Monthly Operating Rept for Oct 1984
ML20100L564
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1984
From: Hutchison L, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
References
NUDOCS 8412110595
Download: ML20100L564 (6)


Text

.

OPERATING DATA REPORT DOCXET NO. 50-397 UNIT WNP-2 DATE II/1/84 COMPLETED BY L.B. HutChiSOn TELEPHONE (509) 377-2501 ext 2486 OPER ATING STATUS

1. REPORTING PERIOD: OCTOBER 1984 GROSS HOURS IN REPORTING PERIOD:

745

2. CURRENTLY AUTHORIZED POWER LEVEL (4tpfp 3323 max. DEPENO. CAPACITY (MWe. Net): 1100 DESIGN ELECTRICAL RATING (MWo. Net): IWU MAX. DEPEND. CAPACITY (MWe-G MSS:) 1155
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
4. REASONS FOR RESTRICTION (IF ANYl:

THIS MONTH YR TO DATE CUMULATIVE

5. NUM8ER OF HOURS REACTOR WAS CRITICAL ,............. 480.6 2150.9 2150.9 0 0 0
6. R EACTOR R ESERVE SHUTOOWN HCURS . . . . . . . . . . . . . . . . . . .
7. HOU R S GEN E R ATO R ON LI N E . . . . . . . . . . . . . . , , , . . , , , , , 409.9 1594.2 1594.2 0 0 0
8. UNIT RESERVE SHUTDOWN HOURS ....... .............
9. GROSS THERMAL ENERGY GENERATED (MWHI .,,,.......,,, 787.680 2.672.992 2.672.992
10. GROSS ELECTRICAL ENERGY GENER ATED (MWHI . . . . . , , , , , , , 232.727 759.340 759.340
11. NET ELECTRICAL ENERGY GENERATED (MWH) ......... . . 218.858 704.102 704,102
12. R EACTOR SERVICE P ACTOR , . . . . . . . . . . . . . . . . . . , , . . . , . . N/A ---- ----
  • ~~~ ~~~~
13. REACTOR AVAILABILITY FACTOR . . . . . . . .............,,
14. U NIT SERVIC E F ACTO R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A ---- ----
15. UNIT AV AI LA BI LITY F ACTOR . . . . . . . . . . . . . . , , . . . . . , , , . N/A ---- ----

~~~~ ~~~~

16. UNIT CAPACITY PACTOR (Using MOCl , , . . . . ......,,.,..

"~~~ ~~~~

17. UNIT CAPACITY FACTOR (Uning Design MWel . ........ . ..

~~~~ ~~~~

18. UNIT PORCED OUTAGE RATE . . .......................
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS ITYPE. DATE. AND CURATICN OF EACHl:

Maintenance M2 Outage 11/12/84 for 8 days. Annual maintenance outage 4/1/85 for 60 dayE

"~~~

20. IF SHUT COWN AT END OF REPCRT PERIOD. ESTIMATED DATE CF STARTUP:
21. UNITS IN TEST STATUS (PRICR TO CCMMERCIAL CPERATICN!: PORECAST ACHIEVED INITI AL CRITICALITY l/l6/84 l/l9/84 INITIAL ELECTRIC!TY 5/15/84 5/27/84

~~~

COMMERC!A L OPERATION Generator nameplate rating 1.231.700 KVA 0 0.975 P.F.

8412110595 841031 PDR ADOCK 05000397 PDR

_ R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 11/1/94 COMPLETED BY L.B.-HUTCHISON TELEPHONE (509) 377-2501 ext. 2486 MONTri October 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 136 1

37 630 2

0 18 717 3 0 669 19 4 0 20 519 5 0 21 0 6 26 22 0 7 115 0

a 119 24 7 9 0 25 435 to 0 26 634 11 206 27 749 12 623 182 2s 160 13 29- 183 14 162 20 781 15 625 750 31 16 693 *1 INSTRUCTIONS On this form, list the averar daily unit power level in MWeNet for each day in the reporting month.Compuie to the nearest whole megawatt.

These figures wdl be used to plot a g:aph for each reporung month. Note that when rnaximum dependable capacity is used for the net electncal rsting of the unit, there may be occasions when the daily average power level exceeds the ICCT, line (or the restricted power level line). In such cases, the average daily unit power output sheet should be foomoted to explain the apparent anomaly.

, 00(hET NO. 50-397- -

~

LNIT NAME WNP-2 "

l DATE 11/5/84 , ,

l LNIT SHJTDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REP 0RT PERIOD OCT. 19 84 TELEPHOE(509) 377-2501 ext 2486 mmth, yea'r SHEET 1 of 3 T M M RDE 1EMN iETFHi IE TEREN @ RNFUERT CAUSE & cuMNtCTIVE ACTION TO FREVENT REClFRENCE i

84-21 10/1/84 S 132.5 B .1 ---

HA TURBIN Test trip of turbine-generator at 75% power as :r l part of power ascension test program. The turbine by pass valves fast opening response time did not meet test criteria.

Testing and trouble shooting to correct problems.

84-22 10/7/84 S 0.4 8 1 ---

HE VALVEX X Tripped turbine-generator at 24% power for by-l pass valve (BPV) response time testing. Test did not meet criteria.

Continued testing and trouble shooting.

84-23 10/8/84 S 0.4 B 1 ---

HE VALVEX X Tripped turbine-generator again at 24% power for l

BPV response time tesing. Test did not meet criteria.

l ,

Continued testing and trouble shooting.

84-24 10/8/84 F 53.3 B 1 ---

HE VALVEX X Plant shutdown due to failure to meet test criteria.

, Continued testing and trouble shooting to correct problems.

i i I l l StM4ARY l -

I  :

l TYPE REASON ETHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Nanual Exhibit F & H l S-Sched B-Maint or Test G-Oper Error. 2. Manual Scram Instructions fer

l. C-Refueling H-Other 3-Auto Scram Preparation of l D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load- Licensee Event Report

& License Examination 9-Other (LER) File (MJREG-0161)

DOC $ETNO. 50-397 '

LNIT NE WNP-2 ',

DATE 11/5/84 -

LNIT SWTDOWNS / REDUCTIONS COWLETED BY L. B. Hutchison REPmT PERIOD OCT 19 84 TELEPHOE (509) 377-2501 ext. 2486 mcrith, yHr Sheet 2 of 3 W UATE TVPE TEGE REARN TETFEU IEF'FDER 3YSTER UNPDFERT CAUSE & CUNNtCTIVE ACTION TO FREVENT RECURRENCE 84-25 10/11/84 S 0.2 B l' ----

HE VALVEX X Tripped turbine-generator at 24% power for another test of BPV resnonse time. Test failed to meet test criteria.

Resumed testing and trouble shooting.

84-26 10/11/84 S 0.3 8 1 ----

HE VALVEX X Tripped turbine-generator at 24% power for another BPV response time test. Response time was satisfactory and turbine-generator was returned to service.

84-27 10/13/84 F 20.3 A 2 84-109 HA INSTRU C Plant shutdown due to cycling of turbine governor

& by-pass valves. It was determined after shutdown that cycling was caused by radio frequency inter-ference due to keying of hand held radio trans-mitters in the vicinity of electrosyn pressure transmitters.

All susceptable ir.strument locations were iden-tified and warning signs were placed in the area of DEH pressure transmitters. Action is also being taken to evaluate the possibility of modifying electrosyn transmitters to reduce

! I sensitivity to radio frequency interference.

l SLM4ARY l (SEE LER 84-109)

TYPE REASON ETHOD SYSTEM & COMP 0ENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Other (LER) File (WREG-0161)

~

d m ,.50-397 *

-7 UNIT NME WNP-2 ,

DATE 11/5/84 .,'l l

LNIT SMJTOOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison RERRT PERI (D OCT. 19 84 TELEPHOIE (509) 3772501 ext 2486 acnth, yHr T UAE TTfE N NEEDI ETRE lTIEMBER 3?51EN TINUENT CmJsE & C0FRECTIVE ACTI(N TD FREVENT RECIARENCE 84-28 10/20/84 F 95.2 A 3 84-112 HB INSTRU-I Reactor. scranned on low steam pressure' due to an erroneous setpoint being initiated while' making a pressure change.

l A plant. modification (PMR) has been initiated to improve visibility of setpoints displays.

(SEE LER 84-112) 84-29 10/28/84 F 32.5 .A 3 LATER. HH VALVEX B Reactor scrammed from 92% power onLlow level due to loss of condensate booster pumps from low l suction pressure. Low suction pressure was

! caused by the steam seal condenser by pass valve-failing closed while trouble shooting valve problems. The valve was repaired and plant returned to service.

l l

l 1 l l SLM4ARY l -

l TYPE REASON METHOD SYSTEM & COMP 0fENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H t .S-Sched B-Maint or Test G-(ber Error 2-Manual Scram Instructions for l.

- C-aerueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5.aesired Load Licensee Event Report

& License Examination 9-Other (LER) File OUREG-0161)

r

0. . .. ,

Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372 5000 November 8, 1984 Docket No. 50-397 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for October 1984 as required by our Technical Specifications 6.9.1.6.

Ve truly yours

. Ma tin (M/D927M)

P-2 Plant Manager JDM:pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT

.p