ML20100M682

From kanterella
Jump to navigation Jump to search
Submits Proposed Operator Licensing Schedule for FY96-99
ML20100M682
Person / Time
Site: Farley  
Issue date: 03/01/1996
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603050473
Download: ML20100M682 (3)


Text

f!

~

Southern Nuct:ar Operating Company Post Offic) Box 1295 VBirmingham, AlabIsna 35201 Telephone (205) 868-5131 Southern Nudear Operating Company -

o... uor.,

$r*e('Nhe*$

the southem electoc system March 1,1996.

Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Operator Licensing Examination Data

Dear Sir:

In accordance with NRC Administrative Letter 96-01, Southern Nuclear Operating Company voluntarily submits the attached Joseph M. Farley Nuclear Plant (FNP) proposed Operator Licensing Schedule (NRC Form 536) for fiscal years 1996-1999. Additionally, as requested, the scheduled Licensed Operator Requalification Examinations dates for 1996 are included below.

Simulator examinations for the Operations Department shift personnel are to be conducted during the week of March 4th. Simulator examinations for other FNP staff personnel are to be conducted during the weeks of March 18th, April 8th, April 29th, July 15th through August 26th, and October 7th through October 14th.

Job Perfomiance Majors (JPM) examinations for the Operations Department shift personnel are to be conducted during the weeks of June 3rd through July 8th. JPM examinations for other FNP staff personnel are to be conducted during the weeks of August 26th through September 30th.

Should you have any questions, please advise.

Respectfudy submitted,

/

yrlflt Dave Morey DNM/dc Attachment 050051 1 e 9603050473 960301' PDR ADOCK 05000348 ,<h 36 V PDR \\)V g

i b U. S. Nuclear Regulatory Commission Page 2 xc: Southern Nuclear Operating Comnany Mr. R. D. Hill, General Manager U. S. Nuclear Regulatorv Commission. Washington. D. C. Mr. B. L. Siegel, Licensing Project Manager - NRR U. S. Nuclear Regulatory Commission. Region 11 Mr. S. D. Ebneter, Regional Administrator i Mr. T. M. Ross, Senior Resident Inspector i I i REES D.03.01

.~ e AkC f 0RM SJ6 L.b. htiLLAR WLbl LAIOk% LUMM15h40N AFPHOb tD St OMh; hu. 3150-0136 LArikth; LJi/97 (8-94) isturap Bt,anas Paa Ramunes ToComeLv mlrs Tuan(M4mnavosvNuLoev4av) OAustwm Raot ast: 1 ihn m. Tms Immannaarwm is(RegussWRsetanas) Sv NRC To Pt St as.sta Amt llawst'asta Foe Ornamfue Emane=Arusma Fos.ame Cosenssota Rat.amesmo OPERATOR LICENSING a - --= r= = >- -- - =-- *~~' - =2 4..'.m..o 5 mm.a m.o

a. c m -..C

-i. A T.T. a .as ' ~ ' " ' ' ' ' ' * ' " " ' * * " " " ' " * ' ' ' ' ' " ' ' ' ' " ' ' * * " ' " ' " ' ' FdXAMINATION 1)ATA 2e'9e1 hRC M4t Nor Conas<t Os Seaweena, A=e"A Pransa la mrt Racenan"a To A CUL4 34TNm Op knamuarum Listaas it Dewt4)e A O'suswrty %'aus OMS Cturvura. Nt atassL P Al ILJ i) A kC RLblON SOUTilERN NUCLEAR OPERATING COMPANY JOSEPil M. FARLEY NUCLEAR PLANT-UNITS I & 2 11 7388 NORTil STATE lilGilWAY 95 COLUMIIIA, AL 36319-4120 A. PROPOSED OPERATOR LICENSING EXAMINATION SCilEDULE FY 1996 FY 1997 FY 1998 FY 1999 (l0/01N$.9/30/96) (l0/0I/96-9/30/97) (10/0l/97 9/30M8) (l0/01/98 9/30/99) ^ "N" "'8 " 80" ,, "$"$C iEu m hUMBI:A OF ExACnm OPERAnas 0 0 0 2 I NUMBER OF SENWs REA( T(m OPERAns$.* lN5f ANT 4 0 0 6 i (Completed) NUMDER OF BFNMS RE ACTTm OPSAnm3 UPGAAre 1 0 0 0 (Completed) NUMBER OF SENifa REACTOR OrER Anos.. uMrreu 0 0 0 0 ,,A"y[D,^g, 8-APRIL APRIL APR!L APRIL NUMHFR OF ReACnm OPERAnas 0 0 0 0 j NUMHER OF SEMOR REACMm OrsRAnms..iNsTAvr 0 8 0 0 j NUMHtR Or sEmOR REACnm OrERAnas.. UpcRApe 0 0 0 0 3 NUMBER OF SENIOR REACTOR OPERAn25. WMTTED 0 0 0 0 I B. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCilEDULE FY 1996 l Arait 1996 ociollLR 1996 ESTIMATED NUMBER OF CANDIDATES e 8 0 l NRC FORM $36 (R-94) I t i}}