Text
-
Commonwealth Illnon Company j
liraidwtxid Generating Station
!/
Route al, llox 8 4 liramille, IL M 607-9619 Tel H15-158 2801
)
February 15,1996 BW/96-0018 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Document Control Desk
Subject:
Braidwood Station's Unit 1 Reactor Containment Type A Integrated Leakage Rate Test NRC Docket Nos. 50-456 and 50-457 Enclosed is Comed's report for the " Reactor Containment Building Integrated Leak Rate Test," conducted from November ist through November 16,1995, for Braidwood Unit 1. This report is to be submitted to the NRC approximately three months after conducting the test in accordance with 10 CFR 50, Appendix J, Section V.
The report describes the third Unit 1 Type A containment leakage rate test perfoimed using Braidwood Technical Surveillance IBwVS 6.1.2.a-1, " Unit 1 Primary Containment Type A Integrated Leakage Rate Test (ILRT), " in accordance with the requirements of 10 CFR 50, Appendix J, Section III.A.
Should you have any questions, contact Harvey Cybul, Braidwood Systems Engineering Supervisor, at (815) 458-2801, extension 2243.
J. Tulon Station Manager Braidwood Nuclear Station 0:CORRESivCSTECifBW96-0018 Attachment cc:
- 11. J. Miller, NRC regional Administrator, Rill R. R. Assa, Project Manager, NRR C. Phillips, Senior Resident inspector I
9602220249 960215 PDR ADOCK 05000456 P
PDR 220054
,y1 1
m m C_sm, i
.