Text
h,[
c J.
/
' Commonwealth Edison V
i
/ one First National Plazi Chicago, lihnois
(
7 7 Address neply to: Post Office Box 767 A,j Chicago, Illinois 60690 April 9, 1985 l
l Mr.-Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
LaSalle County Station Units 1 and 2 Fire. Damper Surveillance Program NRC Docket Nos. 50-373 and 50-374 References (a): Letter dated March 15, 1984 to H. R.
Denton from C. W. Schroeder.
(b): Safety Evaluation Report Supplement 8, dated March 1984.
(c): Veeting on March 28, 1984 between Commonwealth Edison and NRR Staff.
.(d): Letter. dated August 21, 1984 to H. R.
Denton from B. Rybak.
(e): NPF-18 License Condition 2.C.(15)(h).
Dear Mr. Denton:
This letter is to inform you of Commonwealth Edison's intent to implement the Fire Damper Surveillance Program submitted to you in reference (d). - The visual inspection of fire dampers will continue to be' implemented in accordance with T.S. 4.7.6.1.
A periodic operability test of fire dampers separating redundant safe shutdown equipment and those within the fire barriers of the control room and Auxiliary Electric Equipment Room will be-conducted in accordance with and on the schedule indicated in reference (d).
Commonwealth Edison continues to believe that fire dampers which are initially tested for operability to' verify correct installation can be aintained. operable throughout their lifetime by use of visual inspections -
m alone. However, if fire damper operability tests are to be required, we _
i
- believe this program is superior to other programs now under consideration in support of generic requirements. We. stand ready to meet with your staff on a mutually agreeable schedule to further discuss this matter. We would appreciate the opportunity to present our position to the CRGR at the time such generic discussions are provided by the staff.
?
0*b 8504180072 850409 L
t 8 0 O
PDR ADOCK 05000373 F
PDR(
u
i c
H.~R. Denton- -
April 9, 1985
-Please conside'r this letter as superceding all previous letters
-which committed to fire damper operability testing.
Should you have any further questions regarding this matter,
.please direct them to-this office. One signed original and fifteen copies of this letter are provided for your use.
Very truly yours,
. N. 1 J. G. Marshall Nuclear Licensing Administrator 1m cc:
A. Bournia - NRR NRC Resident Inspector - LSCS V. Stello 'CRGR t
i 9875N I
a
.m i'D
_,_