Forwards Fitness for Duty Program Performance for Period Jul-Dec 1995
ML20100L620
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/27/1996
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-96-00018, GNRO-96-18, NUDOCS 9603040347
Download: ML20100L620 (5)


Text

,b

...,,, o,.,: i:.2, io,.

" ENTERGY

==

Ptet Gcson.MS 39150 Td UJ1437 2600 C. R. Hutchinson vre Preso-u

($ efillXALS Grana Cxe N.rh4ar Swr >n February 27, 1996 b

U.S. Nuclear Regulatory Commission Mail Station F1-37 Washington, D.C.

20555 Attention:

Document Control Desk l

Subject:

Grand Gulf Nuclear Station Docket No. 50 416 License No. NPF-29 Fitness for Duty (FFD) Six-Month Report GNRO-96/00018 Gentlemen:

Attached is the Grand Gulf Nuclear Station (GGNS) Fitness for Duty Program performance Six-Month Report. This report is being submitted in accordance with 10CFR26.71 for t.he reporting period July through December 1995. The information contained in the attached is based on statistical data and trend analysis compiled by means of the GGNS Fitness for Duty Program.

Should you require additional information, please contact Mr. H. F. Cooper at (601) 368-5820.

Yourc truly,

/

s.

CRH/RS /mtc attachment:

GGNS Fitness for Duty Six-Month Report cc:

(See Next Page) 040105 l

9603040347 960227 PDR ADOCK 05000416 II R

PDR l

February 27, 1996 GNR0-96/00018.

Page 2 of 3 cc:

Mr. J. E. Tedrow (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. J. W. Yelverton (w/a)

Mr. L. J. Callan (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohaw, Project Menager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555

.. O O

l i

Attachment to GNRO-96/00018 FITNESS FOR DUTY SIX-MONTH REPORT JULY 1, 1995 THROUGH DECEMBER 31, 1995

]

Manaaement Action:

Management actions to enhancing the Fitness for Duty Program during this l

reporting period were:

Company procedure OM105, Fitness for Duty, was revised to strengthen e

program requirements to ensure that Entergy Operations employees not requiring unescorted access adhere to all provisions of the FFD program l

with the exception of random drug / alcohol testing. Contractors and vendor personnel not requiring unescorted access are subject to for cause testing, including post acciden drug / alcohol testing in accordance with the provisions of this procedure. While random testing is not required for non-keycarded personnel, the company procedure continues to provide the desired deterrent.

1 Management has endcrsed the development of a new Fitness for Duty computer program. The new program, which will be designed to work in conjunction with other Entergy Operations specific applications, will eventually replace the HEIDI software which is currently being used.

The new software will allow more timely access to information, simplify processes, reduce redundant data entry and will operate on a local area j

network.

Implementation is scheduled for June 1996.

i l

Fitness for Duty Initiatives Taken:

This new software program is being created with the input of all sites which is scheduled to be implemented near the end of March, 1996.

Assistance was provided to River Bend in preparations for RF06.

Random testing rate during this period was 35.8%.

1 Effectiveness Evaluation.

The Fitness for Duty program continues to update and revise procedures based on operating experiences, lessons learned and NRC audits conducted at other nuclear sites to ensure a drug free workplace. Data trend analysis during the reporting period indicated no program weaknesses requiring evaluation for corrective action.

i Recortable Events:

l None

1 u

Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 1

2 l

ENTERGY OPERATIONSJNC.

December 31.1995 Company 6 Months Ending 3

l 1

GRAND GULF NUCLEAR STATION i

Location

~

4 5

i DONNA WILLIAMS (6011 437-2481 Contact Name Phone (include area code) 5-A Random Testing Rate 50%

1 6

Cutoffs: Screen / Confirmation (ng/ml)

[ ]

Appendix A to 10CFR 26 Marijuana 50/15 Amphetamine 1000/500 N/A 1

1 Cocaine 300/150 Phencyclidinc 25/25 N/A

/

^

Opiates 300/300 Alcohol (%BAC) 0.04 N/A

/

I i

Testing Results Licensee Employees lAng-Term Contractor Short-Term Contractor Personnel Personnel

7. Ascrage Number with 1140 N/A unescorted Access
  1. E "

Tc ted Pos tive Tcted Pos tive Tc ted Pos tive Pre-Access 60 0

7 0

116 0

' FOR CAUSE :

' [FNsi'aciident':[

0 0

0 0

0 0

fobs rved Beldl$rf >

0 0

0 0

0 0

355 1

18 0

43 0

Follow-up 3

0 0

0 0

0 5

0 0

0 0

0 i

l

'"I 423 1

25 0

159 0

FFD-44

. ~. _. _....

~

l BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Phencyclidine Amphetsmines Alcohol Refusal to Test 1

2 3

4 5

50-100 loo-up Licensee Employees 0

0 0

1 0

0 0

0 N/A N/A N/A N/A N/A Long-Term Contractors 0

0 0

0 0

0 0

0 N/A N/A N/A N/A N/A Short-Term Contractors 0

0 0

0 0

0 0

0 N/A N/A N/A N/A N/A A

hal 0

0 0

1 0

0 0

0 N/A N/A N/A N/A N/A 1

i w--

-