-_

k O

o BIDDING DOCUMENTS AND PLANS AND SPECIFICATIONS SPECIFICATION 3240-18 HVAC PACKAGED AIR CLEANING UNITS CONTRACT No. 3240-18 WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECTS No. 3 & 5 1977 8412120313 840626 gpg; gig 4_2. m sy c.~o. 18 iom x e . . , C. . . , , ,,-

CLIEN, CONCU RRENCE ISSU E e.x un .. ,.u X sio issur 4-o77 0l{ JL

  • l'roject bientil i t al ion
s. ,

-- No. WPPSS-3240-018 EBASCO SERVICES INCORPORATED EBASCO SPECIFICATION HVAC PACKAGED AIR CLEANING UNITS FOR NUCLEAR POWER PIANIS WPPSS CIASSIFICATION - QUALITY CLASS I & II NUCLEAR SAFETY CLASS 2 & 3 AND NON-NUCLEAR SAFETY SEISMIC CATEGORY I AND NONSEISMIC CATEGORY I ENGINEER: EBASCO SERVICES INCORPORATED fpL J. Es OWNER: WASHINGTON PUBLIC POWER SUPPLY SYSTEM / 9 y $ or %4 9 OPERATING COMPANY: WASHINGTON PUBLIC POWER SUPPLY SYSTEM T/

s ,

')

{

PROJECT: NUCLEAR PROJECTS NO. 3 AND 5 L\ M ,

Ny rteto g'.~

LOCATION: GRAYS HARBOR COUNTY. WASHINGTON I j NOMINAL KW 1,250.000 f -

PREPARED UNDER THE SUPERVISION OF WASHINGTON PE LICENSE No.14556.

P J ESTREICH

. Spec Status Date Prepared By: N yiewed By: Pages Affected M

H K Patel kdl R fpbimeca/L AMiman ALL Original 9/30/77 R1 R2 R3 R4 l

$PEC NO. 3240-018 DATE l

K cucNr couweNT issue CLIEN T CONCU RRENCE $$$QE g3OJ j tits toppe f.te EO IINE !O*b a i #/

\ -r-77~

v- - ;-

.-r ,

TABLE OF CONTENTS PART I - BIDDING DOCUMENTS ,

PART II - PLANS AND SPECIFICATIONS

. DIVISION 1 - General Conditions and Special Conditions Section lA - General Conditions' Section IB - Special' Conditions Section 1C - Drawings and Referenced Specifications DIVISION 2 - Technical Specifications Section 2A - Technical Specifications e

i l

l I

$PEC. NO. 3240- 018 'DaTE'

)( cuawr comuswr issus 4-50-74 cuant concunacuer issus is ,s e w ks ,.v. X.eso issus /0 0-77 N

t. . m
s, .

.PART I BIDDING DOCUMENTS' l

WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECTS No. 3 & 5 3240-D 5/13/77 i

$PEC. NO. 3240-18 DATE

((T CLf EN T COMMENT 955U E d*2*77 I

CLIEN T CONCURRENCE ISSUE

.'1778topps7.74. Xl 3t0 ISSUE /O-D. 77 hl pa/c

TABLE OF CONTENTS BIDDDiG DOCUMENTS Page 1.0 N3TICE TO BIDDERS BD-1 2.0 INSTRUCTIONS TO BIDDERS BD-3 2.1 Contract Documents B D-3 2.2 Examination of Documents BD-3 2.3 Interpretation BD-3 2.4 Form of Bid BD-4 2.5 Pricing Schedule and Completeness of Bids BD-4 2.6 Alterations in Bid BD-4 2.7 More Than One Bid BD-5 2.8 Execution of Bid BD-5 2.9 Submittal of Bid BD-5 2.10 Modification of Bid BD-5 2.11 Withdrawal of Bid BD-5 2.12 Postponement of Opening BD-6 2.13 Opening of Bids BD-6 2.14 Prices BD-6 2.15 Rejection of Bids BD-8 2.16 Aceptance of Bid or Rejection of All Bids BD-8 2.17 Bid Guaranty BD-8 2.18 Evaluation of Bids BD-9 2.19 Bidder's Qualifications BD-10 2.20 Information to be Submitted with Bid BD-11 3.0 BID BOND B D-12 j 4.0 PROPOSED FORM OF AGREEMENI BD-13  !

5.0 PERN RMANCE AND PAYNENT BONDS BD-16  ;

6.0 TECHNICAL AND OTHER DATA TO BE FURNISHED WITH BID BD-17 6.1 HVAC Packaged Air Cleaning Units BD-17 6.2 Subcontractors BD-17 6.3 Experience of Bidder BD-17 6.4 Special Tools BD-18 6.5 Proposal Drawings and Data BD-18 6.6 Quality Assurance and Control BD-20 '

6.7 Additional Proposal Supporting Data BD-22 7.0 PROPOSAL BD-23 7.1 General BD-23 7.2 Pricing Data BD-24

7. 3 Technical Direction BD-26 7.4 Delivery BD-27 7.5 Performance and Payment Bonds BD-27 7.6 Further Items of Agreement BD-27 7.7 Addenda Acknowledgement BD-28 7.8 Agreements Prior to Contract Signing BD-28 7.9 Proposal Signature Identification BD-29 B D-i $PEC. NO. 3240 10 DATE

/j\ CuENT CowwENi issue 4-2-77 CLIEN T CONCURRENCE IS$U E 9773Iwppi7 74 X BIO ISSUE /gp 7}

lJI to t:

f .

e-WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECIS No. 3 & 5 CONTRACT No. 3240-18 NOTICE TO BIDDERS The Washington Public Power Supply System invites bids on the following described work in support of construction of Nuclear Projects WNP-3 and 5 to be built in Grays Harbor County, State of Washington.

Contract No. 3240-18 HVAC Packaged Air Cleaning Units Work generally consists of the engineering, design, manufacture,

. shop testing, preparation for shipment, delivery, and technical direction of installation of the HVAC Packaged Air Cleaning Units.

Bidding Documents and Plans and Specifications may be ==f ned at the office of the Owner, 3000 George Washington Way, Richland, Washington, or at the WPPSS Project Office, Ebasco Services Incorporated, Two Ractor Street, New York, New York 10006. Sets of Bidding Documents.

and Plans and Specifications can be obtained from Ebasco Services Incorporated at the above address for a plan fee (notrefundable) of

$30.00 each.

Each bid shall be accompanied by a bid bond or certified or cashier's check as a bid deposit in an amount not less than five percent (5%) of the total amount of the bid.

All bids must be sealed and filed with Owner at 3000 George Washington Way, Richland, Washington 99352, at or before 10:00 a m local time on Nov. 16, 1977 , at which time and place the bids will be publicly opened and read.

Owner reserves the right to reject any and all bie's acd to waive irregularities or informalities therein. Each bid shall b: aunmitted only on the prescribed forms and bound as a complete proposal.

1 Washington Public Power Supply System P O Box 968

Richland, Washington 99352 F D McELWEE Assistant Director - Projects

$PEC. NO. 3240-18 DATE BD-1

/\\ CLIEN T COMMENT f $$U E [.[G')

CLIEN T CONCU RRENCE ISSUE t??8twppi 7.74 X BIO 1$8UE /O /0 ~1')

H/

N

7 ,

,- 7.x m -

s ,

. .l

-: t . l

26. QUALITY ASSURANCE REQUIREMENTS

.01 Quality-Assurance Requirements for VPPSS Quality Class ItEquipment .- i a - The' Quality Assurance requirements for:the Quality Class I ,

~

Equipment and activities.shall be in accordance with applicable- .

- portions of Ebasco Specification 860W,' entitled " Contractor Quality Assurance Requirements."

b .- Contractor shall submit a controlled copy of his Quality Assurance Program- to Engineer for- review and cone.ent, in accordance with

.the Submittal Procedures in Section IB and the schedule in Section 2A.

c - Prior to fabrication, Contractor shall submit detailed Quality; Assurance procedures for review and cocnents by Engineer,-in accordance with the Technical Submittal Procedure in Section 1B, and the schedule containea in this Technical.Section. .

The fol' lowing prdcedures shall be among those submitted:

1 - Welding procedures 11 - Welder and procedure qualification ' test reports 111 - Nondestructive testing procedures and personnel qualifications in accordance with ASNT-TC-1A iv - Packaging, preservation, handling, storage and' shipping procedures.

v - Shop test procedures

d - Contractor shall also submit an inspection and ' test plan describ-ing planned inspection and/or tests. The furnishing of such a plan is used fo'r determing inspection points which Engineer will-desire to witness. Engineer will advise Contractor as to inspec-tion and test points ic will _ witness. Contractor shall not pro-ceed beyond these points until witnessed by Engineer.' Engineer reserves the right 'to waive witnessing of the above, e - Documentation .

Contractor shall submit two (2) sets of complete : documentation package, one set to be sent to the site prior to shipment and the other to be enclosed with each shipment. This documentation pack-age shall include, but not be limited to:

t' i -- All records, documentation, test data and- certification as well as any other documents required

  • by the specification, and applicable codes and standards together with an index of all documents submitted.

11 - The identification of the item, nominal- size and rating, tag or serial number, WPPSS contract and item number.

. M/

. . .gope 2A- 67 SPEC. NO. 3240 - 18 lOATE

,,m ,, , ,,u ,  ;, ,7;,

I .

,- i

.1 - ,

26. QUALITY ASSURANCE REQUIREMEN"rS (Cont 'd) 01 Quality Assurance Recuirements for WPPSS Quality Class I Eculement (Cont'd) e - Documentation (Cont'd)

T iii - Nonconformance reports which have been submitted to Engineer with disposition indicated.

iv - Manufacturing certificate of conformance including original signed by an authorized representative stating that.the supplied item conforms to all contractual requirements.

v - Certificate of compliance with seismic requirements. This certification shall identify the equipment involved by serial or part number and shall reference seismic criteria, vi - A signed copy of the " Release for Shipment" form, with the equip =ent, which will be provided to the Contractor by the Engineer's Vendor Quality Assurance Representative.

vii - Certification- that Contractor has complied with Engineer approved program for cospliance to IEEE 323-1974 viii - Docu=entation required by code.

ix - All QA records shall be traceable to the equipment, commodity and hardware. An "a s-built" sketch or listing of material .

within the ' item, shall be provided to per=it traceability to the mill test report, shall be submitted, f - Review Prior to Submittal -

. Documents and procedures submitted by Contractor shall have been reviewed and approved by the Contractor to assure conformance to the contract requirements, g - One set of radiographic film and corresponding interpreter infor-cation shall be submitted to Engineer's Nondestructive Examination Section (New York) for review and dispositicn. Upon completion of review, film will be returned to Contractor for proper storage.

Radiographic films shall be approved by Engineer prior to the shipment of the equipment to the site.

.02 Quality Assurance Recuirements for WPPSS Ouality Class II Eculoment a - The Quality Assurance requirements for the Quality Class II activities and equipment shall be in accordance with the Contrac-tor's Quality Control Program.

M/

g44e 2A- 68 PEC.NO. M c- 18 lcATE

/Al cucier cow n,.r issoe W.2. 7/

w. a
>=
- > .( x 1

, .' l 9.?

, 1 26.. QUALITY ASSURANCE REQUIREMENTS (Cont 'd)

.02: Quality Assurance Recuirements for WPPSS Quality Class II Eautement (Cont'd)'

b L- Prior .co fabrication, the Contractor shall submit to the Engineer's

. Quality Assurance engineering, an inspection and- test plan -

describing planned inspection and/or tests. The furnishing of such a plan is used for determining- inspection points which the Engineers will desire to witness. The Engineer will advise the Contractor as to inspection and test points it will witness.- The

~

Contractor shall not proceed beyond' these points until witnessed

. by the Engineer. The Engineer, however, reserves the right to

. waive witnessing of_the above, c - Quality Class II activity records shall be controlled by the Contractor.in accordance with a written procedure which incor-porates the requirements of QA records, d - The following fabrica, tion and processing procedures shall be -

r Smitted to the Engineer for review and comment in accordance

.^ with the Technical Document Submittal Procedure in Section 1B and the schedule contained in this technical section.

1 - Welding procedures 11 - Welder and procedure qualification test reports

~

iii - Packaging, preservation, handling, storage and shipping procedures -

e - Documentation Contractor shall submit two. (2) sets of complete documentation p'ackage, one set to be sent to the site prior to shipment and

~

the other to be ~ enclosed with each shipment. This documentation package shall include, but not be limited to:

1 - All records, documentation, test data and certification as well as any other documents required by the specification, together with an index of ~all documents submitted.

11 - The identification of the item, nominal size and rating, tag or serial number, WPPSS contract and item number, iii - Nonconformance reports which have ,been submitped to Engineer with disposition indicated ,

iv - Manufacturing certificate of conformance including original signed by an authorized representative stating that the supplied item conforms to all contractual require =ents WI _

94A

.2A-69 $PEC. HO, 3740- 18 hoATE l Ae m,,,aa-,..... . . . . . ,en ,.

f; e _\

e.s .

y -= ..

=+ 1 -;

26. QUALITY ASSURANCE REQUIREMENTS (Con t 'd ) ,- ,

.02 Quality Assurance Recuirements for WPPSS Quality Class II Equioment (Con '

e - Documentation (Cont'd)

.- v - Certificate of compliance with seismic requirements (if

..- applicable). This certification shall identify the equip-ment involved by serial or part number and shall reference seismic criteria.

vi - A signed copy of the " Release for Shipment" form, with the equipment, which will be provided to the Contractor by the Engineer's Vendor Quality Assurance Representative.

f - Quality Assurance Records Quality Class II Equipment Records pertaining to the quality of the equipment shall.be controlled by the Contractor in accordance with a written procedure.

't Contractor shall submit a fist of all records and stipulate those records being retained.

Quality Assurance records shall provide sufficient information to identify the records and the item or activity to which they apply.

Quality Assurance records shall not be altered, changed, modified or corrected without proper justification. The correction or change shall include the date and identification of the person' authorized to make change or correction.

The Owner or its representative shall be afforded the opportunity to acquire possession of any Quality Assurance records generated and are necessary for adequate traceability.

g - Review Prior to Submittal Documents and procedures submitted' by the Contractor shall have been reviewed and approved by the Contractor to assure confor ance to the contract requirements.

.03 Soecial Conditions - WPPSS QC-I Nonconformance Recuirements a - Scope This section pertains to those activities affecting the quality of structures, systems or components associated with WPPSS Nuclear Project No. 3/5 and presents the requirements that shall be follow-ed by Vendors and Contractors of WNP-3&5'prepurchased Quality Class 1 Equipment. ,

l

' N/ _ j top 2A-70 _5PEC; NO. 3240- 18 lDATE ]

[ CLleNT COWWeNT issue l[~2 77 i

. Quest concuaacuce issur 6 1

0FFICIAL USE ONLY MEMORANDUM TO CASE FILE TYPE TION PARTICIPANTS FILE NQ.

(' ) RECORD OF CO NVE RS Afl0 N [ ][

( ) Cast Review / STATUS Jfj_ _ p g _[ DATE

< > ~~R m7pr-nri CONFIDEN TI ALITY REQUESTED YES NO

, f&WL

, A .. . . -

.&/ 1 n' W k 2- ~f/[A 0

&LcLCAL w

-._e.

- ~ r&&a a$ 2 w_~ & ~ /k i n A 4 n}ad so- czw/d--

o neax6 o x a a . -

W -

  • e6 9 %

.m 66 m- e m e

=w a w

-9em -

N e sup&- O m W em.-me.-=en h*4hw. -- -6he e.

PAGE OF DATE PREPAf [ OY

/6w <- /M p2 d)- - -

ACTION REQUIRED

- - . . - - . - - -...-o-- .- . . .

"*'* wemee9- e esow W* m. &..,ee CEyltwED BY DATE OFFICIAL USE ONLY 00 NOT DISCLOSE r0:e Azz-Tis R.,a p/g

/ g# _,

.~.,

OFFICIAL USE ONLY  :

MEMORANDUM TO CASE FILE ION PARTICIPANTS FILE NO.

TYPE (M RECORO OF CONVERSAfl0N Q[g][

i ca.E .tvit. / .T.70. # eve # //s [/P/b '

OAft or-or-P 2

<> 0,,l t ,

Tlut CONFIDENTIAUTY Rt0088750 YES NO

_ /1

_ [f'c/'t (LuY /C $ YW Ah / // /rft. _fe r14 A iss V/s oM ,~44L ~ i ss -rt ~ ., 4 ,,_, '

/

birt" (n/Y $$ A l/l* b cnec " wcse,de,.s Me isE rY bbe sJ OJ

-/c % G J.,/ A D d rs,< s 92L in, c K-n.a nd/#b xo e> w<sh.<4 s e,id T J// Ret /Ar .

4-f/u LUun:L cvJ ficu6 ~ A, w<J &+

i .A~ l'daf i.J~,,JL., sh< e . ub L. A<LwA -/c' ~

.u ,, d' & /'

O e e I

~

,Aet / Or /

TREPARED ST Daft l' e r J L O F O V- l'2.

.CTION REQUIRED Rivit.EO gy DATE.

OFFICIAL USE ONLY - DO NOT DISCLOSE r=a azz-Tie n...

[)/Y /2>

0FFICIAL USE ONLY r vx MEMORANDUM TO CASE FILE TYPE ACTION PARTICIPANTS FILE NO.

( ) RECORD OF CONVERSAfl0N L, DATE

( ) CASE REVIEW / STATUS _/J.C. =/._

    1. 2

' ' o'"'"

. on c + L _%llo0 725-fl7.5 YES NO

,,?,

CO NFl0ENTI ALITY REQUESTED SUMMART EW // WA /1 $$-.! O &_C _f -

Q //l / Ql l< '9/l/ /?//ssbar Nso k j __Qf_c 4

./f frAa s er ' esl e lr ')_ JJu ra) ./ tt U. .N B1

  • _ IA . -) &/ S4 ll 4 M -

/LeesY r ri. 2 ee- ne Yxsu j _ . . _

lf) hfb MA) e

,u, . ,s. . ,

9 W ?. -

- - - - - . - - - - - - ~ - -

PAGE OF PIEPARED SY DATE ACTION REQUIRED N.me_ **"

CEyltwt0 gy DATE OFFICIAL USE ONLY -

DO NOT DISCLOSE

      • f "" " ~ .

__ _._, . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ lh

, OFFICIAL USE ONLY MEMORANDUM TO CASE FILE PARTICIPANTS FILE NO.

TYPE AC ON

( RECORO OF C O NVE RS ATIO N

( ) CASE REVIEW / STATUS

[ 1 J DATE

~ '

( ) OTNER CO N FIDEN TI ALITY REQUESTED TES NO

SUMMARY

J & /f g$ /4 *) [ '

ll 4,J L, fn ~., Lo, oc ai N4~< y W(k/1).qw yrpy WJd nu %~ rx I4M; 4 ~= ~A4 4 /C %dJ l Yg $74t Of fd $M pf y.f 4 fe~AJ72 4, w.

PAGE OF PIEPARED Sy DATE ACTION REQUIRED KEVIEWED Sy DATE OFFICIAL USE ONLY DO NOT DISCLOSE re:a e n -tio Ro, , b/6 p//

. OFFICIAL USE ONLY MEMORANDUM TO CASE FILE FR E NO.

TYPE ACTION PARTICIPANTS

/g -

-003 RECORD OF CONVERSAfl0N

( ) CASE REVIEW / STATUS ' b 8 b_ DATE f( 3 OTHER C ON Fl0ENTI ALITY REQUESTED YES NO h, h SUMMART Y! . - . . . . - . . _ . . ... hh!N .f l JD .L 2 8 fS$ 2 - 2. - 0 0 $ k - $ 2. - D / ( __ _

4

3lfrg d .

9/27/f2_

ACTION REQUIRED a.+.e n_. 4 . .

CEy EwtD SY DATE OFFICIAL USE ONLY -

00 NOT DISCLOSE t

Fe m Mrz-Ti, R... a J{ c. s.,

Mkl4, a'%og (m UNITED STATES

(

8 n NUCLEAR REGULATORY COMMISSION 8 E REGION 11 s .. 101 MARIETTA ST N.W., SUITE 3100 o,Y ATLANTA, GEORGIA 30303 -

g*****

JUN 9 1882 MEkORANDUMFOR: James Y. Vorse, Investigator, Enforcement and Investigations Staff FROM: James P. O'Reilly, Regional Administrator

SUBJECT:

AUTHORITY TO ADMINISTER 0ATHS OR AFFIRMATIONS You are hereby delegated authority to administer oaths or affirmations in accordance with Section 161C of the Atomic Energy Act of 1954, as amended in furtherance of the following investigation:

Bahnson, Inc. (Vendor)

Improper QC Practices - HVAC Systems Case 2G036 This authority extends to all interviews that you may conduct during the course of this investigation ar.d may be exercised as you deem appropriate.

This authority cannot be redelegated and does not extend beyond the instant investigation.

\

% k@

mes P. O'Reilly cc: R. Fortuna, IE PP /.'