ML20100L000

From kanterella
Jump to navigation Jump to search
Forwards Thermal Mapping Rept 84-11 for 841103 for Thermal Monitoring Requirements. Rept Delayed Due to Interfacing Failure Between Testing & Lab Group & Mechanical Engineering Group
ML20100L000
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/04/1985
From: Willsey W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML20100L005 List:
References
NUDOCS 8504160333
Download: ML20100L000 (1)


Text

$0"AYf N #/YW PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19tO1 (215)841 4000 April 4, 1985 Mr. Thomas A.

Ippolito Operation Reactors Branch 3 Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Ippolito:

Enclosed is a copy of Thermal Mapping Report 84-11 covering the Isotherm Surveys for November 3, 1984.

The late submission of this survey report is due to an interfacing failure between the Testing and Laboratories group performing the boat survey and the Mechanical Engineering group responsible for preparation of the Isotherms and report.

This problem has been resolved by providing for a form verifying receipt of the boat survey by Mechanical Engineering.

This information has been completed in compliance with the reporting requirements set forth in Appendix B to the Peach Bottom Operating License Environmental Technical Specification and Bases.

Yours trul ctib "Y oustadd.

W. B. Willsey Director Environmental Affairs WBW:htr Enclosure cc:

Dr. Thomas E. Murley U.S. Nuclear Regulatory Commission OIE 631 Park Avenue King of Prussia, PA 19406 8504160333 850404

[7 PDR ADOCK 05000277 R

PDR pf7 t