ML20101A005

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1992 for Waterford 3 Steam Electric Station
ML20101A005
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/1992
From: Burski R, Killona L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0142, W3F1-92-142, NUDOCS 9204170196
Download: ML20101A005 (7)


Text

.- -

O c~ # E N T E R G Y

n. r, oura s W31'l 014 2 A1.05 QA April 15, 1992 U.S. Nuclear llegulatory Com:nission ATTN: Document Control Desh Washington, D.C. 20555 Subject :

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating fleport r

Gentlemen:

Attached is the subject monthly report which covers the operating statistles for the month of Macch,1992. This report is submitted per Section G.9.1.0 of the Waterford 3 Technical Specifications for Fuellity Operating I.leense No. NPF-36.

Very truly yours, r

f e)..;2, yw ~

Q.

)?

v ItFit /TJG/ ssf Attachment ec:

It.D. Martin, NitC llegion IV t

D.L. Wigginton, NitC-Nillt 11.11. McGehee N.3. Iteynolds F. Yost (IJtility Data Institute, ine. )

J.T. Whtelock (INPO llecords Center)

NRC Itesident inspectors Office I

L l

4 9204170196 920331 DR ADOCK 05000392

/

1 PDR L

I '

NRC MONTilLY Ol'LRATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 MARCll 1992 The unit operated at an average reactor power of 90.5% and experienced one forced maintenance outage during the period.

4 W310204B

__.m-_____.__._..

4 P

a e

L i

PRESSURIZER SAFETY VALVE P

FAILURES AND CllA1.LENGES KATERFORD 3 i

During the rnonth of March 1992, there were no pressurizer saiety valve failures or challenges.

l 2

+

f' 5

1 t

I t

h-4 p

4 W310204B

.J.-.

,,_,.-,..-...__,,,.-,...~....,.~,c....

OPERATING DATA REPORT i

UNIT NAME: WATERI'ORD 3 CITY / STATE. KILLONA/LA DATE: APRll, 1992_

t OPERATING STAT.U.S i

t

1. Docket: 50-382 Not_es
2. Reporting Period: [iAh;Cll, 1992

[

t

3. Utility

Contact:

PATRICK CENT 01ANZ1 t

Phone Number:

(504) 739-6683

4. Licensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross tlwe): 1200 t
6. Design Electrical Rating (Net MWe): J_104

{

7. Maximum Dependable Capacity (Gross !!We): _

{

1120 S. Maximum Dependable Capacity (Net MW): 107)

9. If Changes occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, i

Give Reasons:

10.

Power Level To Which Restricted, if Any (Net MWe):

NONE 11.

Reasons for Restrictions, If Any: N/A i

l This Month Yr.-to-Date Cumulative 12, llours In Reporting Period 744.0 2d84.0 57,145.0 13.

Number Of Hours Reactor Was Critical

. _ 682.7 IJ25.5 47,011.9 14.

Reactor Rene.rve Shutdown llours _ __

15 llours Generator on-Line 677.4

_., 1,_914.2 46d95.0 16.

Unit Reserve Shutdown Hours

_ _ i 4

- W3102048

-=---..m w.---

%_.-,,wvm...

,wr-

,m,,--w m.,.-w.%,.ve..-.=w,

,4#4,w.~---.w.-,

ewe,.,-w,--m.,,--..%m,v.w,,.*,,,,

--rw<-ww-'---

vv-m'-

,- ~-

_. _ _ ~

I OPERATING DATA REl'0HT (Continued)

This Month Y.-to-Date Cumulative 17.

Gross Thermal Energy j i.'.84,044 6.t45h807 152,000,282 i

Generated (MVii) 18.

Gross Electrical Energy 765J40

_ 2 165,710 51,037,130_

1 Generated (MkH) 19.

Net Electrical Energy 731,774

_2,071,069_

48 % 52_9 1

Generated (MkH) 20.

Unit Service factor 91.0 87.6 8.1_. 0 I

21.

Unit Availabilfty Factor

_91.0 8_7.6 81_.0 t

22.

Unit. Capacity Factor 91.5 88.2_

79.1 (Using MDC Net) i

- 23.

Unit Capacity Factor 89.1 85.9 77.1 i

(Using DER Net) 24.

Unit Forced Outage Rate 9.0 3.4 4.2 25.

Unit Forced Outage llours 66.6 66.6 2,051.4 26.

Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each):

Refueling, 9/19/921 56 days 27.

If Shut Down At End of Report Period, Estimated Date of Startup:

28.

Units -In Test Status (Prior to Conunercial Operation):

2 Forecast Achieved

-lNITIAL CRITICALITY 3/04/85 INITIAL. EI.ECTRICITT 3/18/85 COMMERCIAL OPERATION 9[24[85_

W310204B

.. - ~._..,-.-.

t j

f r

f i

I AVERAGE DAllv UNIT POWER LEVEL i

DOCKET NO. 50-382 UNIThATE(FORD 3 DATE Al'R11 1992 f

3 COMPLETED BY PATRICK CENTOLANZ1 TI:11P110NE 504-739-6683 MONTli MARCil, 1992

{

DAY AVERAGE DAILY POWER IIVEL DAY AVERAGE DAILY POWER LEVEL-(HVe-Net)

(MWe-Net) 1 1093 17 1091~~~

l 2

1093 18 1091

-i 3

1093 19 1090

{

4 1093 20 1090 l

5 1091 21 1091 6

_1043-22 1091 I

7 1094 23

,.1091

{

8 1093 24 1091 9

1093 25 188 10 1093 26.

-42 11 1092 27

-43 i

12

-1093 28 909 _

13 1093 29 1088 14 1092 30 1089 i

15 1093 31 1091 16 1092 I

i j.

INSTRUCTIONS i

j On this format, list the average daily unit power level in MWe-Net for each i

day in the reporting month. Compute to the nearest whole megawatt.

1 W310204H

.-:._.. 2._a..;___..,____.._.-.____.__.__._..___._.__.,, _. - _ _ _. _.. _ _. _ _, _ _. _ -, _...

j UNIT SHUTDOWNS AND POWER REDUCTIONS i

REPORT FOR MARCH 1992 i

DOCKET NO 50-382

- ^

UNIT NAME VATERFORD 3 DATE APRIL 1992 i

COMPLETED BY PATRICK CEhTOIANZI I

TELEPHONE 504-739-6683 t

I i

Method of Licensee Cause & Corrective f

Duration Shutting Event System Component Action to No.

Date Type (HOURS)

REASON 2 l'

Down Reactor 3 Report i Code

  • Code Prevent Recurrence 5

92-02 920325 F

66.6 A

1 92-002 IP SMV Outage to repaar leakage 'on Post Accident Sampling i

System Vah..

4 i-i

?

t i

1 2

3 I

F:

Forced Reason:

Method t

S: Scheduled A-Epipment Failure (Explain) 1-Manual f

i B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

[

D-Regulatory Restriction 4-Continuation 4

i E-Operator Training &

5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5

l F-Administrative IEEE Std. 803A-1983 i

G-Operational Error (Explain)

H-Other (Explain) i i

i l

i l

W310204B i

- -