ML20100C062

From kanterella
Jump to navigation Jump to search
Forwards Rev 27 to Issue 4 of BVPS Physical Security Plan. Plan Withheld
ML20100C062
Person / Time
Site: Beaver Valley
Issue date: 01/23/1996
From: George Thomas
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9601300028
Download: ML20100C062 (2)


Text

_ _.

SAFEGUARDS INFORMATION Qqm @ W e.g;v ;i.y eo.., stat,oa sngnoget ison-ooo4

.412) 643-8069 FAX oconce s mOMAS January 23,1996 U%." s.,*l.'"*"'

Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 BVPS Physical Security Plan (PSP)

Enclosed is Revision 27 to Issue 4 of the Beaver Valley Power Station (BVPS)

Physical Security Plan (PSP) (Base Plan and Training & Qualification Plan). These changes are being submitted based on the recent revision to 10 CFR 73.55 and/or the criteria described in NRC Generic Letter 95-08.

Revision 27 changes include the i

following:

1.

Base Plan Chapters 5 and 11 now contain a revised policy on reactor containment access via portals within a Vital Area. This is in accordance with the recent deletion of the 10 CFR 73.55(d)(8) requirement for specific access control for containment.

2.

Base Plan Chapter 5 is revised to delete specific reference to the type of construction used for the battery rooms since the battery rooms are located within a larger Vital Area.

3.

Base Plan Chapter 5 revises the statements regarding the intent to post, with a security force member, only those Vital Area barrier portals that are not within another Vital Area.

4.

Base Plan Chapter 13 was upgraded to reflect the use of longer record retention periods in accordance with 10 CFR 73.55 and 73.70 requirements.

5.

The Training and Qualification Plan (TQP) matrix has been revised regarding the

,3 training requirements for unarmed watchmen.

,{M gg 6.

The TQP for Officer Certification has been modified to allow for acceptance of 88 documented training and qualification of security personnel from other licensed nuclear facilities provided the training meets specified criteria as described in 10 8"

Ea:

CFR Part 73 Appendix B.

ENCLOSURES CONTAIN SAFECU ARDS eo lHFORMAT10H. UPON SEPARATION SAFEGUARDS INFORMATION taiS excE IS DECONTROLLED

~..

SAFEGUARDS INFORMATION Be:ver Valley Power Station, Unit No. I and No. 2 BVPS Physical Security Plan (PSP)

{

Page 2 i

7.

Additional TQP training tasks have been added for the other personnel classifications.

l 8.

Minor administrative and/or editorial changes were made to the Base and Trammg

& Qualification Plans.

These changes have been reviewed and judged not to decrease the safeguards effectiveness of the BVPS Physical Security Plan. Accordingly, this revision is being submitted in accordance with 10 CFR 50.54(p)(2).

The enclosed materials are considered proprietary under the provision of 10 CFR -

2.790(d), and Safeguards Information under the provisions of 10 CFR 73.21, and are thereby exempt from public disclosure.

If you have any questions concerning this matter, please contact Mike Johnston at (412) 393-7812.

Sincerely, t

Ge6rge S. Thomas Nnclosure c:

Addressee (4 copies of enclosure)

Mr. L. W. Rossbach, Sr. Resident Inspector (w/o enclosure)

Mr. T. T. Martin, NRC Region I Admmistrator (2 copies)

Mr. D. S. Brinkman, Sr. Project Manager (w/o enclosure) l ENCLOSURES CONTAIN SAFECUARDS INFORM ATION. UP0M SEP ARATION THIS P ACE IS DECONTROLLED i

SAFEGU ARDS INFORMATION

-