ML20100R610
| ML20100R610 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/31/1992 |
| From: | Baron R, Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9204160324 | |
| Download: ML20100R610 (13) | |
Text
64-
==
e A
1 Terressee VaDey AJPsay 6,10"c< 6cm 2000 Decatar. Alabamp 35 49 APR 1319R U.S. Nucitar Regulatory Commission ATTH: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATINC REPORT FOR THE MONTH OF MARCH 1992 In accornance with the_reqairementr of the BFN Technical. Specifications section 5.9.1.3, the Monthly Opecscing-Report for the month of March 1992 is provided in Enclosure 1.
If you have any questions, please telephone me_at (205) 729-7566.
Sincerely,
/ ttt R. R. Baron, Menager of Site Licensing Enclosures cc: See page 2-
,P L
1000ta t
--. 1 0 4 1 6 0 3 2 4~ 9 2 0 3 3 1
\\
.kDR ADOCK0500g7
_\\ \\
R
.,s 2
U.S. Pnclear Regulatory Commisalon AE.R13ISR Enclosures cc (Enclosures):
INPO Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30389 s
Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Prederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects 1-II Office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.
20555 Mr. Ted Martson, Director Electric Power Research Institute P.0 Box 10412
/
Palo Alto, California 94304 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II Regulatory Commissien 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident. Inspector Browns ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr. Fred Yost, Director of Research Services, Utility Data Institute, 1700 K Street, NW, Suite 400 Washington, D.C.
20006 P
MONT11Y OPERATING REPORT BROWNS FERRY PUCLEAR PLANT TENNESSEE VALLEY AUTHORITY MARCH 1992 DOCKET NUMBERS 50-259, 50-260, AND 50-296 LICENSE NUMBERS DPR -33, DPR-52, AND DPR-68 4
/
1
4 I
- i. 4 RATIONAL SU19tARY FEBRUARY 1992 UNIT 1 Unit remaine on administrative hold to resolve various TVA and NRC concerns.
' o UNIT 2 Unit 2 generated 754,930 MWHa (gross) electrical power and was on line 97 :ercent of the reporting period.
bMIT 3 Unit remains on administrative hold to resolve various TVA and NRC concerns.
e W
u i
AVERAGE DAILY UNIT PCWER LEVEL i
DOCKET NO.
50-259 Unit One PREPARED BY S. A.
Ratliff TELEPHONE (205) 729-2937 MONTH MARCH 1992 DAY AVERAGE DAILY P0h2R LEVEL DAY AVERAGE DAILY POWER LEVEL (Kde-Net)
(Edd Net) 1 0
17 0
2
,0 18 0
3 0
19 0
4 0
20 0
5 0
21' O
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
25 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
PLLIC207/449/8 i
__,x_a_,_,_-----
-.w-,-a--------a2--
l AVERAGE DAILY UNIT POWER IEVEL DOCKET NO.
50-260 Unit Two PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 MONTH MARCH 1992 DAY AVERAGE DAILY POUER LEVEL DAY AVE' RAGE DAILY POWER LEVEL (MWe-Net)
(MVe-Net) 1 0
17 890 2
366 18 966 3
755 19 1090 4
830 20 1091 5
993 21 1081 6
1069 22 1090 7
1040 23 1091 8
1089 24 1092' 9
1021 25 1090 10 1010 26 1056 11 1091 27 1089 12 1089 28 1074 13 1087 29 10*9 14 1089 30 1095 15 1086 31 1092 16 1092 NOTE: Net generation values are based on manual readings from an integrating watt hour meter. Small differences in the time of day of minual recording may cause the values to vary alightly.
PLLIC207/449/9 e
o
l AVERAGE DAILY UNIT-POWER LEVEL
. DOCKET NO, 50-296 UNIT _;
,_,Ihr,q a PREPARED BY S.-A.
Rutliff TELEPHONE L105) 729-2937 MONTH MARCH 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)_
(MWe-Net) 1 0
-17 0
2 0
18 0
3 0
19 -
0 4
0 20 0
/
S 0
21
-0 0
22.
0 7
0 23 0
8 0
24 0
9 0
25 10 0
26 0
~ '
11 0
27
'O' 4
-e 12 0
28 0
13' O
2'9 -
0 14 0
30-
-O' 15 0
31-0 16
-0 PLLIC207/449/10 v
f
)
OPERATING DATA REPORT DOCKET NO.
50-259 PREPARED BY S. A. Ratliff TELEPHONE (205) 729-2937 OPERATING STATUS Notes 1.
Unit Name:
Browns Ferry Unit One 2.
Reporting Period:
MAECH 1992 3.
Licensed Thermal Power (MWt): 3293 4.
Nameplate Rating (Gross M'Je):
1152 5.
Design Electrical Rating (Net MWe):
1065 6.
Maximum Dependable Capacity (Gross MWe):
1098.4 7.
Maximum Dependable Capacity (Net MWe):
1965 If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last R' port, Give Reasons.
8.
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-D4I2 Cumulative
- 11. Hours in Reporting Period 744 2184 154928
- 12. Number of. Hours Reactor Was Critical 0
0 595II 0
0 6997
- 13. Reactor Reserve Shutdown Hours 0
58267
- 14. Hours Generator On-Line 0
~15. Unit reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
168066787
- 17. Gross Electrical Energy Generated (MfH) 0 0
55398130
- 18. Net Electrical Energy Generated (MWH}
-1437
-5974 53529516
- 19. Unit Service Factor 0
0 37.6
- 20. Unit Availability Factcr 0
0 57.6
- 21. Unit Capacity Factor (Using MDC Net) 0 0
32.4
- 22. Unit Capacity Factor (Using DER Net) 0 0
32.4
- 23. Unit Forced Outage Rate 100 100 57.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i N /A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: To be determined e
'C207/449/ll ggy
?@:
OPE 2ATING DATA REPORT DOCKET NO.
50-260 PREPARED BY S A Ratliff TELEPHONE Ms29-2937
' OPERATING STATUS Kotes 1.
Unit Name:
Browns Ferry Unit Two-2.
Reporting Period:
MARCH 1992 3.
Licensed Thermal Power (MWt):
3293 Neseplate Rating (Gross MWe):
1152 5.
Design Electrical Rating (Net MWe): _J065 6.
Maximum Deperdable Capacity (Cross MWe):
1098.4 7.
Maximum Dependable Capacity (Net MWe): 1065 If Changes Occur in Cavacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
8.
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): -
h/A
[
- 10. Reasons For Restrictiem*, If Any:
N/A This Month Yr-to-Date Cumulative f
l
- 11. Hours in Reporting Period 744.0
-2184.0 149815 l
- 12. Number of Hours Reactor Was Critical 744.0 2027.7 62534 0
0 14200
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 718.9 1980.8 60448 0
0 0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2227009.8 6232776.3 171308632
- 17. Gross Electrical Energy Generated (ITJH) 754930.0 2125300.0 56795108
- 18. Net Electrical Energy Generated (MWH) 736097.0 2072898.0 541183157 l
96.6-90.7 40,2_
l
- 19. Unit Service Factor 96.6 90.7 40.3
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 92 9 89.1 34.4
- 22. Unit Capacity Factor (Using DER Net) 92.9
'89.1 34.4 0
0 52.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6; Months (Type, Date, and Duration of Each):
__J3/A
- 25. If Shut Down At End Of Report ' Period, Estimated Date of Startur:
N/A PLLIC207/449/12
OPERATING DATA REPORT DOCKET NO.
JC ;96
~
iTT-PREPARED BY
- 5. A. Rat)17TT TELEPHONE (205) 729-OPERATING _ STATUS Notes 1.
Unit Name:
Browns Ferry Unit Three 2.
Reporting Period:
MARCH 1992 3.
Licensed Thermal Power (MWt' _3293 4.
Nameplate Rating (Gross MWe):
1152 5.
Design Electrical Rating (Net MWe):
1065 6.
Maximum Dependable Capacity (Gross MWe):
1098.4 7.
Maximum Dependable Capacity (Net MWe):
IG65 If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
8.
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Rectrictions, If Any:
__M/A l
i This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 2184 2__
132240
- 12. Number of Hours Reactor Was Critical 0
0 45306 0
0 5150 l
- 13. Reactor Reserve Shutdown Hours l
- 14. Hours Generator On-Line 0
0 44195
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
131864267
- 17. Gross Electrical Energy Generated (MWH) 0 0
43473760
- 18. Net Electrical Energy. Generated (MWH)
-1833.0
-5114.0 41947695 0
0 33.4
- 19. Unit Service Factor 0
0 33.4
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 3 0
29.8
- 22. Unit Capacity Factor (Using DLd Net) 0 0
_29.8
- 23. Unit Forced Outage Rate 100.0 100.0 61.7__
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/s.
9
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: To be determined PLLIC207/449/13
-i
m c.
3_
DC1KET NO:
50-259 UNIT SHUTDOWNS AND POWER REDUCTI0liS UNZT NAME:
One PREPARED BY:5. A. Ratliff REPORT MONTH:
MARCH 1992 TELEPHONE:(205) 729 2937 l
l l
l j
j Me b of l Licensee l
l l
Cause and Corrective l l
l j
jDurationj lShuttingDown l Event l System l Component [
Action to l
l 2
3 d
5 lNo.
l Date l Type l(Hours) l Reason lkeactor lReportNo. l Code l Code l
Prevent Recurrence l
l 1
l l
l I
I I
i l
l 1
I i
l i
l i
i I
I l315 l06/01/85 l F
l 744 l
F l
4 l
l l
lAdministrativeholdto l l
l l
l l
l l
l l
l resolve various TVA afed l l
l l
l
[
l l
l l
lNRCconcerns.
l l
I l
l l
I I
I I
I l
l l
l l
l l
i i
l I
I l
l l
.I I
I I
I I
I l
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i l
l l
l 1
1 I
I I
I i
i l
I I
i l
i I
I I
I I
i 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i I
I i
l I
I I
i l
l I
I I
I I
I I
I I
I l
1 l
l l
1 I
I I
i 1
1 I
i i
l I
i l
l I
i l
i
(
l i
I I
I I
I I
I I
I I
I I
I I
I I
l l
[
l l
I i
l 1
I I
I i
i l
l l
l l
1 l
l 1
[
2 3
4 I: Forced Reason:
Method:
Exhibit G-Instructions F
S: Scheduled A-Equipment. Failure (Esplain) 1-Manual for Preparation of Data B-Maintenar.re or lest 2-Manuai 3 Cram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing O ^. age (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other Stzhibit I Same Source G-Operational Error (Explain)
H4ther (Explain)
PLLIC207/449/14 7..
DOCKET NO:
50-260 UNIT SHUTDOWNS AND POWER REDUCTIONS CIT NAME:
Two COMPLETED BY:S. A. RatH ff REPORT MONTH:
MARCH 1992 TELEPHONE:(205) 729-2937 l
l l
l l
l Method of l Licensee l
l l
Cause and Corrective l l
-[
l l Duration l lShuttingDown l Event l System l Component l Action to l
l 2
3 4
5 lNo.
l Date l Type l(Hours) l Reason l Reactor lReportNo. l Code l Code l
Prevent Recurrence l
l l
l l
1 l
l l
l l
l 1
I I
I I
i l
l I
I I
l3 l3/1/92 l 5 l 25.1 l
8 l
4 l
l l
lUnitshutdownto l
l l
l l
l l
l l
l l identify and repair l
l l
l l
l l
l l
l l leakage in the drywell. l l
l l
l l
l l
l l
land to rebalance the l
l l
l l
l l
l l
l l turbine generator.
l l
l 1
1 I
I i
l l
I I
l4 l3/17/92 l S l 18.1 l
B l
5-l l
l lPowerreductionto7C%
l l
l l
l l
l.
l l
l jforplannedleak l
l l
l l
l l
l l
l l inspections and repairs l l
l l
l l
l l
l l
ltocorrectexcessive l
l l
l l
l l
l l
l joff-gassystem l
l l
1 1
I I
I I
I linleaka98-1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i l
I i
l i
l l
I I
I I
I I
I I
I i
I i
l i
i i
I
'1 I
i l
l I
i 1
I I
I I
I I
l l
I l
l l
l l
l l
2 3
4 I: Forced Peason:
Method:
Exhibit G-Instructions F
S: $<.hedul ed A-Equipenent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) Flie D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Administrative 9-Othe r 5
G-Operational Error (Explain).
Exhibit I-Same Source H-Other (Explain?
PLLIC207/449/15
'S DCCKET NO:
50-2 %
UNIT SHUTDOWNS AND POWER REbuCTIONS UNIT NAME:
Three i
COMPLETED SY:5. A. Ratliff_
REPORT MONTH:
MARCH 1992 TELEPHONE:(205) 729-2937 l
l' l
l l
l Method of l Licensee l.
l l
Cause and Corrective 1
-lNo.
' l l
l Duration l lShuttingDowr. l Event j' System l Component l Action to l
l I
2 3
6 l Jate l Type l (Hours).l Rea.,e ' l Reactor
.lReportNo. l Code #
l Code l
Prevent Recurrence l
l l
l' l
I I
I I
l
'l l
l-
'l~
I I
I I
l-1 I
i
.i l157 l03/03/65 - ]
'F l 744 l-
.F l
4 l
l l
l Administrative hold to l
4 t
.l l
l l
l l
l l
-l l resolve various TVA and l 1-1 I
1 I
I I
I I-INRCconcerns.
l j
I I
l i
I I
I I
I
-1 I
I
. I I
I I
I I
I I
i 1.
I I
l' I
l I l
i I
I i
'l I
i
-l -
1 I
I i
I i
I
' I I
i l
I l-l i
I I
e i
I l
l I
I I
l i
l I
I i
1 I
I l
i I
I I
I
[
l l
I l
't.
I I
l-1 I
i I
i l
I l'
I I
i l
l l-I
- I I
l-I l
l' I
l-L.
l l-l l-
'l I
'l 1
I 1
i I
i I
.I I
I I
I I
l-t I
I I
.1-l l
I i
i I
I J
l 1.
I' il 1:
I
.I
'l:
1 1
1 I
I IL i
1.
I l-l-
1 l
I l
I I
1 1
-l I
.I I
I l'
I I
l-I l
i i
I I
_l l-l l-l' l'
I _,
I
'l I
l 1
_l I: Forced Reason:
Method:
' Exhibit G-Instructions 2
3 F
[
S: Scheduled
. A-Equipment Failure '(Explain).
1-Manual for Preparation of Data B-Maintenance or Test
'2-Manual' $4. ram ;
Entry sheets for Licenses
[
C-Refueling' 3-AutomaticScram
' Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage.
' (NUliEG-061) i E-Operator Training and License' Examination '
5-Reduction 4
'F-Administrative.
'9-Other S
I' G-Operational Error (Emplain)-
Enhibit I-Same Source f
. H-Other (Explain) e i
l
- PLLIC207/449/16 1
o S
+ -
m o.
m
.