Forwards Rev 28 to Issue 4 of BVPS Physical Security Plan. Changes Submitted Utilize Criteria Described in GL 95-08. Encl Withheld
ML20100R264
Person / Time
Site: Beaver Valley
Issue date: 03/04/1996
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-95-08, GL-95-8, NUDOCS 9603120333
Download: ML20100R264 (2)


Text

SAFEGUARDS INFORMATION gd Beaver Valley Power Station Shippingport. PA 15077 0004 0 n P esident Fax ( 2 6 Nuclear Power Diviskan March 4, 1996 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 BVPS Physical Security Plan (PSP)

Enclosed is Revision 28 to Issue 4 of the Beaver Valley Power Station (BVPS) l Physical Security Plan (PSP)(Base Plan). These changes are being submitted utilizing the criteria described in NRC Generic Letter 95-08. Revision 28 changes include the following:

1. Revised the " Introduction" to the Base Plan to outline the recent changes to the perceived design basis threat of" Radiological Sabotage." This reflects the current l language and issues listed in 10 CFR 73.1(a). (Plan changes made to fully l implement 10 CFR 73.55(c) will be included in a subsequent PSP revision to be submitted within 60 days.)
2. Minor corrections were made to the Physical Security Plan wording regarding implementation of 10 CFR 50.54(x) and (y).
3. Deleted a redundant listing of the minimum manning for the Response Force.

Minimum manning levels are unchanged; only the duplicate listing of information was eliminated.

l

4. Deleted a requirement to organize the security force into three shifts. Shifts may be i assigned as needed to support Security Operations. l
5. Deleted a brief (and redundant) description of the minimum quali6 cations for security force personnel from the Base Plan. A comprehensive description of the minimum qualifications for security force personnel is contained within the Training & Quali0 cations Plan (TQP) of the Physical Security Plan. N 1 IlftlVERING 9603120333 960304 ENCL.0SURES Cont AlN S AFECU ARDS ADOCK 0500 4 INFORWI ATION, UPON SEP AR ATION [g[ggy gDR '

THIS P ACE IS DECONTROLLEn y{g SAFEGUARDS INFORMATION / gf.

SAFEGUARDS INFORMA fl0N Beavet Valley Power Station, Unit No. I and No. 2 BVPS Physical Security Plan (PSP)

Page 2 1

6. Minor administrative and/or editorial changes of a non-intent nature were made to I the Base Plan.

These changes have been reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being I submitted in accordance with 10 CFR 50.54(p)(2). 1 The enclosed materials are considered proprietary under the provision of 10 CFR 2.790(d), and Safeguards Information under the provisions of 10 CFR 73.21, and are thereby exempt from public disclosure.

1 If you have any questions concerning this matter, please contact Mr. Michael l Johnston at (412) 393-7812. l Sincerely, Sushil C. Jain Enclosure c: Addressee (4 copies of enclosure)

Mr. L. W. Rossbach, Sr. Resident Inspector (w/o enclosure)

Mr. T. T. Martin, NRC Region I Administrator (2 copies)

Mr. D. S. Brinkman, Sr. Project Manager (w/o enclosure)