DATA REl'0HT (Continued)
This Month Y.-to-Date Cumulative 17.
Gross Thermal Energy j i.'.84,044 6.t45h807 152,000,282 i
Generated (MVii) 18.
Gross Electrical Energy 765J40
_ 2 165,710 51,037,130_
1 Generated (MkH) 19.
Net Electrical Energy 731,774
_2,071,069_
48 % 52_9 1
Generated (MkH) 20.
Unit Service factor 91.0 87.6 8.1_. 0 I
21.
Unit Availabilfty Factor
_91.0 8_7.6 81_.0 t
22.
Unit. Capacity Factor 91.5 88.2_
79.1 (Using MDC Net) i
- 23.
Unit Capacity Factor 89.1 85.9 77.1 i
(Using DER Net) 24.
Unit Forced Outage Rate 9.0 3.4 4.2 25.
Unit Forced Outage llours 66.6 66.6 2,051.4 26.
Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):
Refueling, 9/19/921 56 days 27.
If Shut Down At End of Report Period, Estimated Date of Startup:
28.
Units -In Test Status (Prior to Conunercial Operation):
2 Forecast Achieved
-lNITIAL CRITICALITY 3/04/85 INITIAL. EI.ECTRICITT 3/18/85 COMMERCIAL OPERATION 9[24[85_
W310204B
.. - ~._..,-.-.
t j
f r
f i
I AVERAGE DAllv UNIT POWER LEVEL i
DOCKET NO. 50-382 UNIThATE(FORD 3 DATE Al'R11 1992 f
3 COMPLETED BY PATRICK CENTOLANZ1 TI:11P110NE 504-739-6683 MONTli MARCil, 1992
{
DAY AVERAGE DAILY POWER IIVEL DAY AVERAGE DAILY POWER LEVEL-(HVe-Net)
(MWe-Net) 1 1093 17 1091~~~
l 2
1093 18 1091
-i 3
1093 19 1090
{
4 1093 20 1090 l
5 1091 21 1091 6
_1043-22 1091 I
7 1094 23
,.1091
{
8 1093 24 1091 9
1093 25 188 10 1093 26.
-42 11 1092 27
-43 i
12
-1093 28 909 _
13 1093 29 1088 14 1092 30 1089 i
15 1093 31 1091 16 1092 I
i j.
INSTRUCTIONS i
j On this format, list the average daily unit power level in MWe-Net for each i
day in the reporting month. Compute to the nearest whole megawatt.
1 W310204H
.-:._.. 2._a..;___..,____.._.-.____.__.__._..___._.__.,, _. - _ _ _. _.. _ _. _ _, _ _. _ -, _...
j UNIT SHUTDOWNS AND POWER REDUCTIONS i
REPORT FOR MARCH 1992 i
DOCKET NO 50-382
- ^
UNIT NAME VATERFORD 3 DATE APRIL 1992 i
COMPLETED BY PATRICK CEhTOIANZI I
TELEPHONE 504-739-6683 t
I i
Method of Licensee Cause & Corrective f
Duration Shutting Event System Component Action to No.
Date Type (HOURS)
REASON 2 l'
Down Reactor 3 Report i Code
- Code Prevent Recurrence 5
92-02 920325 F
66.6 A
1 92-002 IP SMV Outage to repaar leakage 'on Post Accident Sampling i
System Vah..
4 i-i
?
t i
1 2
3 I
F:
Forced Reason:
Method t
S: Scheduled A-Epipment Failure (Explain) 1-Manual f
i B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
[
D-Regulatory Restriction 4-Continuation 4
i E-Operator Training &
5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5
l F-Administrative IEEE Std. 803A-1983 i
G-Operational Error (Explain)
H-Other (Explain) i i
i l
i l
W310204B i
- -