|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17292B2471998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2.W/980212 Ltr ML17292B2151997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for WNP-2.W/980115 Ltr ML17292B1341997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr ML17292B1101997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr ML17292B0851997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2.W/971010 Ltr ML17292B0511997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for WNP-2.W/970911 Ltr ML17292A9611997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2.W/970807 Ltr ML17292A9331997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr ML17292A8971997-05-31031 May 1997 Monthly Operating Rept for May 1997 for WNP-2 ML17292A8531997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for WNP-2 ML17292A8561997-03-31031 March 1997 Corrected MOR for Mar 1997 for WNP-2 ML17292A8171997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for WNP-2.W/970411 Ltr ML17292A7391997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for WNP-2.W/970313 Ltr ML17292A7011997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr ML17292A6631996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for WNP-2.W/970109 Ltr ML17292A6311996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for WNP-2.W/961210 Ltr ML17292A5921996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr ML17292A5371996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for WNP-2.W/961009 Ltr ML17292A4761996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for WNP-2. W/960912 Ltr ML17292A4071996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for WNP-2.W/960807 Ltr ML17292A3611996-06-30030 June 1996 Monthly Operating Rept for June 1996 for WNP-2.W/960712 Ltr ML17292A3191996-05-31031 May 1996 Monthly Operating Rept for May 1996 for WNP-2.W/960610 Ltr ML17292A2671996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for WPPSS.W/960513 Ltr ML17291B2961996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for WNP-2.W/960410 Ltr ML17291B2631996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr ML17291B2291996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Wnp Unit 2.W/960209 Ltr ML17291B1941995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for WNP-2.W/960111 Ltr ML17291B1541995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for WNP-2.W/951207 Ltr ML17291B1071995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for WNP-2.W/951110 Ltr ML17291B0731995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for WNP-2.W/951009 Ltr ML17291B0131995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for WNP-2.W/950911 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17292B5741998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with 990225 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17284A6491998-05-31031 May 1998 Rev 0 to COLR 98-14, WNP-2,Cycle 14 Colr. ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2641998-03-0404 March 1998 Performance Self Assessment,WNP-2. ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17284A7971998-02-17017 February 1998 Rev 28 to Operational QA Program Description, WPPSS-QA-004.With Proposed Rev 29 ML17292B3591998-02-12012 February 1998 WNP-2 Cycle 14 Reload Design Rept. 1999-09-30
[Table view] |
Text
.
OPERATING DATA REPORT DOCXET NO. 50-397 UNIT WNP-2 DATE II/1/84 COMPLETED BY L.B. HutChiSOn TELEPHONE (509) 377-2501 ext 2486 OPER ATING STATUS
- 1. REPORTING PERIOD: OCTOBER 1984 GROSS HOURS IN REPORTING PERIOD:
745
- 2. CURRENTLY AUTHORIZED POWER LEVEL (4tpfp 3323 max. DEPENO. CAPACITY (MWe. Net): 1100 DESIGN ELECTRICAL RATING (MWo. Net): IWU MAX. DEPEND. CAPACITY (MWe-G MSS:) 1155
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
- 4. REASONS FOR RESTRICTION (IF ANYl:
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUM8ER OF HOURS REACTOR WAS CRITICAL ,............. 480.6 2150.9 2150.9 0 0 0
- 6. R EACTOR R ESERVE SHUTOOWN HCURS . . . . . . . . . . . . . . . . . . .
- 7. HOU R S GEN E R ATO R ON LI N E . . . . . . . . . . . . . . , , , . . , , , , , 409.9 1594.2 1594.2 0 0 0
- 8. UNIT RESERVE SHUTDOWN HOURS ....... .............
- 9. GROSS THERMAL ENERGY GENERATED (MWHI .,,,.......,,, 787.680 2.672.992 2.672.992
- 10. GROSS ELECTRICAL ENERGY GENER ATED (MWHI . . . . . , , , , , , , 232.727 759.340 759.340
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) ......... . . 218.858 704.102 704,102
- 12. R EACTOR SERVICE P ACTOR , . . . . . . . . . . . . . . . . . . , , . . . , . . N/A ---- ----
- 13. REACTOR AVAILABILITY FACTOR . . . . . . . .............,,
- 14. U NIT SERVIC E F ACTO R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A ---- ----
- 15. UNIT AV AI LA BI LITY F ACTOR . . . . . . . . . . . . . . , , . . . . . , , , . N/A ---- ----
~~~~ ~~~~
- 16. UNIT CAPACITY PACTOR (Using MOCl , , . . . . ......,,.,..
"~~~ ~~~~
- 17. UNIT CAPACITY FACTOR (Uning Design MWel . ........ . ..
~~~~ ~~~~
- 18. UNIT PORCED OUTAGE RATE . . .......................
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS ITYPE. DATE. AND CURATICN OF EACHl:
Maintenance M2 Outage 11/12/84 for 8 days. Annual maintenance outage 4/1/85 for 60 dayE
"~~~
- 20. IF SHUT COWN AT END OF REPCRT PERIOD. ESTIMATED DATE CF STARTUP:
- 21. UNITS IN TEST STATUS (PRICR TO CCMMERCIAL CPERATICN!: PORECAST ACHIEVED INITI AL CRITICALITY l/l6/84 l/l9/84 INITIAL ELECTRIC!TY 5/15/84 5/27/84
~~~
COMMERC!A L OPERATION Generator nameplate rating 1.231.700 KVA 0 0.975 P.F.
8412110595 841031 PDR ADOCK 05000397 PDR
_ R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 11/1/94 COMPLETED BY L.B.-HUTCHISON TELEPHONE (509) 377-2501 ext. 2486 MONTri October 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 136 1
37 630 2
0 18 717 3 0 669 19 4 0 20 519 5 0 21 0 6 26 22 0 7 115 0
a 119 24 7 9 0 25 435 to 0 26 634 11 206 27 749 12 623 182 2s 160 13 29- 183 14 162 20 781 15 625 750 31 16 693 *1 INSTRUCTIONS On this form, list the averar daily unit power level in MWeNet for each day in the reporting month.Compuie to the nearest whole megawatt.
These figures wdl be used to plot a g:aph for each reporung month. Note that when rnaximum dependable capacity is used for the net electncal rsting of the unit, there may be occasions when the daily average power level exceeds the ICCT, line (or the restricted power level line). In such cases, the average daily unit power output sheet should be foomoted to explain the apparent anomaly.
, 00(hET NO. 50-397- -
~
LNIT NAME WNP-2 "
l DATE 11/5/84 , ,
l LNIT SHJTDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REP 0RT PERIOD OCT. 19 84 TELEPHOE(509) 377-2501 ext 2486 mmth, yea'r SHEET 1 of 3 T M M RDE 1EMN iETFHi IE TEREN @ RNFUERT CAUSE & cuMNtCTIVE ACTION TO FREVENT REClFRENCE i
84-21 10/1/84 S 132.5 B .1 ---
HA TURBIN Test trip of turbine-generator at 75% power as :r l part of power ascension test program. The turbine by pass valves fast opening response time did not meet test criteria.
Testing and trouble shooting to correct problems.
84-22 10/7/84 S 0.4 8 1 ---
HE VALVEX X Tripped turbine-generator at 24% power for by-l pass valve (BPV) response time testing. Test did not meet criteria.
Continued testing and trouble shooting.
84-23 10/8/84 S 0.4 B 1 ---
HE VALVEX X Tripped turbine-generator again at 24% power for l
BPV response time tesing. Test did not meet criteria.
l ,
Continued testing and trouble shooting.
84-24 10/8/84 F 53.3 B 1 ---
HE VALVEX X Plant shutdown due to failure to meet test criteria.
, Continued testing and trouble shooting to correct problems.
i i I l l StM4ARY l -
I :
l TYPE REASON ETHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Nanual Exhibit F & H l S-Sched B-Maint or Test G-Oper Error. 2. Manual Scram Instructions fer
- l. C-Refueling H-Other 3-Auto Scram Preparation of l D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load- Licensee Event Report
& License Examination 9-Other (LER) File (MJREG-0161)
DOC $ETNO. 50-397 '
LNIT NE WNP-2 ',
DATE 11/5/84 -
LNIT SWTDOWNS / REDUCTIONS COWLETED BY L. B. Hutchison REPmT PERIOD OCT 19 84 TELEPHOE (509) 377-2501 ext. 2486 mcrith, yHr Sheet 2 of 3 W UATE TVPE TEGE REARN TETFEU IEF'FDER 3YSTER UNPDFERT CAUSE & CUNNtCTIVE ACTION TO FREVENT RECURRENCE 84-25 10/11/84 S 0.2 B l' ----
HE VALVEX X Tripped turbine-generator at 24% power for another test of BPV resnonse time. Test failed to meet test criteria.
Resumed testing and trouble shooting.
84-26 10/11/84 S 0.3 8 1 ----
HE VALVEX X Tripped turbine-generator at 24% power for another BPV response time test. Response time was satisfactory and turbine-generator was returned to service.
84-27 10/13/84 F 20.3 A 2 84-109 HA INSTRU C Plant shutdown due to cycling of turbine governor
& by-pass valves. It was determined after shutdown that cycling was caused by radio frequency inter-ference due to keying of hand held radio trans-mitters in the vicinity of electrosyn pressure transmitters.
All susceptable ir.strument locations were iden-tified and warning signs were placed in the area of DEH pressure transmitters. Action is also being taken to evaluate the possibility of modifying electrosyn transmitters to reduce
! I sensitivity to radio frequency interference.
l SLM4ARY l (SEE LER 84-109)
TYPE REASON ETHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (WREG-0161)
~
d m ,.50-397 *
-7 UNIT NME WNP-2 ,
DATE 11/5/84 .,'l l
LNIT SMJTOOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison RERRT PERI (D OCT. 19 84 TELEPHOIE (509) 3772501 ext 2486 acnth, yHr T UAE TTfE N NEEDI ETRE lTIEMBER 3?51EN TINUENT CmJsE & C0FRECTIVE ACTI(N TD FREVENT RECIARENCE 84-28 10/20/84 F 95.2 A 3 84-112 HB INSTRU-I Reactor. scranned on low steam pressure' due to an erroneous setpoint being initiated while' making a pressure change.
l A plant. modification (PMR) has been initiated to improve visibility of setpoints displays.
(SEE LER 84-112) 84-29 10/28/84 F 32.5 .A 3 LATER. HH VALVEX B Reactor scrammed from 92% power onLlow level due to loss of condensate booster pumps from low l suction pressure. Low suction pressure was
! caused by the steam seal condenser by pass valve-failing closed while trouble shooting valve problems. The valve was repaired and plant returned to service.
l l
l 1 l l SLM4ARY l -
l TYPE REASON METHOD SYSTEM & COMP 0fENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H t .S-Sched B-Maint or Test G-(ber Error 2-Manual Scram Instructions for l.
- C-aerueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5.aesired Load Licensee Event Report
& License Examination 9-Other (LER) File OUREG-0161)
r
- 0. . .. ,
Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372 5000 November 8, 1984 Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Subject:
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for October 1984 as required by our Technical Specifications 6.9.1.6.
Ve truly yours
. Ma tin (M/D927M)
P-2 Plant Manager JDM:pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT
.p