ML20100L424

From kanterella
Jump to navigation Jump to search
Forwards Final Vehicle Control Measures Implemented for Util Per Requirements of 10CFR73.55(c)(9)(ii).Encl Withheld
ML20100L424
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/27/1996
From: Ling B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VPNPD-96-013, VPNPD-96-13, NUDOCS 9603040203
Download: ML20100L424 (1)


Text

W

~

. WISCONSIN.

?dfT Electnc

~'

I POWER COMPANY

231 W PAcnioon. PO' Bon 2046 wwousee W153201-2046 (41412202345

.VPNPD-96-013 February 27,1996 -

r, Document Control Desk US NUCLEAR REGULATOP,Y COMMISSION '

Mail Station P!-137 Washington, DC 20555

Gentlemen:

. DOCKETS 50-266 AND 50-301

' VEHICLE CONTROL MEASURES AND VEHICLE BOMB COMPARISON POINT BEACH NUCLEAR PLANT. UNITS I AND 2 in a letter to your office dated February 21,1995, we forwarded the proposed vehicle control measures for our Point Beach Nuclear Plant (PBNP) in accordance with the requirements of 10 CFR 73.55(c)(9)(i). This letter fonvards the final vehicle control measures as implemented for PBNP in accordance with the requirements of 10 CFR 73.55(c)(9)(ii). These measures demonstrate compliance with 10 CFR 73.55(c)(7).

The subject matter of the attachment to this letter is safeguards information and is considered to be exempt from disclosure in accordance with 10 CFR 1. 50,70. and 73. When ecparated from the attachment, this docunient is not safeguards information.

If you have any questions or require additional information, please contact us.

Sincerely, j

)'

Bob Link j

Vice President Nuclear Power

' KVA/jg

' Attachment 1

I cc:

NRC Resident inspector i

NRC Regional Administrator, Region til Skip Young, NRC' 9603040203 960227 4

'.PDR ADOCK 05000266'

/ggh[

F

//l PDR 04CC43

~

(in/Al NU mown,cw

.