Advises That Control Room Enhancements Required by License Condition 8(a)3 Re Detailed Control Room Design Review Completed.Task Analysis & Control Room Inventory (License Condition 8(a)1) Scheduled for Completion by 850630
ML20100C528
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/21/1985
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
CON-#285-304, CON-#285-505 OL, NUDOCS 8503290129
Download: ML20100C528 (2)


Text

,.____-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

y PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 JOHN S KEMPER VIC E-PR ESID E NT March 21, 1985

. <........ o

...a ca Mr. A. Schwencer, Chief Docket Nos.:

50-352 Licensing Branch No. 2 50-353 U.S. Nuclear Regulatory Conmission Washington, D.C.

20555 FOL No.: NPF-27

SUBJECT:

Limerick Generating Station, Units 1 and 2 Satisfaction of License Condition 8(a)3 Detailed Control Room Design Review:

Control Rocm Enhancements

REFERENCE:

Letter, D. G. Eisenhut to E. G. Bauer, Jr.

" Issuance of Facility Operating License NPF-27 Limerick Generating Station, Unit 1",

October 26, 1984 FILE:

GOVT 1-1 (NRC)

Dear Mr. Schwencer:

License Condition 8(a)3 Detailed Control Room Design Review:

Control Room Enhancements requires that certain control room enhancements be completed prior to exceeding five percent (5%) of rated power. This letter is to advise you that these control room enhancements have been completed, and that this part of License Condition 8(a) has been satisfied. As stated in Attachment 4 to the reference letter, these enhancements are related to the control room panels (paint, tape and label), re-scaling of instruments using acceptable htman factors methods, and changes to standard control switch shapes.

The other two items required by License Condition 8(a), the Task Analysis and Control Room Inventory [8(a)1], and the Control Room Survey [8(a)2], are scheduled for completion by June 30, 1985 and March 27, 1985 respectively.

Sincerely,

$Yf DFC/dg/03188505 Copy to: (See Attached Service List) 9 Y

w2muMMiha S

F

t cc: Judge Helen F. Hoyt i-Judge derry Harbour l

Judge Richard F. Cole Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, Esq.

l Mr. Frank R. Romano l

Mr. Robert L. Anthony Ms. Phyllis Zitzer j

Charles W. Elliot, Esq.

Zori G. Ferkin, Esq.

Mr. Thomas Gerusky Director, Penna. Emergency Management Agency Angus R. Love, Esq.

David Wersan, Esq.

Robert J. Sugarman, Esq.

Martha W. Bush, Esq.

Spence W. Perry, Esq.

j day M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board t

l Atmic Safety & Licensing Board Panel l

Docket & Service Section Mr. James Wiggins Mr. Timothy R. S. Campbell I

t i

i~

l

- - _, = _..... _ _..-.--.--._-.-.--- -.-..-.-- -.-_.-......-_

. - -