ML20100Q219
| ML20100Q219 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/31/1984 |
| From: | Mcdonald R, Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8412170045 | |
| Download: ML20100Q219 (6) | |
Text
.s
- .o',.
z
-JOSEPH H. FARLEY NUCLEAR P1. ANT WIT 2 NARRATIVE
SUMMARY
OF OPERATIONS
_]
OCTOBER
.i During the month of October, there was one (1) automatic shutdown which-j occurred on October 26, 1984.
1 The following trajor safety-related niaintenance was performed in the I
month of October:
1 1.
Performed miscellaneous corrective and preventive maintenance j
on diesel generators.
I a
W i
t 0
v 1
8412170045 841031 PDR ADOCK 05000364 PDR R
V 12/10 11:49 7207327
- 04
e OPERATING DATA REPORT V
DOCKIT NO. 50-364 DATE 11-6-84 i
COMPLETED BY J.D. Woodard j TELEPHONE (2051 899-5156; OPERATING STATUS A
V
!. Unit Name:
J seph M.
Farley - Unit 2 NW"
~
- 2. Reponing Period: October, 1984 (i) Ctirnulative data since
- 3. Licensed Thermal Power (MWt):
9"?
7-30-81, date of
- 4. Nameplate Rating (Gross MWe):
96n c mincrcial peratico.
]
- 5. Design Electrical Rating (Net MWe):
829
)
- 6. Maxirnum Dependable Capacity (Gross MWe):
852.5 809.1
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rsport. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
WA
- 10. Recons For Restrictions. If Any:
N/A s
1 This Mo' nth Yr..to.Date Cumulative y
745 7320 28,561
!!. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 736.0 6026.n 25.469.6
- 13. Reactor Reserve Shutdowi. Flours 0.0
_0.0 iu.o
- 14. Hours Generator On.Line 720.0 6842.5 75.141.1
- 15. Unit Reserse Shutdown Hours U0 0.0 0.0
- 16. Cross ThermeJ Energy Generated (MWH) 1.811.6a7 17 Ru.46n 63.174,3(i4
- 17. Gross Electrical Energy Genersted (MWH) 5R2.322 5.755.150 20,742.026
- 18. Net Electncal Energy Generated (MWH) 553,012 5,472,282 19.672.308
- 19. Unit Semce Factor 96.b 93.5 e6.0
- 20. Unit Availability Factor u6.6 93 5 88,0
- 21. Unit Capacity Factor (Using MDC Neil 01_. _7 0 2. t.
65,!
84 5 90.?
o,_i
- 22. Unit Capacity Factor (Ustng DER Net)
- 23. Umt Forced Outage Rare
.$. 4 6.3 r,,7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Esch).
Ref ueling/ maintenance ottt aca. 1/ 4 / R '>. arPro & atelv 5% ret b,
- 25. If Shut Down At End Of Report Period. Estimsied Date of Startup-
- 26. Units in Test Status (Pnor to Commercial Operationn Fcrreas
.4 chic $ed INITIA L CRITIC A LITY 05-V-91 0,-os_sj V
INITIA L ELECTRICITY 05-/4-81 05-25-61 COMMERCIAL. OPER A TION ub-01-sl 07-39-bl pr-,
12/10 11:50 720732.'
206
.g
(
(
(
UNIT SilUlDOWNS ANf1 POWER REIMICDONS DOCKETHO. 50-364 UNITNAllE 3.M.Farlev^~Unih DATE 11-6-84 DW
_T _ n. Woodard MFIT)HT MON'Hf _0c t nher _ 1984 TELEPIIONE. (705) Ro9-sis 6 ro N
4 s. 3 5
o c
c.
2E g
s 's Licensec E-s, gg ca,sg a c
,,,,jy,
y N.a.
Date B.
E2
.2 s &
Evenis
- r. Y a3 Atei.. so
~
g$ 5 5
j#3
- d u
F us
-g Repene s p,p,,,g,,,,,,,,,
j o
6
~
007 R41026 F
25.0 C
3 84-012-00 N/A N/A Reactor trip due to iniproper performance of surveillance test.
The individual-involved has been counseled and the surveillance test procedure has been enhanced to prevent recurrence.
~
%8 ro o
5
.3 1,.
r.;
^37
.3 O
'I oss t
1 3
4 t' : I seJ Heas.wn:
McIliod:
Exlvbis G-Insesucsions S. Siledi.lc4 A l'quipuiens Liluie(Enlain) i 41anual f.w Psepasatiiniispaea 11 Mainstenante i,iTess 2 ManualScrain.
Emesy Sheets l'or licasee C lie (. cts.ig
- 3. Asitinnasic Scraen.
Event Reyins (1.ER)fileINUREG.
D lleg.ilas. y itesisketu1:
40slees (Emplane) 0161) t Opc.ai.a le ining & I sten.c l'saniinass.en I-AJannisa..iive 5
G O se.si..o.1 Lniesil allain) i thhsbit I - Sanse S.nerec 08/lJ)
Il 4 ;ece (l eil in3
,~ -
,,.v
.-, m.w
DOCXET NO.
50-364
'e UNIT 2
y DATE 11-6-84 J.D. Wo dard COMPLETED BY ELEPHONE (205) 899-5156
~
t t,
l Oct. ber,1984 MONTil
?
DAY AVERACE DAILY POWER LEVEL DAY' YERACE DAILY POWER LEVEL (MWe Net)
(MWe Net) 7%
828 g,
g7 639 2
831 13 827 3
g9 g3n 4
__ 830
- g giv 823 5
21 8I4 815 6
775 8'
1 13 756 gig g
3 720 V 9 3
_8?n 304 10 16 839 it
- 7 81 818 390 g;
3 805 13 817
- 9 OI3 14 30 817 652 15 3
818 16 C G UC.ONS Cm iftis form::. list the aver:g: daiy vmt pu-e:Icvet in Mwe Net for tsch c:y m the reporung munin Compute to
, the nurc:t whole rrc;: wait.
(9/77) v 12/10 11:49 720?327
- 05
ummvt. coin, t...; e.O r.av =, Compan, s3: ew, ur si,ce:
" Peu OH.ct, Box 2641 s.we}per m. Al m 2ma 3S m 1ecpnone205 782 607.-
3 a
A. P. Mcdonald v
s.; - va c.e oe-r~rv.m ou.4 Alubumapager v
November 9, 1984 l
Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Op_erating Data Report Attached are two (2) copies of the October 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, reouired by Section 6.9.1.10 of Appendix A of the Technical Specifications.
As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated netoher 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached y
report.
If you have any questions, please advise.
Yours very nily,
9 ;)
R. ? /? vJ'
,! V.
R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies)
Director, RIl (1 copy)
,eq);%,#)s#p)$$
/
cp,y,a M3 J
p v
9 f\\
12/10 11:48 7207327
- 02 l
o
bc:
Mr. J. M. Farity Mr. W. O. Whitt 4-Mr. R. P. Mcdonald
(
Mr. H. O. Thrash V
Mr. W. G. Hairston, III Mr. L. S. Williams J
. Mr. J. D. Woodard Mr. A. E. Hammett Mr. M. L. Stoltz n
Ms. S. N. Knight Mr. J. M. Elliott Mr. J. R. Crane Mr. B. E. Hunt Mr. L. B. Long Mr. N. M. Horsley Ms. Sylvia Schoel i
Mr. J. C. Miller Mr. Jim Brantley Mr. Mike Galle INPO Records Center ANI Library File:
Bir. der Copy A-2.1 v
v "sd 12/10 11:48 7207327
- 03
- / /