ML20100M798

From kanterella
Jump to navigation Jump to search
Forwards Draft Copy of Proposed Changes to QA Policy,Per 840923 Visit & 831109 Insp Repts 50-317/83-26 & 50-318/83-26
ML20100M798
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/22/1984
From: Anuje A
BALTIMORE GAS & ELECTRIC CO.
To: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20100M789 List:
References
QAO-K-0779, QAO-K-779, NUDOCS 8412120459
Download: ML20100M798 (21)


Text

--

e l

O l

l May 22, 1984 I

f i

t i

,s I

Mr. Glenn Meyer l

U. S. Nuclear Regulatory Comunission Region _1 f

631 Park Avenue King of Prussia, Pennsylvania 19406 StBJECT:

Proposed Changes to Qh Policy QA File QhG 3.3 5

Our Reft QhO K-0779 s

{

Dear Mr. Meyers Attached is a draft copy of the proposed changes to BGEE's Quality Assurance Policy.

These changes are based on our discussions with you during your i

'}

visit to our office on September 23,1986*andNRCInspectionReportMos. 50-317/83-l 26; 50-318/83-26 dated November 9,1983.

I Please let us know if you have any questions.

i?j, very truly yours, 8412120459 841128 PDR ADOCK 05000317

'A. B. Anuje /

7' P

PDR Supervisor

}I Internal Audits and Programs -

[,

L ABA/bla l*

cc:

(M/O Enclosures)

D. A. Brune, Esq.

fl G. F. Trowbridge, Esq.

li-Messrs. D. H. Jaffee, NRC T. Foley, NRC bec: R. M. Douglass S. M. Davis i!

R. C. L. Olson i

L

PRF-Q No.

550 i

j PROPOSED REVISIcit FOtti FOR A SP g3 To initiate changes in a Procedure used for controlling quality in nuclear V

power plants, the proposer must complete Parts A through F of this form, proceeding I

as in QAP 1, Section 2.8.

I l

A.

Proposed Revision to:

QA Policy Revision 7

i B.

Changer' See attached i

C.

From:

Existing i

D.

To:

See attached E.

Reason for change:

I To clarify exceptions taken in the Policy Statement as requested by the NRC.

sq F.

Proposed D. B. Sikora Department 24-OAD Date 03/15/84 G.

Approved for Emergency use per QAP 1, Section 2.9 Department Date Manager l

This approval expires on (date)

H.

Reviewed Department Date per QAP 1 Technical Reviewer I

I.

Reviewed Department Date per QAP 1 Quality Assurance Reviewer J.

Not Approved

_ Department Date Manager / Reviewer

'r i

Reason:

l l

K. ' Approval by the Manager, Quality Assurance Department, certifies that this document has also been approved by the following Responsible Managers:

i i

i Manaaers of Electric Engineering Electric Test Nuclear Power Production Maintenance Project Management Purchasing and S, ores Quality Assurance Real Estate and Office Services QAP DRAFT REVISION Approved by on Manager, Quality Assurance f

I i

CC 1253 Rev. 9

6k7aSt/A Attachment t3 PRF-Q No. 550 Pcge 2 of 19 QCALITY ADSURAQCE MADUAL Pcg3 y

i F0R Revision # [

JUL 151913 NUCLEAR PONER PLANTS Date l

I f

b i

I 1

t BALTDDRE GAS AND ELECTRIC COMPANY i

pot. ICY f

(SECTION 1B OF THE FINAL SAFETY ANALYSIS REPORT MR WE f

CALVERT CLIFFS NUCLEAR POWER PLANT) 5 4

i i

l 4

f i

e 4

'w I

t i

?

l l :

o r

,-----.c,

-~-

Attachment t3 PRF-Q No. 530 c.

P:ge 3 of 19 I,

TABLE OF CONTENTS Section Page f

'I i-i 18.1 ORuANIZATION 1R-1 t

18.2.

QUALITY ASSURANCE PROGRAM IB-6 18.3 DESIGN CONTROL 1B-11 18.4 PROCUREMENT DOCUMENT CONTROL 1B-13 E

1B.5 INSTRUCTIONS, PROCEDURES, AND DRAWINGS 1B-15

.l 18.6 00CUMENT CONTROL 18-16 I

I B.7 CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND 1B-18 SERVICES l

l I B.S IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND IB-22

{

COMPONENTS I B.9 CONTROL OF SPECIAL PROCESSES 18-23

' (]

1 B.10 INSPECTION 1B-25 l

1B.11 TEST CONTROL IB-26 IB.12 CONTROL OF MEASURING AND TEST. EQUIPMENT 18-27 I B.13 HANDLING, STORAGE, AND SHIPPING 18-29 18.14 INSPECTION, TEST, AND OPERATING STATUS 18-29 4

1 B.15 NONCONFORMING MATERIALS, PARTS, AND COMPONENTS 18-30 t.

1B.16 CORRECTIVE ACTION IB-30

'l IB.17 QUALITY ASSURANCE RECORDS IB-31 IB.13 AUDITS gg_3g f

f

'. N 9

h' g

IR-i f

r Attachment to PRF-Q No. 550

'i--

l-PIga 4 cf 19

. 1 I

4-LIST OF TABLES Table No.

Page I B-1 1-BG&E Position on Guidance Contained in ANSI 1R-33 Standards l

t t

.I i

LIST OF FIGURES I

Figure No.

l-I B-1 Baltimore Gas and Electric Company (BG&E)

Corporate Organization I

t 18-2 BG&E Quality Assurance Department Organization i

l*,'

J t

L

-i

<J' g

i s

i i

h 1

1R-ii 1-t L.

6 7 0 M 7A

,{

Attachment ta PRF-Q No. 550' P:ge 5 cf 19 i-Ij.

i Baltimore Gas and Electric Company Calvert Clif fs Nuclear Power Plant

' i Updated Final Safety Analysis Report Chapter IB -Individual Page Revisions

/-

Page Rev.

Page Rev.

[

No.

No.

No.

No.

I B-1 0

18-31 0

1 B-2 0

IB-32 0

18-3 0

18-33 0

I I B-4 0

I B-34 2

IB-5 0

18-35 0

IB-6 0

18-36 0

1 I B-7 0

1 B-37 0

f IB-S 2

18-38 2

IB-9 0

IB-39 2

1 B-10 0

1B-40 0

l 1B-11 0

18-41 0

IB-12 0

I B-42 0

..I' mi 1B-13 0

1B-43 0

i V'

t 18-14 0

I B-44 0-1B-15 0

18-45 0

18-16 0

I B-46 0

i

(

IB-17 0

18-47 0

IB-18 0

FIB-1 0

1B-19 0

FIB-2 0

f IB-20 0

i 1 B-21 0

5 1 B-22 0

I 18-23 0

[

I B-24 0

1B-25 0

i IB-26 0

I B-27 0

IB-28 0

1B-29 0

g.

IB-30 0

i IB-iii

,e

(Ur&Ut e Attachment t2 PRF-Q No. 550 i

Page 6 of 19 i

.i Safety-related maintenance and repair are performed by plant maintenance personnel 3

1. Q onder the direction of the General Supervisor, Electrical and Controls, Nuclear Power Department, and the General Foreman, Production Maintenance Department according to written Procedures or instructions prepared by the maintenance force and approved as i.

stated in the Quality Assurance Manual for Nuclear Power Plants. These Procedures 1

i 1.

Ensure that quality-related activities, such as inspection and test, are performed with appropriate equipment and under suitable environmental conditions 1

2.

Indicate inspections and checks that must be made and records and data that must

(

be kept LI 3.

Show where independent verifications of inspections or checks should be performed i

by specified personnel other than those performing the work I

When necessary, non-plant Company personnel or outside contractors are brought in to supplement the plant work force. In such instances, the approval of work procedures and the tagging of equipment are coordinated by a member of thevorganization responsible for the performance of the work.

gM Controls are established in the Quality Assurance Manual for Nuclear Power Plants to ensure that materials and parts used in the repair, maintenance, and modification of safety-related portions of the plant are appropriate for the service intended. Written

{

Procedures are prepared for the storage and identification of materials and parts to en-sure that they do not deteriorate in storage and can be correctly identified before installation or use.

h

_}

Equipment manufacturers and contractors used for the repair, maintenance, and modifi-cation of safety-related structures, systems, and components are required to have quality i

assurance programs consistent with the importance of the end-product to safety.

i IB.3 DESIGN CONTROL t-Controi

,l Plant modifications described in the FSAR and considered significant for nuclear safety are controlled by the Quality Assurance Manual for Nuclear Power Plants, which is written to ensure compliance with Regulatory Guide 1.64 and 10 CFR 50.59.

l A1.. rations to the Operating License, including Technical Specifications, the FSAR, and the Emergency Response Plan, are subject to the same controls as are alterations to 1

changes, tests, and experiments defined in 10 CFR 50.59 Controls for changes, tests, and experiments conducted at Calvert Cliffs vary according j.

to the following:

f l>

1.

As the item or activity af fected is or is not described in the FSAR 2.

As the item or activity affected has been classified safety-related or non-safety-related.

L As a safety analysis is or is not required

a l

(

IB-ll lt I-

e,,

Attachment ts PRF-Q No. 550 Page 7 cf 19 i

3.

Design and specification changes are subject to design controls and approvals appli-cable to the original design.

9.

Design documents and revisions thereto are distributed to responsible individuals and controlled to prevent inadvertent use of superseded material.

h 10.

Design errors and deficiencies that adversely affect safety-related structures, systems, and components are documented, and appropriate corrective action is

+

I taken.

l-11.

Design documents and reviews, records, and changes thereto are collected, stored, 3

mamtained, and controlled systematically.

r 12.

Standard off-the-shelf commercial or previously approved materials, parts, and i

equipment essential to the safety-related functions of structures, systems, and com-ponents are reviewed for suitability of application before they are selected.

i 13.

The persons or groups responsible for design reviews and other design verification activities and their authority and responsibilities are identified.

14 Design changes to non-safety-relates items initiated and approved at the plant are controlled to ensure compliance with 10 CFR 50.59.

15.

Processes used to select suitable materials, parts, equipment, and processes for safety-related structures, systems, and components includes the application of per-tinent industry standards and specifications, material and prototype hardware testing programs, and design reviews.

4E n M 6keCA 5 de-6j

( h m p h.s~:.,nse 6.M{ N V)ros ramsel tn,(r$"Ao n.

f.,

xth 6 u Q

Vers

,c PROCtJREMENT DoctJMENT CONTROL 1B.4 Methods of Purchase Controls have been established to specify the sequence of actions to be followed in the -

preparation, review, approval, and control of procurement documents.

The acquisition and purchase of items or 1:rvices by BG&E for the Calvert Cliffs plant are subject to controls that depend on 1.

The classification of each item or service as safety-related or non-safety-related according to controls established by Electric Engineering personnel 2.

The method used for acquisition or purchase Acquisition and purchase of safety-related and non-safety-related items are initiated by I

a store order or requisition. Items classified non-safety-related and some non-safety-related services may be acquired or purchased in the same manner as items or services required for fossil plants, but copies of store orders or requisitions are sent to the Elec-tric Engineering Department or the Quality Assurance Department for verification of the non-safety-related classification.

g h!

r i

1B-13 L

Erait A Att chment to PRF-Q No,550 -

Page 8 of 19 i

l i

Controls for Specification Purchase i g; Controls have been established to ensure that safety-related items or services subject to l

the controls of the Specification Method are obtained only from vendors who have been approved by BG&E Responsible Design Organizations and Ouality Assurance personnel.

l BG&E Responsible Design Organizations ensure that, when applicable, the purchase spec-ification i

I 1.

Centains or references technical requirements for the basis of design, including the applicable regulatory requirements, component and material identification require-ments, drawings, specifications, Codes and industrial standards, test and inspection requirements, and special process instructions for such activities as welding, heat treating, nondestructive testing, and cleaning.

i 1

2.

Identifies applicable requirements of 10 CFR 50, Appendix B, that must be complied with and described in the mpplier's quality assurance program.

l 3.

Requires that major contractors designated as BG&E agents to purchase safety-related items or services must have procurement controls to ensure that they pur-chase or acquire these items or services in compliance with applicable sections of ANSI N45.2.13.

i 4.

Identifies required documentation (i.e., drawings, specifications, procedures, inspec-I tion and fabrication plans, inspection and test records, personnel and procedure qual-ifications, and material chemical and physical test results) to be prepared, main-tained, and submitted, as applicable, to BG&E or the purchaser for review and approval.

5.

Identifies records that must be retained, controlled, maintained, or delivered to BG&E or the purchaser before use of installation of hardware.

l 6.

Specifies BG&E's or the procuring agency's right of access to supplier facilities and records for source inspection and audits.

t ll Assigned quality assurance personnel review procurement specifications to verify the

[.

adequacy of quality requirements therein. This review determines that quality require-ments are correctly stated, inspectable, and controllable; that there are adequate acceptance and rejection criteria; and that these procurement documents have been pre-l' pared, reviewed, and approved in accordance with quality assurance program require-ments. Records of the quality assurance review and approval of procurement documents l'

are made and kept available for verification.

(t Changes made to procurement specifications are subject to the levels of review, approv-

l-al, and audit that were applied in preparing and processing the original documents.

The procurement documents for spare or replacement parts of safety-related structures, systems, and components are subject to controls at least equivalent to those applied for Jed i the original equipment.

s-h:.*':.l.h*y.x.

.- ::m-l' h

  1. fflB.5 INSTRUCTIONS, PROCEDURES, AND ORAWINGS

!l Controls delineate the sequence of actions to be performed in the preparation, review, t,

approval, and control of instructions, procedures, and drawings.

1B-15 t?

2 PRF-Q No. 550 Page 9 of 19 f Controls for Commercial Quality Purchase

- O Controls have been established to ensure that items or services available to the general industry will be suf ficiently controlled to perform their safety-related function.

t BG&E Responsible Design Organizations evaluate and document if an item or service is suitable for the Commerical Quality Method of purchase by evaluating:

4 i

1.

The safety-related function of the item or service.

2.

Critical operating requirements such as temperature, pressure, flow, seismic criteria, structural power supply, cycling, including environmental qualification i

testing as applicable.

q 3.

Applicable National Codes or Standards.

f 4.

Traceability or documentation requirements.

i 5.

Circumstances which reduce the possibility of variation in quality among items such as:

f

)

- tools, equipment, or processes used in the manufacture of the item which reduce the possibility of variations between finished products.

i

- availability of identical or similar items from several suppliers.

- use cf the item in the general industry and length of period used.

/'N

\\)

- use of identical items in non-safety-related applicatiens with similar critical operating or reliability requirements.

The above evaluation is reviewed by the Quality Assurance Department.

f

'I J

?

f a

t t

i u

'r i

sAntu 5,

Attachment ta PRF-Q No. 550 Pego l0 cf 19 l

I' g ' Verification Method e:

.k The following controls have been established for conducting tests or measurements when l

it is not possible to specify controls to be applied during the manufacture of an item:

1.

BG&E Responsible Design Organizations determine and document Critical characteristics that must be controlled to ensure that the item can a.

fulfill its safety-related function.

b.

Tests or measurements required to establish that critical characteristics have been controlled.

i Applicable handling, storage, and shipping requirements.

. c.

t 2.

When tests or measurements are to be conducted by the supplier or another j

organization outside BG&E, the purchase of these services are treated as a Safety-i Related (SR) Specification purchase, and thus subject to all the requirements of SR Specification purchase method.

3.

When tests or measurements are to be conducted by BG&E, Responsible Design Organizations in BG&E shall document the applicable requirements and send the document to the Quality Assurance Department for review of the quality assurance requirements.

LO d

J r '

l I

i

.4 4

e s

l

tM1mc

.t

. Attachment to PRF-Q No. 550 '

Paga 11 of 19 i

4 Receipt h

The Purchasing and Stores Department is responsible for receiving and storing materials, parts, and components.

i Receiving inspection of material, equipment, and services is performed in accordance 2

j with the following:

1.

It is verified that the material, component, or equipment is properly identified and

{

that this identification corresponds with the documentation received.

2.

Unless other procedures are specified in the shipping documents, items are visually inspected to verify that stated packaging and shipping requirements have been main-tained.

3.

Items are inspected upon receipt to verify that procurement requirements have been

~i met.

l l

4.

Procurement records are inspected and judged acceptable in accordance with pre-determined inspection instructions before installation or use of material, compo-nents, or equipment.

Additional inspections or examinations are made if the item was not inspected at the 5.

+-

source.

Documents supplied with received items are reviewed to verify compliance with the C.i requirements of the purchase documents.

Inspection Procedures require that i

1.

Inspection records or certificates of conformance attesting to acceptaSce must be available at the nuclear power plant before material, components, add equipment may be released _for installation or use. Ab>c re r,

~N 7

2.

The inspection status of items accepted and released must be identified before the items are sent to a controlled storage area or released for installation or further j

\\...

work.

J. 4 anAn unacceptable item may be given a " Conditional Release" if it can be made acceptable af ter installation but before the' Con.G+,'aulSystem that contains it i I.

operational. 3*ms re%e). undcr '

Releuc " /*MI U*

thntrolled. IAnder 4he. ADM oyofern -

~;

A written record of the results of receiving inspection and the disposition of received-items is maintained as part of the permanent plant records. All safety-related items issued bear an acceptance tag and have documentation to support their acceptability. If traceability is lost or the documentation review is unsatisfactory, an item becomes sub-iect to the controls established for non-conforming safety-related items.

i Non-conforming items are handled according to documented procedures and, when prac-ticable, are placed in a segregated area to prevent inadvertent installation or use until proper disposition is made.

<-h a

4 s

I 1B-21

osait a Attachment t2 PRF-Q No. 550 Page 12 of 19 j

Producti:n Maint: nance Department

--Mechanical Maintenance

[ Q Cahbration controls require each group to identify measuring and test equipment and calibration test data related to it.

y Written procedures are prepared and implemented to ensure that tools, gauges, instru-1 ments, and related test and measuring devices are of proper accuracy to verify confor-mance to established requirements.

1 Wnufacturer's Procedures are used for calibration when available; otherwise; a Proce-l dure is prepared for each category of measuring and test equipment as necessary. These Calibration Procedures contain the following information:

l.

Identification of the item to be calibrated and its period of calibration I'

2.

Standards to be used, specific test-points, and checks, tests, and measurements to be made 3.

Acceptance criteria to be used and special precautions to be taken when necessary.

i Measuring and test equipment that requires calibration is assigned an identifying serial number. Instruments are calibrated at specified intervals according to the required accuracy, purpose, degree of usage, stability characteristics, and other conditions that af fect the measurement.

l b n + k. d u f e r 1 5.> r'

('cofanbrY: bor~ dhi Cffined When particular equipment is found out of calibration, an evaluation is made to deter-3 mine any ef fect on items previously accepted on the basis of using that equipment.

Q

(

t Test and measuring equipment that cannot be adjusted to required tolerances during cali-bration is identified and placed in a designated segregated area; if the equipment can be i

used in limited applications, the limitations are identified.

The status of each item controlled under the calibration system is recorded and main-tained. Equipment is marked or records of calibrations are maintained to indicate cali-bration status. An interval of calibration is established for each item of measuring and test equipment and recorded on a master record of calibrations prepared as a calibration schedule.

Measuring and test equipment is controlled to prevent the use of uncalibrated or defec-tive equipment, the spread of radioactive contamination, the introduction of impurities into high-purity systems, and damage to or loss of equipment. Identification tags are placed on measuring and test equipment to indicate such special conditions as radioactive cleanliness, special limitations, or failure to meet established calibration requirements.

Measuring and test equipment is calibrated and adjusted at specified intervals, or before ow, against certified standards.

Reference and transfer standards are traceable to nationally recognized standards; or, where national standards do not exist, provisions are established to document the basis for calibration.

i 1B-28

.m,,

Attachment ts PRF-Q No. 550 s

Psge 13 of 19 i

provide a comprehensive independent verification and evaluation of quality-related activities and Procedures. Audits ensure the effective and proper implementation of a

BG&E's Quality Assurance Program. They are scheduled on the basis of the importance

(

v to safety of activities being performed.

Supplier audits are performed to evaluate quality assurance programs, procedures, and activities. Audits of major suppliers are made early enough to ensure compliance with all aspects of BG&E's procurement documents.

Additional audits are performed as required to ensure that all requirements of BG&E's Quality Assurance Program are I

properly implemented according to procurement documents.

I Audits of designated activities as required by the Technical Specifications are performed under cognizance of the Of f-Site Safety Review Committee.

f Audits are performed in accordance with pre-established written procedures or checklists by qualified Ouality Assurance personnel who have no direct responsibility for the work being audited.

Technical specialists from other BG&E departments and outside consultants may assist as necessary in performing audits.

Audits include objective

'i evaluation of quality-related practices, procedures, instructions, activities, and items, as well as review of documents and records.

' [M 5 b kt.n' d qualit/q of audits are analyzed and documented.

Report Results that indicate the existence of

$rograms or a lack of effectiveness in the Quality Assurance Program, including the need for re-audit of deficient areas, are reported to the Manager and Supervisor of the audited activity. Controls have been established for verifying that corrective action is taken promptly to correct noted deficiencies.

h To ensure that BC&E's Quality Assurance Department complies with the requirements of

(

BG&E's Quality Assurance Program, an independent management audit of Ouality Assurance Department activities is performed annually by a Joint Utility Management Audit Team.

a f

I e

i 1

18-32 i

s

+

Ltzre.it &

m Attachment to PRF-Q No. 550

+

Pig 214 ef 19 QA Policy (q

j CHANCE:

ANSI N45.7.2 - 1972

)

FROM:

)

Item 3 1

R,esponse t

Personnel of BG&E's Electric Engineering Department will determine 1.

the level of protective measures to be applied to each item, either on an indi-l vidual basis when preparing procurement documents or generically for Catalog, Commercial Quality, etc., Methods of Purchase; 2.

if the packaging and shipping of an item from the supplier should conform to one of the levels described in ANSI N45.2.2, or if the normal packaging and shipping methods used by general industry will provide sufficient protection; 3.

the level of protection to be applied to an item during storage by BG&E per-sonnel after receipt.

Reason u)

BC&E's position is as follows:

. 1 l

1.

For Commercial Quality items, it is not always possible to specify the level of

+

packaging, as most items are purchased after they have been shipped by the j

manufacturer to his local agent, the wholesaler.

2.

It is not always necessary or practical to retain the packaging used for ship-i ment when the item is in storage.

i i

-TO:

Item 3

Response

1.

The level of protective measures defined by Subsection 2.7 are applied to I

Specification purchases.

2.

Personnel of BG&E's Electric Engineering Department will determine the leve!

of protective measures to be applied to Catalog, Commercial Quality, etc.,

Methods of Purchase.

L

Drrit A Attachment to PRF-Q No,550 Page 15 of 19

i Reason (V1.

I' BC&E's position is as follows:

l.

For Catalog and Commercial Quality items, it is not always possible to assign a level of classification in accordance with ANSI N45.2.2, as most items are purchased af ter they have been giackaged by the manufacturer and shipped to his local agent, the wholesaler.

l 2.

Experience has shown that the level of protection assigned to Catalog and Commercial Quality items by Suppliers is adequate.

. i l

CHANGE AS MARKED:

4 Item 4 Requirement Subsection 3.0 specifies detailed requirements for packing items for each level de-i l

fined in Subsection 2.7.

l R_esponse l

BC&E has replaced Section 3.0 with the following:

4}

1.

Packaging for Shipment to BG&E Personnel of BG&E's Electric Engineering Department shall ensure that pro-ig or Specification purchases curement documentsjeither indicate that the normal methods of packaging and shipment used by industry in general are acceptable for the items being procured or specify the level of protection assigned to the item and the re-I quirement that the supplier conform to applicable requirements for items in that classification defined in Regulatory Guide 1.38, Rev. 2 - March 1977.

,i ADD:

2.

The normal methods of packaging used by the industry in general are acceptable for items being procured by Commercial Quality, Catalog, etc.,

j Methods of Purchase.

i l

CHANGE AS MARKED:

8. f.

Packaging for Storage by BG&E

'i for all types of purchases In general the packaging used by the supplier to ship items o BG&E need not i

be retained after the item is received by BG&E, provi d that the item is I_

stored in an area that meets the requirements for a storage area for the level of protection assigned to the item. Special or unique items, however, may require special protective measures. For such unusual items, the Department that initiated the purchase, together with Electric Engineering, shall identify l

if any of the requirements of Section 6.4.2 of ANSI N45.2.2 - 1972 apply.

,i L

Drcf t A Attachment to PRF-Q No. 550 P:ge 16 oi l9 i

'f CHANGE AS MARKED:

j Reason

}!

/.

This substitution will ensure that the item will receive adequate protection during shipment and storage, thus eliminating unnecessary restrictions and enabling BG&E to use commercial sources to the utmost.

I t

ADD:

Experience shows that industrial practices for packaging Commercial Quality and 2.

j Catalog items are adequate for most applications.

1

.j CHANGE AS MARKED:

s item 5 Requirement i

Section 4.0 defines shipping requirements related to the protection levels' assigned to items, i

l

Response

BG&E has replaced Section 4.0 with the following:

i

}_

Shipping to BG&E

/,

BG&E will invoke the requirements for shipping specified in Section 4.0 of 4

n Specification purchases ANSI N45.2.2 - 1972 I

only when Electric Engineering Department personnel have specified in procurement documents that the itern shall be packaged in l

conformance with ANSI N45.2.2, Section 3.0.

ADD:

1 2.

BG&E will not invoke the requirements of ANSI N45.2.2 - 1972, Section 4.0, on 1

Commercial Quality, Catalog, etc., Methods of Purchase.

t CHANGE AS MARKED:

i.

Shipping from BG&E i

J.

Items shipped from BG&E need not conform to any of the requirements of

+

I ANSI N45.2.2, but the organization that packs and handles the item shall provide roughly the same level of protection that the item was given during shipment to BG&E.

t i

Drcit A Attachment to PRF-Q No. 550 Pag 217 of 19 DELETE THE FOLLOWING:

O" Item 8 3

Requirement I

~i Subparagraph 7.4 gives requirements for establishing a regular inspection program for hoisting equipment and rigging, including a method of identifying acceptable items.

[

Resoonse BG&E does not test hoisting equipment and rigging on a regular basis but tests rigging equipment before use; neither does it indicate which items of rigging are accept-able for use.

I Reason It is impractical and unnecessary to establish controls for periodically testing rig-j ging that will be used infrequently and could be tested many times without being used. It is far more practical to inspect or test equipment before use. There will then be no need for a method of indicating acceptable items, and non-acceptable items can be identified i

by a Non-conformance Tag.

i CHANCE:

Q ANSI N45.2.9 - 1976 l

FROM:

Item 2

[

Requirement Subsection 5.6.1, item (1) states that "no pipes other than those providing fire pro-tection to the storage facility are to be located within the facility."

ij

Response

The BG&E storage facility is controlled by the following statement: "no pipes or l

ducts other than those providing fire protection, HVAC, and electricity to the storage j

facility are to be located within the facility."

{

Reason i

j Unless electrical and HVAC penetrations are allowed, the records cannot be prop-crly protected during storage.

i t

i I

TNUnrbu

.g Attachment to PRF-Q No. 550 N*,'

Page 18 of 19 s

T.9 0

iie-2

- R,equirement J,

Subsection 5.6.1 reads as follows, " Design and construction of a single record storage facility shall meet the following criteria:" Items a) and b) of the subsection state r

  • }

that:

"a)

Reinforced concrete, concrete block, masonry, or equal construction."

"b)

A floor and roof with drainage control. If a floor drain is provided, a j

check valve (or equal) shall be included."

l-Response / Reason j;

Itern a i I[

The intent of this requirement is both structural integrity and fire resistance.

.l This vault is entirely enveloped by a structurally sound, fire resistive building.

(

Second, the vault rests on a reinforced slab on grade and its walis extend fully to d

the underside of the structural deck. Third, the walls of the vault are constructed

'j of gypsum wallboard on metal studs per Underwriters Laboratory Test Number U412, assuring the equivalent of 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> fire resistive construction. This is equal construction to concrete block in terms of fire protection.' The walls carry no lj structural load; h nce, they provide equivalent structural integrity to that needed yO of concrete dieck

~ Response / Reason Item b

_(.

f{

Again, the vault is contained within a

[,

such it has no roof, or need for floor drain.g environmentally protected building. As

,iiIi i- }.

f f-l I These responses have been forwarded to the NRC by the BG&E letter dated 02/11/83 from Robert G. Nichols, Sr. Facilities Project Administrator, Real Estate and Office Services Department, to Terry L. Harpster, Chief QA Branch, Division

+,j of QA, Safeguards and inspection Programs, IE, USNRC. These responses have also

g been excepted by the NRC in their letter dated 04/22/83 from Walter P. Haass, Deputy Chief, QA Branch, Division of Quality Assurance, Safeguards,.and e

Inspections Programs, Of fice of Inspection and Enforcement.

33

'I

!I i.

K

![

4

e, Drcit A

,. '..~

Attachment to PRF-Q No. 550

{

)

P ga 19 of 19 i

ADD THE FOLLOWING TO:

ANSI N45.2.23 - 1978 Item 1 2.6 Time exclusively spent for training does not apply as credit toward experience requirements for lead auditors.

I 4

l 4

1 I

i o

e i, O h

[

6 I

I 1

'i l

i i

f I

o I

n-

.i

' Y..

o-EVALIRTION OF PR@OSED GANGE TO THE @ POLICY i

As required by 10 CFR 50.54, PRF-Q No. 550 (@ Policy) has been reviewed to determine if the proposed changes would reduce BG&E's commitments described in the @ Policy (FSAR Section 1B).

PRF-Q No. 550 does not reduce BG&E's commitments described in the @ Poli-cy because:

1.

Referenced changes are clarification of exceptions taken in the Policy Statement (Requested by NRC).

2.

Add a requirement that computer programs used in design are subject to design controls and program verification.

I Evaluation performed by:

' r. n.

bl./ I.

Date: 'k/ '

Evaluation reviewed by:

//

surC-Date: I/

6

  1. A

'i

(<

I i

i r

l-I i

I k

'[

t

.1 i

'h